Experimental Test on the TPS Booster Injection Scheme Exploration and the Associated Bunch Train Analysis
暂无分享,去创建一个
In order to explore the tuning range of injection septum and kicker for TPS booster operation, an experimental test on the designed injection scheme has been performed. Tuning of these injection units is based on the top-up operation process for storage ring vacuum cleaning purpose. It is set for a fast beam accumulation in the storage ring where the stored beam variation range is selected for efficient operation consideration. The measurement results of booster beam current variation while tuning of injection septum and kicker are presented. A preliminary analysis concerning the observation of deteriorated phase space acceptance in the TPS booster is given in this report. This study also includes an effort to extend the present available operation bunch train for TPS booster. It shows that the increase of the booster beam current by bunch train tuning indicates an upper bound of about 400 ns.