Planning of capacities and orders in build-to-order automobile production: A review
暂无分享,去创建一个
Thomas Spengler | Thomas Volling | Andreas Matzke | Martin Grunewald | T. Spengler | Thomas Volling | M. Grunewald | Andreas Matzke
[1] Thomas Volling. Auftragsbezogene Planung bei variantenreicher Serienproduktion , 2009 .
[2] Dirk C. Mattfeld,et al. Management logistischer Netzwerke , 2007 .
[3] B. Waller,et al. Market responsive manufacturing for the automotive supply chain , 2004 .
[4] Herbert Meyr,et al. Supply chain planning in the German automotive industry , 2004 .
[5] D. Simchi-Levi,et al. Dynamic Pricing and the Direct-to-Customer Model in the Automotive Industry , 2005, Electron. Commer. Res..
[6] Laureano F. Escudero,et al. Schumann, a modeling framework for supply chain management under uncertainty , 1999, Eur. J. Oper. Res..
[7] Angappa Gunasekaran,et al. Modeling and analysis of build-to-order supply chains , 2009, Eur. J. Oper. Res..
[8] Kenneth K. Boyer,et al. Manufacturing flexibility at the plant level , 1996 .
[9] Stefan Minner,et al. Manufacturing capacity planning and the value of multi-stage stochastic programming under Markovian demand , 2010 .
[10] Raul Poler Escoto,et al. Fuzzy optimization for supply chain planning under supply, demand and process uncertainties , 2009, Fuzzy Sets Syst..
[11] Ulrich Stautner. Kundenorientierte Lagerfertigung im Automobilvertrieb , 2001 .
[12] T. Santoso. A stochastic programming approach for supply chain network design under uncertainty , 2004 .
[13] Matthias Walter,et al. Evaluating volume flexibility instruments by design-of-experiments methods , 2011 .
[14] Fong-Yuen Ding,et al. Production planning to support mixed-model assembly , 2003, Comput. Ind. Eng..
[15] Robert R. Inman,et al. Product-to-plant allocation assessment in the automotive industry , 2002 .
[16] Terry P. Harrison. Global Supply Chain Design , 2001, Inf. Syst. Frontiers.
[17] Wenli Li,et al. Collaborative production planning of supply chain under price and demand uncertainty , 2011, Eur. J. Oper. Res..
[18] Saskia Gisa Luise Kauder. Strategische Planung internationaler Produktionsnetzwerke in der Automobilindustrie , 2008 .
[19] H. Graf. Innovative Logistics is a Vital Part of Transformable Factories in the Automotive Industry , 2006 .
[20] Stefan Minner,et al. Strategic Process Flexibility under Lifecycle Demand , 2009 .
[21] Robert E. Bixby,et al. Solving Real-World Linear Programs: A Decade and More of Progress , 2002, Oper. Res..
[22] N. Boysen,et al. Produktionsprogrammplanung bei Variantenfließfertigung , 2005 .
[23] Jörg Roscher. Bewertung von Flexibilitätsstrategien für die Endmontage in der Automobilindustrie , 2008 .
[24] H. Lorenz,et al. Jena Research Papers in Business and Economics Sequencing Mixed-Model Assembly Lines : Survey , Classification and Model Critique , 2007 .
[25] William C. Jordan,et al. Principles on the benefits of manufacturing process flexibility , 1995 .
[26] Serguei Netessine,et al. Supply Chain Structures on the Internet , 2004 .
[27] N. Slack. Flexibility as a Manufacturing Objective , 1983 .
[28] Lars-Erik Gadde,et al. Flexibility and rigidity in customization and build-to-order production , 2005 .
[29] Stephan Biller,et al. Managing Flexible Capacity in a Make-to-Order Environment , 2005, Manag. Sci..
[30] Reinhard Koether. Entstehung von Modell-Mix-Verlusten , 1986 .
[31] Kai-Ingo Voigt,et al. Journal of Enterprise Information Management Emerald Article : Flexibility and revenue management in the automotive industry , 2013 .
[32] Hyunbo Cho,et al. Collaborative fractal-based supply chain management based on a trust model for the automotive industry , 2010 .
[33] Philipp Robert Gneiting. Supply Chain Design für modulare Fahrzeugarchitekturen , 2009 .
[34] Armin Scholl,et al. A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..
[35] Herbert Meyr,et al. Strategic network planning for an international automotive manufacturer , 2009, OR Spectr..
[36] Christian rer. pol. Hayler. Ein regelbasiertes System zur Generierung von Orders für Lagerfahrzeuge : Fallstudie bei einem deutschen Automobilhersteller , 1999 .
[37] Wilfried Sihn,et al. Concept of transport-oriented scheduling for reduction of inbound logistics traffic in the automotive industries , 2011 .
[38] Matthias Holweg,et al. Towards responsive vehicle supply: a simulation-based investigation into automotive scheduling systems , 2005 .
[39] John M. Lucas,et al. PLANETS: A Modeling System for Business Planning , 1987 .
[40] A. Bolat. A mathematical model for selecting mixed models with due dates , 2003 .
[41] Robert R. Inman,et al. A mass production product-to-plant allocation problem , 2001 .
[42] Thomas Volling,et al. Revenue Management in Make-To-Order Manufacturing: Case Study of Capacity Control at ThyssenKrupp VDM , 2010 .
[43] Stefan Minner,et al. Machine and Labor Flexibility in Manufacturing Networks , 2011 .
[44] Joe Miemczyk,et al. Logistics in the “three‐day car” age , 2002 .
[45] M. Holweg,et al. Creating the customer‐responsive supply chain: a reconciliation of concepts , 2007 .
[46] Marc Goetschalckx,et al. Modeling and design of global logistics systems: A review of integrated strategic and tactical models and design algorithms , 2002, Eur. J. Oper. Res..
[47] Denis Royston Towill,et al. On the impact of order volatility in the European automotive sector , 2008 .
[48] Özgür Kabak,et al. Possibilistic linear-programming approach for supply chain networking decisions , 2011, Eur. J. Oper. Res..
[49] Linus Schrage,et al. OR Practice - A Scenario Approach to Capacity Planning , 1989, Oper. Res..
[50] Edsger W. Dijkstra,et al. A note on two problems in connexion with graphs , 1959, Numerische Mathematik.
[51] Barry L. Nelson,et al. Assessing the Benefits of Integrated Vehicle Life Cycle Planning , 2009 .
[52] Bart L. MacCarthy,et al. Fundamental behaviour of virtual-build-to-order systems , 2006 .
[53] Bart L. MacCarthy,et al. On Markovian approximations for virtual-build-to-order systems , 2010, J. Oper. Res. Soc..
[54] Matthias Holweg,et al. Linking Product Variety to Order-Fulfillment Strategies , 2004, Interfaces.
[55] Bart L. MacCarthy,et al. Mass Customization in the Automotive Industry: Comparing Interdealer Trading and Reconfiguration Flexibilities in Order Fulfillment , 2010 .
[56] Josefa Mula,et al. Production , Manufacturing and Logistics A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment , 2010 .
[57] E. Bish,et al. Impact of Manufacturing Flexibility on Supply Chain Performance in the Automotive Industry , 2002 .
[58] Nidhal Rezg,et al. Production planning in an assembly system with social and industrial constraints: a dynamic programming approach , 2007 .
[59] Julien Maheut,et al. A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler , 2012 .
[60] Stephen C. Graves,et al. Process Flexibility in Supply Chains , 2003, Manag. Sci..
[61] Suresh P. Sethi,et al. Flexibility in manufacturing: A survey , 1990 .
[62] Rudolf Kruse,et al. Adaptable Markov models in industrial planning , 2004, 2004 IEEE International Conference on Fuzzy Systems (IEEE Cat. No.04CH37542).
[63] Bart L. MacCarthy,et al. Mass Customization in the Automotive Industry: Comparing Interdealer Trading and Reconfiguration Flexibilities in Order Fulfillment: Mass Customization in the Automotive Industry , 2010 .
[64] Thomas Spengler,et al. Modeling and simulation of order-driven planning policies in build-to-order automobile production , 2011 .
[65] M. Holweg,et al. Successful Build-to-Order Strategies Start With the Customer , 2001 .
[66] Charu Chandra,et al. Evaluation of enterprise-level benefits of manufacturing flexibility , 2005 .
[67] Thomas Spengler,et al. Tactical Planning in Flexible Production Networks in the Automotive Industry , 2010, OR.
[68] Leena Suhl,et al. Aggregate production planning in the automotive industry with special consideration of workforce flexibility , 2011 .
[69] Bart L. MacCarthy,et al. Fundamental Modes of Operation for Mass Customization , 2003 .
[70] Khalil S. Hindi,et al. Formulation and solution of a selection and sequencing problem in car manufacture , 1994 .
[71] Achim Koberstein,et al. Modeling and optimizing of strategic and tactical production planning in the automotive industry under uncertainty , 2009, OR Spectr..
[72] William C. Jordan,et al. Integrated assembly line loading, design, and labor planning , 1997 .
[73] Bernhard Fleischmann,et al. Strategic Planning of BMW's Global Production Network , 2006, Interfaces.
[74] Stephan Biller,et al. Pricing for Environmental Compliance in the Auto Industry , 2006, Interfaces.
[75] David Gallear,et al. Decision support for build-to-order supply chain management through multiobjective optimization , 2012 .
[76] A. Gunasekaran,et al. Software Agents: Enabling Dynamic Supply Chain Management for a Build to Order Product Line , 2002, International Conference on Internet Computing.
[77] Nils Boysen,et al. Jena Research Papers in Business and Economics Production Planning of Mixed-Model Assembly Lines : Overview and Extensions , 2007 .
[78] Leena Suhl,et al. Flexibility Planning in Automotive Plants , 2007 .
[79] Wilhelm Dangelmaier,et al. Reconfiguration of assembly lines under the influence of high product variety in the automotive industry–a decision support system , 2010 .
[80] Charu Chandraa,et al. Evaluation of enterprise-level benefits of manufacturing flexibility , 2015, IEEE Engineering Management Review.