Development of an interval-credibility-chance constrained energy-water nexus system planning model—a case study of Xiamen, China

Abstract In this study, an interval-credibility-chance constrained programming (ICCCP) method which is capable of handling uncertainties presented as interval and interval-fuzzy-random values existed in the energy-water nexus (EWN) system is developed. An ICCCP-EWN model is formulated for planning energy-water nexus system of Xiamen that is heavily relies on fossil fuels (e.g., coal is a main energy source). A set of probability and credibility levels related to energy-water availabilities, energy-water demands, and pollutant-emission mitigations are examined. Results discover that uncertainties have significant effects on the system planning strategies. System cost, heat generation, imported energy, and water supply would decrease with the raised probability level and increase with the raised credibility level. Coal-fired would be the main contributor to electricity generation; however, its proportion would reduce from [59.4, 59.9]% to [40.5, 41.8]%. Gas-fired would increase from [27.4, 27.6]% to [41.5, 43.9]% of the total electricity generation. Surface water would be the main water source, sharing more than 65% of the total amount. One of the major water users would be gas-fired electricity generation, increasing from [32.1, 32.6]% to [42.1, 44.6]% in future. These findings can provide useful information for the study city to adjust the existing energy and water planning strategies to achieve the goal of sustainable development.

[1]  Patrizia Beraldi,et al.  A stochastic programming approach for the optimal management of aggregated distributed energy resources , 2018, Comput. Oper. Res..

[2]  Guohe Huang,et al.  Integer fuzzy credibility constrained programming for power system management , 2012 .

[3]  Velimir V. Vesselinov,et al.  Energy-water nexus: Balancing the tradeoffs between two-level decision makers , 2016 .

[4]  Y. P. Li,et al.  A type-2 fuzzy chance-constrained programming method for planning Shanghai’s energy system , 2017 .

[5]  Guohe Huang,et al.  A pseudo-optimal inexact stochastic interval T2 fuzzy sets approach for energy and environmental systems planning under uncertainty: A case study for Xiamen City of China , 2015 .

[6]  Samy Faddel,et al.  Ancillary Services Bidding for Uncertain Bidirectional V2G Using Fuzzy Linear Programming , 2018, Energy.

[7]  Weiwei Mo,et al.  The water-energy nexus at water supply and its implications on the integrated water and energy management. , 2018, The Science of the total environment.

[8]  Bin Chen,et al.  Energy–water nexus of international energy trade of China , 2017 .

[9]  Martin Anda,et al.  The role of water-energy nexus in optimising water supply systems – Review of techniques and approaches , 2018 .

[10]  Abraham Charnes,et al.  Response to Decision Problems Under Risk and Chance Constrained Programming: Dilemmas in the Transition , 1983 .

[11]  G. H. Huang,et al.  Mathematical Modeling for Water Quality Management under Interval and Fuzzy Uncertainties , 2013, J. Appl. Math..

[12]  Hedayat Saboori,et al.  Stochastic planning and scheduling of energy storage systems for congestion management in electric power systems including renewable energy resources , 2017 .

[13]  Kamal Youcef-Toumi,et al.  The impact of storage facility capacity and ramping capabilities on the supply side economic dispatch of the energy–water nexus , 2014 .

[14]  Alexandre Street,et al.  On the solution variability reduction of stochastic dual dynamic programming applied to energy planning , 2014, 2014 IEEE PES General Meeting | Conference & Exposition.

[15]  Xing Zhang,et al.  An interval full-infinite mixed-integer programming method for planning municipal energy systems - A case study of Beijing , 2011 .

[16]  Guohe Huang,et al.  A fuzzy-stochastic simulation-optimization model for planning electric power systems with considering peak-electricity demand: A case study of Qingdao, China , 2016 .

[17]  Mateus Ricardo Nogueira Vilanova,et al.  Exploring the water-energy nexus in Brazil: The electricity use for water supply , 2015 .

[18]  C. Tung,et al.  Stochastic competitive analysis of hydropower and water supplies within an energy–water nexus , 2018, Stochastic Environmental Research and Risk Assessment.

[19]  Amine Hocine,et al.  Optimizing renewable energy portfolios under uncertainty: A multi-segment fuzzy goal programming approach , 2018, Renewable Energy.

[20]  Rahmat-Allah Hooshmand,et al.  Stochastic programming-based optimal bidding of compressed air energy storage with wind and thermal generation units in energy and reserve markets , 2019, Energy.

[21]  Bin Chen,et al.  Energy-Water Nexus in Urban Industrial System , 2016 .

[22]  Laura Diaz Anadon,et al.  Life cycle water use of energy production and its environmental impacts in China. , 2013, Environmental science & technology.

[23]  Aramazd Muzhikyan,et al.  The synergistic role of renewable energy integration into the unit commitment of the energy water nexus , 2017 .

[24]  Beyzanur Cayir Ervural,et al.  A multi-objective decision-making approach for sustainable energy investment planning , 2018, Renewable Energy.

[25]  Guohe Huang,et al.  AN INEXACT TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR WATER RESOURCES MANAGEMENT UNDER UNCERTAINTY , 2000 .

[26]  M. M. Faruque Hasan,et al.  Optimization of water-energy nexus: A network representation-based graphical approach , 2018, Applied Energy.

[27]  Wei Wang,et al.  Energy–water nexus analysis in the Beijing–Tianjin–Hebei region: Case of electricity sector , 2018, Renewable and Sustainable Energy Reviews.

[28]  Ayşen Eren,et al.  Transformation of the water-energy nexus in Turkey: Re-imagining hydroelectricity infrastructure , 2018, Energy Research & Social Science.

[29]  Jing Liu,et al.  An Interval Fuzzy-Stochastic Chance-Constrained Programming Based Energy-Water Nexus Model for Planning Electric Power Systems , 2017 .

[30]  Mirko M. Stojiljković,et al.  Bi-level multi-objective fuzzy design optimization of energy supply systems aided by problem-specific heuristics , 2017 .

[31]  Onorio Saro,et al.  Water-energy and GHG nexus assessment of alternative heat recovery options in industry: A case study on electric steelmaking in Europe , 2017 .

[32]  Gordon H. Huang,et al.  IPWM: AN INTERVAL PARAMETER WATER QUALITY MANAGEMENT MODEL , 1996 .