A taxonomy of line balancing problems and their solutionapproaches
暂无分享,去创建一个
[1] Matthias Amen,et al. An exact method for cost-oriented assembly line balancing , 2000 .
[2] Brahim Rekiek,et al. State of art of optimization methods for assembly line design , 2002, Annu. Rev. Control..
[3] Patrick R. McMullen,et al. A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations , 1997 .
[4] Ozcan Kilincci,et al. A P-invariant-based algorithm for simple assembly line balancing problem of type-1 , 2008 .
[5] Pedro M. Vilarinho,et al. ANTBAL: an ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations , 2006 .
[6] Harun Resit Yazgan,et al. A new algorithm and multi-response Taguchi method to solve line balancing problem in an automotive industry , 2011 .
[7] Ali Emrouznejad,et al. A mathematical model for assembly line balancing model to consider disordering sequence of workstations , 2009 .
[8] Brahim Rekiek,et al. Assembly Line Design: The Balancing of Mixed-Model Hybrid Assembly Lines with Genetic Algorithms , 2005 .
[9] Mostafa Zandieh,et al. Balancing of stochastic U-type assembly lines: an imperialist competitive algorithm , 2011 .
[10] J. Driscoll,et al. The definition of assembly line balancing difficulty and evaluation of balance solution quality , 2001 .
[11] Meral Azizoglu,et al. Bi criteria flexible assembly line design problem with equipment decisions , 2008 .
[12] Nils Boysen,et al. Designing parallel assembly lines with split workplaces: Model and optimization procedure , 2009 .
[13] Hadi Gökçen,et al. Balancing and sequencing of parallel mixed-model assembly lines , 2010 .
[14] Rafael Pastor,et al. The ASALB Problem with Processing Alternatives Involving Different Tasks: Definition, Formalization and Resolution , 2006, ICCSA.
[15] Uğur Özcan,et al. A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem , 2011 .
[16] George L. Nemhauser,et al. An Algorithm for the Line Balancing Problem , 1964 .
[17] Patrick R. McMullen,et al. Multi-objective assembly line balancing via a modified ant colony optimization technique , 2006 .
[18] Alexandre Dolgui,et al. A heuristic multi-start decomposition approach for optimal design of serial machining lines , 2008, Eur. J. Oper. Res..
[19] Ana S. Simaria,et al. 2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines , 2009, Comput. Ind. Eng..
[20] Türkay Dereli,et al. Two-sided assembly line balancing using an ant-colony-based heuristic , 2008 .
[21] Giovanni Mummolo,et al. The effect of dynamic worker behavior on flow line performance , 2009 .
[22] T. K. Bhattacharjee,et al. Complexity of single model assembly line balancing problems , 1990 .
[23] Yuval Cohen,et al. Optimizing the number of stations in assembly lines under learning for limited production , 1998 .
[24] Maurizio Faccio,et al. Balancing–sequencing procedure for a mixed model assembly system in case of finite buffer capacity , 2009 .
[25] Maurizio Faccio,et al. Sequencing procedure for balancing the workloads variations in case of mixed model assembly system with multiple secondary feeder lines , 2012 .
[26] Louis E. Yelle. THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY , 1979 .
[27] Stefan Bock,et al. Using distributed search methods for balancing mixed-model assembly lines in the automotive industry , 2008, OR Spectr..
[28] Alexandre Dolgui,et al. Combinatorial design of a minimum cost transfer line with parallel operations at workstations , 2007 .
[29] Gunhan Mirac Bayhan,et al. A hybrid genetic algorithm for mixed model assembly line balancing problem with parallel workstations and zoning constraints , 2011, Eng. Appl. Artif. Intell..
[30] Massimo Paolucci,et al. Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach , 2013 .
[31] Bilal Toklu,et al. Balancing of mixed-model two-sided assembly lines , 2009, Comput. Ind. Eng..
[32] Parames Chutima,et al. Multi-objective two-sided mixed-model assembly line balancing using particle swarm optimisation with negative knowledge , 2012, Comput. Ind. Eng..
[33] Konstantinos N. Genikomsakis,et al. Task proximity index: a novel measure for assessing the work-efficiency of assembly line balancing configurations , 2012 .
[34] Uğur Özcan,et al. A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives , 2008 .
[35] Bilal Toklu,et al. A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems , 2009, J. Intell. Manuf..
[36] Sungsoo Park,et al. A strong cutting plane algorithm for the robotic assembly line balancing problem , 1995 .
[37] Lale Özbakir,et al. Bees Algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem , 2012, Optim. Lett..
[38] Rita Gamberini,et al. A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem , 2006 .
[39] P. Aravindan,et al. A comparative evaluation of assembly line balancing Heuristics , 1999 .
[40] Wilbert E. Wilhelm,et al. A Column-Generation Approach for the Assembly System Design Problem with Tool Changes , 1999 .
[41] Christian Blum,et al. Beam-ACO for Simple Assembly Line Balancing , 2008, INFORMS J. Comput..
[42] Joaquín Bautista,et al. Procedures for the Time and Space constrained Assembly Line Balancing Problem , 2011, Eur. J. Oper. Res..
[43] Wilhelm Dangelmaier,et al. Reconfiguration of assembly lines under the influence of high product variety in the automotive industry–a decision support system , 2010 .
[44] Michael J. Magazine,et al. Assembly line balancing as generalized bin packing , 1982, Oper. Res. Lett..
[45] Gordon Johnson,et al. Currently practiced formulations for the assembly line balance problem , 1983 .
[46] Joaquín Bautista,et al. A Multiobjective GRASP for the 1/3 Variant of the Time and Space Assembly Line Balancing Problem , 2010, IEA/AIE.
[47] W. Wilhelm,et al. A family of hierarchical models for the design of deterministic assembly systems , 1997 .
[48] Joaquín Bautista,et al. Multiobjective memetic algorithms for time and space assembly line balancing , 2012, Eng. Appl. Artif. Intell..
[49] Xianzhong Dai,et al. A GA-based approach for optimizing single-part flow-line configurations of RMS , 2011, J. Intell. Manuf..
[50] Hui-Ming Wee,et al. Two-sided assembly lines balancing with assignment restrictions , 2013, Math. Comput. Model..
[51] Armin Scholl,et al. SALOME: A Bidirectional Branch-and-Bound Procedure for Assembly Line Balancing , 1997, INFORMS J. Comput..
[52] Nathalie Grangeon,et al. Heuristics for the re-balancing of a vehicle assembly line , 2011 .
[53] Yakup Atasagun,et al. Balancing straight and U-shaped assembly lines with resource dependent task times , 2011 .
[54] Alexandre Dolgui,et al. Stability measure for a generalized assembly line balancing problem , 2013, Discret. Appl. Math..
[55] Armin Scholl,et al. ULINO: Optimally balancing U-shaped JIT assembly lines , 1999 .
[56] Yakup Kara,et al. An approach for balancing and sequencing mixed-model JIT U-lines , 2007 .
[57] Alexandre Dolgui,et al. Optimal design of machines processing pipeline parts , 2012 .
[58] B. M. Dabade,et al. Evaluation of performance measures for representing operational objectives of a mixed model assembly line balancing problem , 2008 .
[59] Joaquín Bautista,et al. Multiobjective constructive heuristics for the 1/3 variant of the time and space assembly line balancing problem: ACO and random greedy search , 2010, Inf. Sci..
[60] M. Held,et al. Assembly-Line Balancing---Dynamic Programming with Precedence Constraints , 1963 .
[61] Jeonghan Ko,et al. Design of multi-product manufacturing lines with the consideration of product change dependent inter-task times, reduced changeover and machine flexibility , 2010 .
[62] Surendra M. Gupta,et al. A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..
[63] Weida Xu,et al. Robust balancing of mixed model assembly line , 2009 .
[64] Hadi Gökçen,et al. A chance-constrained approach to stochastic line balancing problem , 2007, Eur. J. Oper. Res..
[65] Sungsoo Park,et al. A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints , 1997 .
[66] Hoda A. ElMaraghy,et al. Design of single assembly line for the delayed differentiation of product variants , 2010 .
[67] Sheldon Howard Jacobson,et al. A Branch, Bound, and Remember Algorithm for the Simple Assembly Line Balancing Problem , 2012, INFORMS J. Comput..
[68] Xiaofeng Hu,et al. A station-oriented enumerative algorithm for two-sided assembly line balancing , 2008, Eur. J. Oper. Res..
[69] A.S. Simaria,et al. Meeting demand variation using flexible U-shaped assembly lines , 2009 .
[70] V. Mînzu,et al. Stochastic algorithm for tasks assignment in single or mixed-model assembly lines , 1998 .
[71] Andreas C. Nearchou,et al. Balancing large assembly lines by a new heuristic based on differential evolution method , 2007 .
[72] Ilker Baybars,et al. A survey of exact algorithms for the simple assembly line balancing , 1986 .
[73] Andreas C. Nearchou,et al. Multi-objective balancing of assembly lines by population heuristics , 2008 .
[74] Hadi Gökçen,et al. Balancing parallel assembly lines with precise and fuzzy goals , 2010 .
[75] Nima Hamta,et al. Bi-criteria assembly line balancing by considering flexible operation times , 2011 .
[76] Pablo Cortés,et al. Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study , 2010 .
[77] Hwai-En Tseng,et al. Hybrid evolutionary multi-objective algorithms for integrating assembly sequence planning and assembly line balancing , 2008 .
[78] Richard F. Deckro,et al. Balancing Cycle Time and Workstations , 1989 .
[79] Wilbert E. Wilhelm,et al. A cutting plane approach for the single-product assembly system design problem , 2000 .
[80] Alexandre Dolgui,et al. Optimisation of multi-position machines and transfer lines , 2008, European Journal of Operational Research.
[81] Sotirios G. Dimitriadis,et al. Assembly line balancing and group working: A heuristic procedure for workers' groups operating on the same product and workstation , 2006, Comput. Oper. Res..
[82] Amaia Lusa,et al. A survey of the literature on the multiple or parallel assembly line balancing problem , 2008 .
[83] Hon-Shiang Lau,et al. A Cost-Oriented Approach to Stochastic Line Balancing1 , 1973 .
[84] Alexandre Dolgui,et al. Reduction approaches for a generalized line balancing problem , 2012, Comput. Oper. Res..
[85] Angel B. Ruiz,et al. Balancing assembly lines: an industrial case study , 2004, J. Oper. Res. Soc..
[86] P. V. Mohanram,et al. Flow index based line balancing: a tool to improve the leanness of assembly line design , 2012 .
[87] Uğur Özcan,et al. A tabu search algorithm for two-sided assembly line balancing , 2009 .
[88] John F. Kottas,et al. A stochastic line balancing procedure , 1981 .
[89] Reza Tavakkoli-Moghaddam,et al. A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks , 2011 .
[90] Maghsud Solimanpur,et al. Using the Taguchi method to optimize the differential evolution algorithm parameters for minimizing the workload smoothness index in simple assembly line balancing , 2013, Math. Comput. Model..
[91] Alexandre Dolgui,et al. Integer programming models for logical layout design of modular machining lines , 2006, Comput. Ind. Eng..
[92] Ozcan Kilincci,et al. Firing sequences backward algorithm for simple assembly line balancing problem of type 1 , 2011, Comput. Ind. Eng..
[93] Surendra M. Gupta,et al. Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem , 2007 .
[94] Alexandre Dolgui,et al. Graph approach for optimal design of transfer machine with rotary table , 2009 .
[95] Soumen Ghosh,et al. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .
[96] Alexandre Dolgui,et al. Optimizing Modular Machining Line Design Problem with Mixed Activation Mode of Machining Units , 2007 .
[97] Parviz Fattahi,et al. A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem , 2011 .
[98] Michal Tzur,et al. Design of flexible assembly line to minimize equipment cost , 2000 .
[99] Hadi Gökçen,et al. Integrated line balancing to attain Shojinka in a multiple straight line facility , 2010, Int. J. Comput. Integr. Manuf..
[100] Jeonghan Ko,et al. Balancing of manufacturing systems with complex configurations for delayed product differentiation , 2008 .
[101] Alexandre Dolgui,et al. A survey of the self-balancing production lines (“bucket brigades”) , 2005, J. Intell. Manuf..
[102] Betul Yagmahan,et al. Mixed-model assembly line balancing using a multi-objective ant colony optimization approach , 2011, Expert Syst. Appl..
[103] Hamed Fazlollahtabar,et al. A heuristic methodology for assembly line balancing considering stochastic time and validity testing , 2011 .
[104] Frédéric Adam,et al. Encyclopedia of Decision Making and Decision Support Technologies , 2008 .
[105] Nur Evin Özdemirel,et al. Assembly line balancing with station paralleling , 2009, Comput. Ind. Eng..
[106] Hiroshi Katayama,et al. A multi-decision genetic approach for workload balancing of mixed-model U-shaped assembly line systems , 2009 .
[107] Masoud Rabbani,et al. Balancing of mixed-model two-sided assembly lines with multiple U-shaped layout , 2012 .
[108] Thomas R. Hoffmann. Assembly Line Balancing with a Precedence Matrix , 1963 .
[109] Ertan Güner,et al. Simple and U-type assembly line balancing problems with a learning effect , 2008 .
[110] Alexandre Dolgui,et al. A design of DSS for mass production machining systems , 2009 .
[111] Joaquín Bautista,et al. Including different kinds of preferences in a multi-objective ant algorithm for time and space assembly line balancing on different Nissan scenarios , 2011, Expert Syst. Appl..
[112] Irad Ben-Gal,et al. Backup strategy for robots’ failures in an automotive assembly system , 2009 .
[113] Rafael Pastor,et al. Heuristic procedures for solving the general assembly line balancing problem with setups , 2010 .
[114] Stephen C. Graves,et al. Equipment selection and task assignment for multiproduct assembly system design , 1988 .
[115] Lale Özbakir,et al. Multiple-colony ant algorithm for parallel assembly line balancing problem , 2011, Appl. Soft Comput..
[116] Ana S. Simaria,et al. Combining heuristic procedures and simulation models for balancing a PC camera assembly line , 2005, Comput. Ind. Eng..
[117] Armin Scholl,et al. Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure , 2009, Eur. J. Oper. Res..
[118] Weida Xu,et al. Strategic robust mixed model assembly line balancing based on scenario planning , 2011 .
[119] Hans Otto Günther,et al. A GA-based solution approach for balancing printed circuit board assembly lines , 2008, OR Spectr..
[120] Lothar Thiele,et al. Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..
[121] Thomas R. Hoffman. Eureka: a hybrid system for assembly line balancing , 1992 .
[122] Alexandre Dolgui,et al. Robust balancing of straight assembly lines with interval task times , 2013, J. Oper. Res. Soc..
[123] Fulya Altiparmak,et al. Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm , 2011, Comput. Ind. Eng..
[124] Angel B. Ruiz,et al. Balancing assembly lines with tabu search , 2006, Eur. J. Oper. Res..
[125] Parames Chutima,et al. Mixed-Model U-Shaped Assembly Line Balancing Problems with Coincidence Memetic Algorithm , 2010, J. Softw. Eng. Appl..
[126] Ugur Özcan,et al. Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm , 2010, Eur. J. Oper. Res..
[127] Anton V. Eremeev,et al. Metaheuristic approaches for the design of machining lines , 2011 .
[128] Armin Scholl,et al. Incorporating ergonomic risks into assembly line balancing , 2011, Eur. J. Oper. Res..
[129] Armin Scholl,et al. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..
[130] Dirk Biskup,et al. Single-machine scheduling with learning considerations , 1999, Eur. J. Oper. Res..
[131] Alexandre Dolgui,et al. Balancing lines with CNC machines: A multi-start ant based heuristic , 2010 .
[132] Bhaba R. Sarker,et al. A generalized approach for serial or parallel line balancing , 1983 .
[133] Surendra M. Gupta,et al. Ant colony optimization for disassembly sequencing with multiple objectives , 2006 .
[134] Alexandre Dolgui,et al. A special case of transfer lines balancing by graph approach , 2006, Eur. J. Oper. Res..
[135] Alexandre Dolgui,et al. Exact and heuristic algorithms for balancing transfer lines when a set of available spindle heads is given , 2008, Int. Trans. Oper. Res..
[136] Alexandre Dolgui,et al. A decision support system for design of mass production machining lines composed of stations with rotary or mobile table , 2012 .
[137] Alexandre Dolgui,et al. Enhanced mixed integer programming model for a transfer line design problem , 2012, Comput. Ind. Eng..
[138] Wen-Chyuan Chiang,et al. An optimal piecewise-linear program for the U-line balancing problem with stochastic task times , 2006, Eur. J. Oper. Res..
[139] Alexandre Dolgui,et al. Stability analysis of an optimal balance for an assembly line with fixed cycle time , 2006, Eur. J. Oper. Res..
[140] Nils Boysen,et al. Assembly line balancing: Joint precedence graphs under high product variety , 2009 .
[141] Derek Yip-Hoi,et al. Design Principles for Machining System Configurations , 2002 .
[142] Alexandre Dolgui,et al. A reactive GRASP and Path Relinking for balancing reconfigurable transfer lines , 2012 .
[143] Carlos Andrés,et al. Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled , 2008, Discret. Appl. Math..
[144] Fariborz Jolai,et al. Multi-criteria decision making for assembly line balancing , 2009, J. Intell. Manuf..
[145] A. Dolgui,et al. A heuristic approach for transfer lines balancing , 2005, J. Intell. Manuf..
[146] M. M. Nkasu,et al. A stochastic approach to assembly line balancing , 1995 .
[147] M. Gen,et al. Solving fuzzy assembly-line balancing problem with genetic algorithms , 1995 .
[148] Ruey-Shun Chen,et al. A hybrid genetic algorithm approach on multi-objective of assembly planning problem , 2002 .
[149] Alexandre Dolgui,et al. Minimizing makespan for multi-spindle head machines with a mobile table , 2009, Comput. Oper. Res..
[150] Oscar Cordón,et al. An advanced multiobjective genetic algorithm design for the time and space assembly line balancing problem , 2011, Comput. Ind. Eng..
[151] D. Popovici,et al. Cellular Genetic Algorithm with Communicating Grids for Assembly Line Balancing Problems , 2010 .
[152] Patrick R. McMullen,et al. Using Ant Techniques to Solve the Assembly Line Balancing Problem , 2003 .
[153] Susana Relvas,et al. Alexandre Dolgui and Jean-Marie Proth, Supply Chain Engineering - Useful Methods and Techniques , Springer-Verlag (2010) 541 pp., ISBN: 978-1-84996-016-8 , 2010, Eur. J. Oper. Res..
[154] Alexandre Dolgui,et al. Decision making and support tools for design of machining systems , 2010 .
[155] Yeo Keun Kim,et al. A mathematical model and a genetic algorithm for two-sided assembly line balancing , 2009, Comput. Oper. Res..
[156] Georghios P. Sphicas,et al. Deterministic Equivalents for Stochastic Assembly Line Balancing , 1976 .
[157] Keith C. C. Chan,et al. Handling the assembly line balancing problem in the clothing industry using a genetic algorithm , 1998 .
[158] Mitsuo Gen,et al. An efficient approach for type II robotic assembly line balancing problems , 2009, Comput. Ind. Eng..
[159] Alexandre Dolgui,et al. Multi-Objective Approach for Production Line Equipment Selection , 2012 .
[160] Tadeusz Sawik,et al. Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line , 2002, Eur. J. Oper. Res..
[161] Andreas C. Nearchou,et al. Multi-objective fuzzy assembly line balancing using genetic algorithms , 2012, J. Intell. Manuf..
[162] Alexandre Dolgui,et al. MIP approach to balancing transfer lines with blocks of parallel operations , 2006 .
[163] Alexandre Dolgui,et al. Equipment Location in Machining Transfer Lines with Multi-spindle Heads , 2013, J. Math. Model. Algorithms Oper. Res..
[164] Thomas R. Hoffmann,et al. Assembly line balancing: a set of challenging problems , 1990 .
[165] Jonathan F. Bard,et al. Assembly line balancing with parallel workstations and dead time , 1989 .
[166] Albert Corominas,et al. Balancing assembly line with skilled and unskilled workers , 2008 .
[167] D. Daniel Sheu,et al. Line balance analyses for system assembly lines in an electronic plant , 2008 .
[168] John M. Wilson. Formulation of a problem involving assembly lines with multiple manning of work stations , 1986 .
[169] Hui Wang,et al. Automatic generation of assembly system configuration with equipment selection for automotive battery manufacturing , 2011 .
[170] Alexandre Dolgui,et al. Comparison of exact and heuristic methods for a transfer line balancing problem , 2009 .
[171] Ching-Ter Chang,et al. Multi-objective approaches to balance mixed-model assembly lines for model mixes having precedence conflicts and duplicable common tasks , 2011 .
[172] Alexandre Dolgui,et al. A MIP approach for balancing transfer line with complex industrial constraints , 2010, Comput. Ind. Eng..
[173] Armin Scholl,et al. Balancing and Sequencing of Assembly Lines , 1995 .
[174] Andreas C. Nearchou,et al. Maximizing production rate and workload smoothing in assembly lines using particle swarm optimization , 2011 .
[175] Xiaofeng Hu,et al. A branch-and-bound algorithm for two-sided assembly line balancing , 2008 .
[176] Armin Scholl,et al. A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..
[177] P. K. Agrawal. The related activity concept in assembly line balancing , 1985 .
[178] Askiner Gungor,et al. A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .
[179] Krzysztof Fleszar,et al. An enumerative heuristic and reduction methods for the assembly line balancing problem , 2003, Eur. J. Oper. Res..
[180] Alexandre Dolgui,et al. Modelling transfer line design problem via a set partitioning problem , 2012, Optim. Lett..
[181] Tung-Meng Chang,et al. SIMULTANEOUS PERSPECTIVE-BASED MIXED-MODEL ASSEMBLY LINE BALANCING PROBLEM , 2010 .
[182] Majid Aminnayeri,et al. Type II robotic assembly line balancing problem: An evolution strategies algorithm for a multi-objective model , 2012 .
[183] Albert Corominas,et al. Assembly line balancing with incompatibilities and bounded workstation loads , 2000 .
[184] El Houssaine Aghezzaf,et al. A Lagrangian relaxation technique for the general assembly line balancing problem , 1995, J. Intell. Manuf..
[185] Ozcan Kilincci. A Petri net-based heuristic for simple assembly line balancing problem of type 2 , 2010 .
[186] Alexandre Dolgui,et al. Balancing of simple assembly lines under variations of task processing times , 2012, Ann. Oper. Res..
[187] A. L. Arcus,et al. COMSOAL: a computer method of sequencing operations for assembly lines , 1965 .
[188] Adil Baykasoglu,et al. Multi-rule Multi-objective Simulated Annealing Algorithm for Straight and U Type Assembly Line Balancing Problems , 2006, J. Intell. Manuf..
[189] Alexandre Dolgui,et al. An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem , 2009, J. Heuristics.
[190] Maurizio Faccio,et al. Mixed model assembly system with multiple secondary feeder lines: layout design and balancing procedure for ATO environment , 2012 .
[191] Mitsuo Gen,et al. An efficient multiobjective genetic algorithm for mixed-model assembly line balancing problem considering demand ratio-based cycle time , 2011, J. Intell. Manuf..
[192] Can Akkan,et al. Task-failure-driven rebalancing of disassembly lines , 2012 .
[193] Alexandre Dolgui,et al. Branch and bound algorithm for a transfer line design problem: Stations with sequentially activated multi-spindle heads , 2009, Eur. J. Oper. Res..
[194] Roger V. Johnson,et al. Optimally balancing large assembly lines with `FABLE' , 1988 .
[195] Mitsuo Gen,et al. U-shaped assembly line balancing problem with genetic algorithm , 2008 .
[196] James R. Jackson,et al. A Computing Procedure for a Line Balancing Problem , 1956 .
[197] Turan Paksoy,et al. Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing , 2009, Eur. J. Oper. Res..
[198] Roger V. Johnson,et al. A Branch and Bound Algorithm for Assembly Line Balancing Problems with Formulation Irregularities , 1983 .
[199] Rita Gamberini,et al. A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem , 2009 .
[200] Alexandre Dolgui,et al. Balancing modular transfer lines with serial-parallel activation of spindle heads at stations , 2009, Discret. Appl. Math..
[201] Uğur Özcan,et al. Balancing two-sided assembly lines with sequence-dependent setup times , 2010 .
[202] A. Raouf,et al. A new method for assembly line balancing having stochastic work elements , 1982 .
[203] Yixiong Feng,et al. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .
[204] Gyunghyun Choi,et al. A goal programming mixed-model line balancing for processing time and physical workload , 2009, Comput. Ind. Eng..
[205] Joaquín Bautista,et al. A dynamic programming based heuristic for the assembly line balancing problem , 2009, Eur. J. Oper. Res..
[206] Alf Kimms,et al. Minimal investment budgets for flow line configuration , 1998 .
[207] Hadi Gökçen,et al. A goal programming approach to simple U-line balancing problem , 2006, Eur. J. Oper. Res..
[208] Peter A. Pinto,et al. Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations , 1981 .
[209] Carlos Andrés,et al. Advantages of assembly lines in Sheltered Work Centres for Disabled. A case study , 2007 .
[210] Alexandre Dolgui,et al. A random search and backtracking procedure for transfer line balancing , 2005, Int. J. Comput. Integr. Manuf..
[211] Christian Blum,et al. On solving the assembly line worker assignment and balancing problem via beam search , 2011, Comput. Oper. Res..
[212] Ertan Güner,et al. Assembly line balancing problem with deterioration tasks and learning effect , 2010, Expert Syst. Appl..
[213] G. M. Buxey,et al. Assembly Line Balancing with Multiple Stations , 1974 .
[214] Yossi Bukchin,et al. A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs , 2006, Eur. J. Oper. Res..
[215] Joaquín Bautista,et al. Ant algorithms for a time and space constrained assembly line balancing problem , 2007, Eur. J. Oper. Res..
[216] Jeonghan Ko,et al. Design of assembly lines with the concurrent consideration of productivity and upper extremity musculoskeletal disorders using linear models , 2012, Comput. Ind. Eng..
[217] Latif Salum,et al. Rule-based modeling and constraint programming based solution of the assembly line balancing problem , 2012, Expert Syst. Appl..
[218] Jacob Rubinovitz,et al. A weighted approach for assembly line design with station paralleling and equipment selection , 2003 .
[219] Nils Boysen,et al. A classification of assembly line balancing problems , 2007, Eur. J. Oper. Res..
[220] I. Y. Kim,et al. Adaptive weighted-sum method for bi-objective optimization: Pareto front generation , 2005 .
[221] Soumen Ghosh,et al. Assembly line research: Historical roots, research life cycles and future directions , 1991 .
[222] Wing-Keung Wong,et al. Developing a genetic optimisation approach to balance an apparel assembly line , 2006 .
[223] Alexandre Dolgui,et al. Scenario based robust line balancing: Computational complexity , 2012, Discret. Appl. Math..
[224] Ozcan Kilincci,et al. A Petri net approach for simple assembly line balancing problems , 2006 .
[225] Wen-Chyuan Chiang,et al. Line balancing in a just-in-time production environment: balancing multiple U-lines , 2007 .
[226] Pedro M. Vilarinho,et al. A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations , 2002 .
[227] Alexandre Dolgui,et al. Algorithms and implementation of a set partitioning approach for modular machining line design , 2012, Comput. Oper. Res..
[228] Yeongho Kim,et al. Two-sided assembly line balancing: A genetic algorithm approach , 2000 .
[229] Nguyen Van Hop,et al. A heuristic solution for fuzzy mixed-model line balancing problem , 2006, Eur. J. Oper. Res..
[230] Patrick R. McMullen,et al. Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations , 1998 .
[231] Yeongho Kim,et al. Two-sided assembly line balancing to maximize work relatedness and slackness , 2001 .
[232] Adil Baykasoğlu,et al. Stochastic U-line balancing using genetic algorithms , 2007 .
[233] David Sparling. Balancing Just-In-Time Production Units: The N U-Line Balancing Problem , 1998 .
[234] Nils Boysen,et al. The sequence-dependent assembly line balancing problem , 2008, OR Spectr..
[235] Mostafa Zandieh,et al. Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS , 2011 .
[236] Mehmet Ali Ilgin,et al. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.
[237] Albert Corominas,et al. Assembly line balancing: general resource-constrained case , 2011 .
[238] Rafael Pastor,et al. A heuristic procedure for solving the Lexicographic Bottleneck Assembly Line Balancing Problem (LB-ALBP) , 2012 .
[239] Thomas O. Boucher. Choice of assembly line design under task learning , 1987 .
[240] Jeong-Hun Lee,et al. Integrated assembly line balancing with resource restrictions , 2009 .
[241] Maurizio Faccio,et al. Design configuration for a mixed-model assembly system in case of low product demand , 2007 .
[242] Yuehong Yin,et al. Assembly line balancing based on an adaptive genetic algorithm , 2010 .
[243] Joaquín Bautista,et al. A new diversity induction mechanism for a multi-objective ant colony algorithm to solve a real-world time and space assembly line balancing problem , 2011, Memetic Comput..
[244] Vittorio Maniezzo,et al. Matheuristics: Hybridizing Metaheuristics and Mathematical Programming , 2009 .
[245] Chih-Chung Lo,et al. Using throughput profit for selecting manufacturing process plan , 1997 .
[246] Jie Gao,et al. A multi-objective genetic algorithm for mixed-model assembly line rebalancing , 2013, Comput. Ind. Eng..
[247] Alexandre Dolgui,et al. Line configuration to minimize setup costs , 2012, Math. Comput. Model..
[248] Maurizio Faccio,et al. Evaluation of the mixed-model assembly line balancing problem with variable operation times and product mix , 2010 .
[249] Levent Kandiller,et al. Profit-oriented disassembly-line balancing , 2008 .
[250] Hadi Gökçen,et al. Shortest-route formulation of mixed-model assembly line balancing problem , 1999, Eur. J. Oper. Res..
[251] Konstantinos N. Genikomsakis,et al. Enhancing the Largest Set Rule for Assembly Line Balancing Through the Concept of Bi-Directional Work Relatedness , 2010, J. Adv. Comput. Intell. Intell. Informatics.
[252] Semra Tunali,et al. A review of the current applications of genetic algorithms in assembly line balancing , 2008, J. Intell. Manuf..
[253] Alexandre Dolgui,et al. Balancing large-scale machining lines with multi-spindle heads using decomposition , 2006 .
[254] Kürşad Ağpak,et al. A NEW ALGORITHM FOR U-SHAPED TWO-SIDED ASSEMBLY LINE BALANCING , 2010 .
[255] Anton V. Eremeev,et al. MIP-based GRASP and Genetic Algorithm for Balancing Transfer Lines , 2010, Matheuristics.
[256] William V. Gehrlein,et al. A comparative evaluation of heuristic line balancing techniques , 1986 .
[257] Amiya K. Chakravarty. Line Balancing With Task Learning Effects , 1988 .
[258] Shiqi Zhang,et al. Research on flexible transfer line schematic design using hierarchical process planning , 2002 .
[259] Rafael Pastor. LB-ALBP: the lexicographic bottleneck assembly line balancing problem , 2011 .
[260] Nils Boysen,et al. Assembly line balancing: Which model to use when? , 2006 .
[261] Fayez F. Boctor,et al. A Multiple-rule Heuristic for Assembly Line Balancing , 1995 .
[262] Wilbert E. Wilhelm,et al. A Branch and Cut Approach for Workload Smoothing on Assembly Lines , 1997, INFORMS J. Comput..
[263] N. K. Womer. Learning Curves, Production Rate, and Program Costs , 1979 .
[264] Ton G. de Kok,et al. The mixed and multi model line balancing problem: a comparison , 1997, Eur. J. Oper. Res..
[265] Turan Paksoy,et al. Supply chain optimisation with assembly line balancing , 2012 .
[266] Subhash C. Sarin,et al. A methodology for solving single-model, stochastic assembly line balancing problem , 1999 .
[267] Nai-Chieh Wei,et al. A solution procedure for type E simple assembly line balancing problem , 2011, Comput. Ind. Eng..
[268] Jinsong Bao,et al. A branch-and-bound algorithm to minimize the line length of a two-sided assembly line , 2010, Eur. J. Oper. Res..
[269] Subhash C. Sarin,et al. A survey of the assembly line balancing procedures , 1998 .
[270] Ihsan Sabuncuoglu,et al. Ant colony optimization for the single model U-type assembly line balancing problem , 2009 .
[271] Lale Özbakır,et al. Bee colony intelligence in zone constrained two-sided assembly line balancing problem , 2011, Expert Syst. Appl..
[272] Nils Boysen,et al. Jena Research Papers in Business and Economics Balancing mixed-model assembly lines : A computational evaluation of objectives to smoothen workload , 2008 .
[273] Carlos Andrés,et al. Balancing and scheduling tasks in assembly lines with sequence-dependent setup times , 2008, Eur. J. Oper. Res..
[274] J. L. C. Macaskill,et al. Production-Line Balances for Mixed-Model Lines , 1972 .
[275] Charles R. Standridge,et al. Modeling and Analysis of Manufacturing Systems , 1993 .
[276] Nils Boysen,et al. A versatile algorithm for assembly line balancing , 2008, Eur. J. Oper. Res..
[277] Matthias Amen,et al. Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds , 2006, Eur. J. Oper. Res..
[278] Alysson M. Costa,et al. Job rotation in assembly lines employing disabled workers , 2009 .
[279] Alexandre Dolgui,et al. Balancing machining lines: a two-phase heuristic , 2010 .
[280] Mostafa Zandieh,et al. A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks , 2011 .
[281] Kien Ming Ng,et al. Branch-and-bound algorithms for simple assembly line balancing problem , 2008 .
[282] Bilal Toklu,et al. Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models , 2009, Comput. Oper. Res..
[283] J. Bukchin,et al. A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment , 1998 .
[284] Rafael Pastor,et al. An improved mathematical program to solve the simple assembly line balancing problem , 2009 .
[285] Avraham Shttjb. The effect of incompletion cost on line balancing with multiple manning of work stations , 1984 .