Single machine scheduling with deadlines to minimize the weighted number of tardy jobs
暂无分享,去创建一个
[1] Paolo Toth,et al. State-space relaxation procedures for the computation of bounds to routing problems , 1981, Networks.
[2] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[3] L. V. Wassenhove,et al. Algorithms for scheduling a single machine to minimize the weighted number of late jobs , 1988 .
[4] B. J. Lageweg,et al. Minimizing Total Costs in One-Machine Scheduling , 1975, Oper. Res..
[5] Eugene L. Lawler,et al. Scheduling a Single Machine to Minimize the Number of Late Jobs , 1983 .
[6] Philip Wolfe,et al. Validation of subgradient optimization , 1974, Math. Program..
[7] J. M. Moore,et al. A Functional Equation and its Application to Resource Allocation and Sequencing Problems , 1969 .
[8] T. S. Abdul-Razaq,et al. Dynamic Programming State-Space Relaxation for Single-Machine Scheduling , 1988 .