Mixed-model assembly line sequencing using beam search
暂无分享,去创建一个
[1] S. David Wu,et al. A new heuristic method for mixed model assembly line balancing problem , 2003 .
[2] Patrick R. McMullen,et al. A simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line , 2000 .
[3] Alf Kimms,et al. Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints , 2001, Manag. Sci..
[4] W. Kubiak. Minimizing variation of production rates in just-in-time systems: A survey☆ , 1993 .
[5] Ezey M. Dar-El,et al. Assembly line sequencing for model mix , 1975 .
[6] Sedef Meral,et al. Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems , 2001, Eur. J. Oper. Res..
[7] Avraham Shtub,et al. SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH , 1994 .
[8] R. R. Inman,et al. Sequencing JIT mixed-model assembly lines , 1991 .
[9] Ezey M. Dar-El,et al. Mixed-model assembly line sequencing problems , 1978 .
[10] Nick T. Thomopoulos,et al. Line Balancing-Sequencing for Mixed-Model Assembly , 1967 .
[11] Daesik Hur,et al. Mixed-model assembly line sequencing at Hyundai Motor Company , 1996 .
[12] Kenjiro Okamura,et al. A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor , 1979 .
[13] Yeongho Kim,et al. A genetic alorithm for multiple objective sequencing problems in mixed model assembly lines , 1998 .
[14] S. Sethi,et al. A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems" , 1991 .
[15] S. Afshin Mansouri,et al. A Multi-Objective Genetic Algorithm for mixed-model sequencing on JIT assembly lines , 2005, Eur. J. Oper. Res..
[16] Em Dar-El,et al. Optimal mixed-model sequencing for balanced assembly lines , 1977 .
[17] Joaquín Bautista,et al. Heuristics and exact algorithms for solving the Monden problem , 1996 .
[18] Ju Hyun Chul,et al. A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines , 1998, Comput. Oper. Res..
[19] P. Aravindan,et al. Genetic algorithms for sequencing problems in mixed model assembly lines , 2003, Comput. Ind. Eng..
[20] P. McMullen,et al. A beam search heuristic method for mixed-model scheduling with setups , 2005 .
[21] Roberta S. Russell,et al. Using beam search techniques for sequencing mixed-model assembly lines , 1997, Ann. Oper. Res..
[22] Ihsan Sabuncuoglu,et al. Job shop scheduling with beam search , 1999, Eur. J. Oper. Res..
[23] Liping Cheng,et al. AN EFFECTIVE MIXED-MODEL ASSEMBLY LINE SEQUENCING HEURISTIC FOR JUST-IN-TIME PRODUCTION SYSTEMS , 1993 .
[24] E A Duplaga,et al. Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis , 1998 .
[25] Jin Zhu,et al. A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines , 2000, Eur. J. Oper. Res..
[26] C Merengo,et al. Balancing and sequencing manual mixed-model assembly lines , 1999 .
[27] Yasuhiro Monden,et al. Bicriteria sequencing for just-in-time mixed-model assembly lines , 2000 .
[28] K. L. Mak,et al. A branch and bound algorithm for scheduling just-in-time mixed-model assembly lines , 1994 .
[29] Candace Arai Yano,et al. Sequencing to minimize work overload in assembly lines with product options , 1991 .
[30] Antonio Costa,et al. A comparative analysis of sequencing heuristics for solving the Toyota Goal Chasing problem , 2004 .
[31] I. Sabuncuoglu,et al. Stochastic assembly line balancing using beam search , 2005 .
[32] Edward R. Clayton,et al. An Evolutionary Algorithm for Sequencing Production on a Paced Assembly Line , 2000, Decis. Sci..
[33] John B. Kidd,et al. Toyota Production System , 1993 .
[34] Yeongho Kim,et al. Sequencing in mixed model assembly lines: A genetic algorithm approach , 1996, Comput. Oper. Res..
[35] John Miltenburg,et al. Scheduling mixed-model multi-level just-in-time production systems , 1989 .
[36] J. Miltenburg,et al. Algorithms for Scheduling Multi-Level Just-In-Time Production Systems , 1992 .
[37] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[38] Ihsan Sabuncuoglu,et al. Reactive scheduling in a dynamic and stochastic FMS environment , 2003 .
[39] G. J. Miltenburg,et al. Developing production schedules which balance part usage and smooth production loads for just‐in‐time production systems , 1991 .
[40] Robert T. Sumichrast,et al. Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems , 1990 .