An empirical analysis of job shop dispatch rule selection

[1]  L. Thurstone The method of paired comparisons for social values , 1927 .

[2]  Roger L. Sisson,et al.  Methods of Sequencing in Job Shops---A Review , 1959 .

[3]  G. A. Ferguson,et al.  Statistical analysis in psychology and education , 1960 .

[4]  William L. Maxwell,et al.  Network Dispatching by the Shortest-Operation Discipline , 1962 .

[5]  Earl LeGrande The Development of a Factory Simulation System Using Actual Operating Data , 1963 .

[6]  John M. Dutton,et al.  PRODUCTION SCHEDULING—A BEHAVIORAL MODEL , 1964 .

[7]  C. H. Kriebel,et al.  AN EMPIRICAL STUDY OF SCHEDULING DECISION BEHAVIOR. , 1965 .

[8]  J. William Gavett,et al.  Three Heuristic Rules for Sequencing Jobs to a Single Production Facility , 1965 .

[9]  William S. Gere Heuristics in Job Shop Scheduling , 1966 .

[10]  R. T. Nelson Labor and Machine Limited Production Systems , 1967 .

[11]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[12]  Salah E. Elmaghraby,et al.  The machine sequencing problem – review and extensions , 1968 .

[13]  Allen H. Spinner Sequencing theory – development to date† , 1968 .

[14]  Rosser T. Nelson,et al.  A Simulation of Labor Efficiency and Centralized Assignment in a Production Model , 1970 .

[15]  Kenneth R. Baker,et al.  Scheduling with parallel processors and linear delay costs , 1973 .

[16]  S. S. Panwalkar,et al.  Sequencing Research and the Industrial Scheduling Problem , 1973 .

[17]  C. A. Komar,et al.  The Effectiveness of Three Heuristic Rules for Job Sequencing in a Single Production Facility , 1973 .

[18]  C. Jones An Economic Evaluation of Job Shop Dispatching Rules , 1973 .

[19]  Charles A. Holloway,et al.  Job Shop Scheduling with Due Dates and Overtime Capability , 1974 .

[20]  Jon Frye Labor Flexibility in Multiechelon Dual-Constraint Job Shops , 1974 .

[21]  Ronald J. Ebert,et al.  Search and Simulation Selection of a Job-Shop Sequencing Rule , 1975 .

[22]  John S. Fryer Effects of Shop Size and Labor Flexibility in Labor and Machine Limited Production Systems , 1975 .

[23]  Suresh K. Jain A Simulation-Based Scheduling and Management Information System for a Machine Shop , 1975 .

[24]  William L. Berry,et al.  Critical Ratio Scheduling: An Experimental Analysis , 1975 .

[25]  Paul H Randolph Job shop scheduling--A case study , 1976 .

[26]  N. A. J. Hastings,et al.  A New Bound for Machine Scheduling , 1976 .

[27]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[28]  James K. Weeks,et al.  A Methodology for Assigning Minimum Cost Due-Dates , 1977 .

[29]  S. Elmaghraby The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .

[30]  Joseph R. Biggs HEURISTIC LOT-SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION-INVENTORY SYSTEM , 1979 .

[31]  David Burden,et al.  Production-Inventory Systems: Planning and Control , 1979 .

[32]  Donald R. Cooper,et al.  Business Research Methods , 1980 .