Construction method for integrally jacking and slipping net frame
暂无分享,去创建一个
The invention discloses a construction method for integrally jacking and slipping a net frame, which comprises the following steps: firstly, net frame integral jacking: after the net frame is spliced on the ground, a plurality of jacking devices are uniformly placed in the net frame, each jacking device includes a jacking rack progressively heightened and a jacking-up hydraulic jack, and the jacking-up hydraulic jacks push the net frame to a predetermined height through the jacking racks progressively heightened; secondly, net frame integral slipping: the jacking-up hydraulic jacks are horizontally pushed by a screw jack to enable the net frame to slip to an assigned position; and thirdly, net frame mounting completion: the jacking-up hydraulic jacks fall, and the net frame falls to a structural chapiter, and then all the jacking devices and the slipping devices are dismantled. The method has the advantages that the construction speed is high, the quality control is excellent, measure investment is little, the jacking and slipping are performed continuously, the construction period is shortened, the cost is reduced, and the method is particularly suitable for large-area net frames.