Time-managed material flow control
暂无分享,去创建一个
[1] Subhash C. Sarin,et al. Selection of a set of part delivery dates in a multi-job stochastic assembly system , 1988 .
[2] Wilbert E. Wilhelm,et al. A recursion model for cellular production/assembly systems , 1992 .
[3] P. C. Pandey,et al. A computer simulation study of manual flow lines , 1983 .
[4] Dennis B. Webster,et al. An investigation of a two-stage production line with normally distributed interarrival and service time distributions , 1976 .
[5] W. E. Wilhelm. A model to approximate transient performance of the flowshop , 1986 .
[6] W. E. Wilhelm,et al. On the normality of operation times in small-lot assembly systems: a technical note , 1987 .
[7] W. E. Wilhelm,et al. An Approach for Modeling Small-lot Assembly Networks , 1986 .
[8] Shimon Y. Nof,et al. Performance analysis of robotic kitting systems , 1989 .
[9] Ray Wild,et al. A note on the operating characteristics of‘ balanced’ and ‘ unbalanced’ production flow lines , 1972 .
[10] Warren H. Thomas,et al. Balancing Stochastic Assembly Lines , 1973 .
[11] William L. Maxwell,et al. Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems , 1985, Oper. Res..
[12] W. E. Wilhelm,et al. The application of lognormal models of transient operations in the flexible manufacturing environment , 1986 .
[13] C. E. Clark. The Greatest of a Finite Set of Random Variables , 1961 .
[14] S. Saboo,et al. Recursion models for describing and managing the transient flow of materials in generalized flowlines , 1989 .
[15] W. E. Wilhelm,et al. Description of certain correlation processes in flowlines , 1987 .
[16] E. Muth. The production rate of a series of work stations with variable service times , 1973 .
[17] Shimon Y. Nof,et al. Design method of robot kitting system for flexible assemble , 1991, Robotics Auton. Syst..
[18] W. E. Wilhelm,et al. A Methodology to Describe Operating Characteristics of Assembly Systems , 1982 .
[19] Charles R. Cash,et al. A modeling approach to aid in designing robotized manufacturing cells , 1987, J. Field Robotics.
[20] Willis R. Greer,et al. Normal approximations for the greater of two normal random variables , 1979 .
[21] W. R. Buckland,et al. Distributions in Statistics: Continuous Multivariate Distributions , 1973 .
[22] W. E. Wilhelm. An approach for modeling transient material flows in robotized manufacturing cells , 1986 .
[23] W. E. Wilhelm,et al. S u models of the maximum of several dependent random variables: development and computer application , 1986 .
[24] Shimon Y. Nof,et al. Part kitting in robotic facilities , 1986 .
[25] Shimon Y. Nof,et al. Observations on the normality of batch production times in flexible manufacturing cells , 1987 .
[26] A. S. Carrie. Correlation theory applied to work-flow measurement , 1971 .
[27] R. A. Johnson,et al. An approach for designing capacity and managing material flow in small-lot assembly lines , 1986 .
[28] Shimon Y. Nof,et al. Performance evaluation of a flexible manufacturing cell with random multiproduct feedback flow , 1985 .
[29] Subhash C. Sarin,et al. Determination of optimal part delivery dates in a stochastic assembly line , 1987 .
[30] W. E. Wilhelm,et al. A model for implementing a paradigm of time-managed, material flow control in certain assembly systems , 1992 .
[31] Li-Chih Wang,et al. PERT-BASED PARADIGM FOR MODELING ASSEMBLY OPERATIONS , 1993 .
[32] Lyang Suan Wang,et al. Management of component accumulation in small-lot assembly systems , 1986 .
[33] B. Tudehope. The transition-point method to meet due-dates and minimize the make-span in the general job-shop sequencing problem∗ , 1972 .