Project Risk time Management – A Proposed Model and a Case Study in the Construction Industry

Abstract This paper proposes a mathematical model supporting the management of project risk. The model distinguishes between risks which have to be accepted and risks which can be eliminated at some cost, helping to decide which risks should be eliminated so that the customer requirements with respect to project completion time can be satisfied at minimal cost. The model is based on a modification of the PERT method and can be reduced to a mixed linear programming problem. The model is illustrated by means of a real world case concerning a construction project.

[1]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[2]  Dimitri Golenko-Ginzburg,et al.  A New Approach to the Activity-time Distribution in PERT , 1989 .

[3]  Gary David Holt,et al.  Factors impacting construction project duration: a comparison between France, Germany and the u.k. , 1998 .

[4]  Wei-Chih Wang Impact of soft logic on the probabilistic duration of construction projects , 2005 .

[5]  Amir Azaron,et al.  Lower bound for the mean project completion time in dynamic PERT networks , 2008, Eur. J. Oper. Res..

[6]  José García Pérez,et al.  A note on the reasonableness of PERT hypotheses , 2003, Oper. Res. Lett..

[7]  Francis Sourd,et al.  Scheduling with convex cost functions , 2000 .

[8]  Yousry H. Abdelkader Evaluating project completion times when activity times are Weibull distributed , 2004, Eur. J. Oper. Res..

[9]  Jan Magott,et al.  Estimating the mean completion time of PERT networks with exponentially distributed durations of activities , 1993 .

[10]  Dariusz Skorupka,et al.  The method of identification and quantification of construction projects risk , 2005 .

[11]  I. M. Premachandra An approximation of the activity duration distribution in PERT , 2001, Comput. Oper. Res..

[12]  Joseph J. Moder,et al.  Project Management With Cpm, Pert and Precedence Diagramming , 1983 .

[13]  Pierpaolo Pontrandolfo,et al.  Project duration in stochastic networks by the PERT-path technique , 2000 .

[14]  Makarand Hastak,et al.  ICRAM-1: Model for International Construction Risk Assessment , 2000 .

[15]  Ignacio E. Grossmann,et al.  The exact overall time distribution of a project with uncertain task durations , 2000, Eur. J. Oper. Res..

[16]  Francis Sourd,et al.  PERT scheduling with convex cost functions , 2003, Theor. Comput. Sci..

[17]  Edmundas Kazimieras Zavadskas,et al.  Multi-criteria Risk Assessment of a Construction Project , 2013, ITQM.

[18]  Jiayuan Wang,et al.  Factors affecting contractors’ risk attitudes in construction projects: Case study from China , 2011 .

[19]  Abdelhamid Benhocine,et al.  A new method for constructing a minimal PERT network , 2011 .

[20]  Kenneth R. Baker,et al.  PERT 21: Fitting PERT/CPM for use in the 21st century , 2012 .

[21]  Eugene David Hahn,et al.  Mixture densities for project management activity times: A robust approach to PERT , 2008, Eur. J. Oper. Res..

[22]  Ahmet Öztaş,et al.  Risk analysis in fixed-price design–build construction projects , 2004 .

[23]  D. Malcolm,et al.  Application of a Technique for Research and Development Program Evaluation , 1959 .