The value of setup cost reduction and process improvement for the economic production quantity model with defects

This paper investigates the effect of imperfect yield on economic production quantity decisions. The production system is assumed to produce some time-varying proportion of defective parts which can be repaired at some unit cost. For a general defect rate function, we develop results that characterize the optimal run length and expected total cost and how these objects are affected by the cost parameters. Two kinds of investments in process improvements are considered: (i) reducing setup costs and (ii) improving process quality. We develop expressions for the marginal value of both setup cost reduction and process improvement and discuss the relationship between these marginal values and problem cost parameters. We show that any investment in setup cost reduction will result in a reduction in the number of defects produced, and the total number of defects can increase or decrease with an investment in quality improvement.

[1]  M. J. Rosenblatt,et al.  A generalized quantity discount pricing model to increase supplier's profits , 1986 .

[2]  J. C. Hayya,et al.  Setup Reduction in the Economic Production Quantity Model , 1992 .

[3]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[4]  Abraham Mehrez,et al.  An Overview of Representative Research of the Relationships Between Quality and Inventory , 1998 .

[5]  Hau L. Lee,et al.  Lot Sizing with Random Yields: A Review , 1995, Oper. Res..

[6]  Kai-Ling Mak Inventory control of defective products when the demand is partially captive , 1985 .

[7]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[8]  Meir J. Rosenblatt,et al.  A Comparative Study of Continuous and Periodic Inspection Policies in Deteriorating Production Systems , 1986 .

[9]  Jack C. Hayya,et al.  Joint investment in quality improvement and setup reduction , 1995, Comput. Oper. Res..

[10]  M. A. Rahim JOINT DETERMINATION OF PRODUCTION QUANTITY, INSPECTION SCHEDULE, AND CONTROL CHART DESIGN , 1994 .

[11]  Evan L. Porteus Investing in Reduced Setups in the EOQ Model , 1985 .

[12]  Meir J. Rosenblatt,et al.  Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .

[13]  W. Shih Optimal inventory policies when stockouts result from defective products , 1980 .

[14]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[15]  T.C.E. Cheng,et al.  EPQ with Process Capability and Quality Assurance Considerations , 1991 .

[16]  M. Javad Paknejad,et al.  Quality improvement and setup reduction in the joint economic lot size model , 2002, Eur. J. Oper. Res..

[17]  Xin Zhang,et al.  Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .

[18]  S. Goyal,et al.  Integrated inventory models: The buyer-vendor coordination , 1989 .