Underground production scheduling optimization with ventilation constraints

Underground production scheduling has traditionally been a time-consuming, manual task in which the goal is to achieve corporateor operation-defined production targets. This dissertation presents a generalized, mathematical formulation that results in a largescale integer optimization model. The model maximizes discounted gold ounces mined and determines the optimal or near-optimal sequence of activities related to the development, extraction and backfilling of an underground mine. Constraints include physical precedence and resource capacities. The research uses data from an existing underground mine; however, the model formulation has the ability to serve other underground mines with similarly structured data and provides the ability to customize constraints. Additionally, the model includes a constraint that treats available mine ventilation as a consumable resource. Diesel particulate matter, DPM, is a primary contaminant found in underground mining. Ventilation is used to dilute DPM below regulatory levels; however, mine ventilation is a limited resource, meaning that airflow through a mine cannot easily be increased once a ventilation system has been implemented. Large integer optimization models are traditionally solved using the branch-and-bound algorithm; however, results show the benefit of using a solver called OMP, originally designed for open pit mining applications, which integrates a specialized linear programming algorithm and a heuristic to induce intergrality. The author evaluates two solution methods, the CPLEX optimization package and the OMP Solver, and compares solution time. The OMP Solver schedules are compared to manual production schedules, with and without ventilation constraints. These comparisons show that with the OMP solver, it is possible to produce higher quality, implementable schedules in much less time relative to the manually generated schedules. Furthermore, the OMP solver outperforms CPLEX at this task.

[1]  Y. J. Wang Solving mine ventilation networks with fixed and non-fixed branches , 1990 .

[2]  W. A. Hustrulid,et al.  Underground mining methods : engineering fundamentals and international case studies , 2001 .

[3]  Eduardo Moreno,et al.  Large-scale multi-period precedence constrained knapsack problem: A mining application , 2010, Electron. Notes Discret. Math..

[4]  Daniel Bienstock,et al.  Solving LP Relaxations of Large-Scale Precedence Constrained Problems , 2010, IPCO.

[5]  David S. Johnson,et al.  The Planar Hamiltonian Circuit Problem is NP-Complete , 1976, SIAM J. Comput..

[6]  Subhash C. Sarin,et al.  The long-term mine production scheduling problem , 2005 .

[7]  C. Sensogut,et al.  A Combined Method for The Analysis of Mine Ventilation Networks , 2000 .

[8]  Andrés Weintraub,et al.  A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models , 2008, Electron. Notes Discret. Math..

[9]  C. Pritchard Methods to improve efficiency of mine ventilation systems , 2008 .

[10]  Christian Artigues,et al.  Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications , 2007 .

[11]  Sönke Hartmann,et al.  A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..

[12]  Daniel Bienstock,et al.  A New LP Algorithm for Precedence Constrained Production Scheduling , 2009 .

[13]  Alexandra M. Newman,et al.  MineLib: a library of open pit mining problems , 2013, Ann. Oper. Res..

[14]  Erkan Topal,et al.  Implementing a Production Schedule at LKAB's Kiruna Mine , 2004, Interfaces.

[15]  Panos M. Pardalos,et al.  Introduction to Global Optimization , 2000, Introduction to Global Optimization.

[16]  T. H. Ueng,et al.  Analysis of mine ventilation networks using nonlinear programming techniques , 1984 .

[17]  Thys B Johnson,et al.  OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .

[18]  G. Nemhauser,et al.  Integer Programming , 2020 .

[19]  Alexandra M. Newman,et al.  A Review of Operations Research in Mine Planning , 2010, Interfaces.

[20]  R. Kipp Martin,et al.  Large scale linear and integer optimization - a unified approach , 1998 .

[21]  Dimitri Golenko-Ginzburg,et al.  Resource Constrained Project Scheduling Models under Random Disturbances , 2006 .

[22]  Gonzalo Ignacio,et al.  Modelos de optimización lineal entera y aplicaciones a la minería , 2012 .

[23]  Alexandra M. Newman,et al.  Open-Pit Block-Sequencing Formulations: A Tutorial , 2014, Interfaces.

[24]  Eduardo Moreno,et al.  A New Algorithm for the Open-Pit Mine Production Scheduling Problem , 2012, Oper. Res..

[25]  Howard L. Hartman,et al.  Mine ventilation and air conditioning , 1961 .

[26]  R. V. Ramani,et al.  Generalized multiperiod MIP model for production scheduling and processing facilities selection and location , 1986 .

[27]  Alexandra M. Newman,et al.  Is openpit production scheduling “easier” than its underground counterpart? , 2015 .

[28]  LINEAR PROGRAMMING APPROACH TO MINE SCHEDULING OPTIMIZATION. , 1982 .

[29]  Erkan Topal,et al.  Production scheduling at LKAB's Kiruna Mine using mixed-integer programming , 2003 .

[30]  W. Matthew Carlyle,et al.  Underground Planning at Stillwater Mining Company , 2001 .

[31]  Jacques F. Benders,et al.  Partitioning procedures for solving mixed-variables programming problems , 2005, Comput. Manag. Sci..

[32]  Alexandra M. Newman,et al.  Using aggregation to optimize long-term production planning at an underground mine , 2007, Eur. J. Oper. Res..

[33]  Ronald L. Rardin,et al.  Optimization in operations research , 1997 .

[34]  Howard L. Hartman,et al.  Introductory Mining Engineering , 1987 .

[35]  A. Belegundu,et al.  Optimization Concepts and Applications in Engineering , 2011 .

[36]  L. M. Giannini Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.

[37]  J. Higginson,et al.  International Agency for Research on Cancer. , 1968, WHO chronicle.

[38]  Jan Karel Lenstra,et al.  Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..

[39]  Kwame Awuah-Offei,et al.  Large-scale open pit production scheduling using Mixed Integer Linear Programming , 2010 .

[40]  Erkan Topal,et al.  Production schedule optimisation in underground hard rock mining using mixed integer programming , 2007 .

[41]  Alexandra M. Newman,et al.  Extraction and Backfill Scheduling in a Complex Underground Mine , 2014, Interfaces.

[42]  Enrique Acuña,et al.  A Review of Primary Mine Ventilation System Optimization , 2014, Interfaces.

[43]  Alexandra M. Newman,et al.  Long- and Short-Term Production Scheduling at Lkab's Kiruna Mine , 2007 .

[44]  Francisco Ballestín,et al.  When it is worthwhile to work with the stochastic RCPSP? , 2007, J. Sched..

[45]  M. Smith,et al.  Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa Mines , 2003 .

[46]  Erkan Topal,et al.  A new mathematical programming model for production schedule optimization in underground mining operations , 2010 .

[47]  S. Griffis EDITOR , 1997, Journal of Navigation.

[48]  Controlling And Monitoring Diesel Emissions In Underground Mines In The United States , 2010 .

[49]  Richard E. Gertsch,et al.  Techniques in underground mining : selections from Underground mining methods handbook , 1998 .