Underground production scheduling optimization with ventilation constraints
暂无分享,去创建一个
[1] Y. J. Wang. Solving mine ventilation networks with fixed and non-fixed branches , 1990 .
[2] W. A. Hustrulid,et al. Underground mining methods : engineering fundamentals and international case studies , 2001 .
[3] Eduardo Moreno,et al. Large-scale multi-period precedence constrained knapsack problem: A mining application , 2010, Electron. Notes Discret. Math..
[4] Daniel Bienstock,et al. Solving LP Relaxations of Large-Scale Precedence Constrained Problems , 2010, IPCO.
[5] David S. Johnson,et al. The Planar Hamiltonian Circuit Problem is NP-Complete , 1976, SIAM J. Comput..
[6] Subhash C. Sarin,et al. The long-term mine production scheduling problem , 2005 .
[7] C. Sensogut,et al. A Combined Method for The Analysis of Mine Ventilation Networks , 2000 .
[8] Andrés Weintraub,et al. A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models , 2008, Electron. Notes Discret. Math..
[9] C. Pritchard. Methods to improve efficiency of mine ventilation systems , 2008 .
[10] Christian Artigues,et al. Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications , 2007 .
[11] Sönke Hartmann,et al. A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[12] Daniel Bienstock,et al. A New LP Algorithm for Precedence Constrained Production Scheduling , 2009 .
[13] Alexandra M. Newman,et al. MineLib: a library of open pit mining problems , 2013, Ann. Oper. Res..
[14] Erkan Topal,et al. Implementing a Production Schedule at LKAB's Kiruna Mine , 2004, Interfaces.
[15] Panos M. Pardalos,et al. Introduction to Global Optimization , 2000, Introduction to Global Optimization.
[16] T. H. Ueng,et al. Analysis of mine ventilation networks using nonlinear programming techniques , 1984 .
[17] Thys B Johnson,et al. OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .
[18] G. Nemhauser,et al. Integer Programming , 2020 .
[19] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[20] R. Kipp Martin,et al. Large scale linear and integer optimization - a unified approach , 1998 .
[21] Dimitri Golenko-Ginzburg,et al. Resource Constrained Project Scheduling Models under Random Disturbances , 2006 .
[22] Gonzalo Ignacio,et al. Modelos de optimización lineal entera y aplicaciones a la minería , 2012 .
[23] Alexandra M. Newman,et al. Open-Pit Block-Sequencing Formulations: A Tutorial , 2014, Interfaces.
[24] Eduardo Moreno,et al. A New Algorithm for the Open-Pit Mine Production Scheduling Problem , 2012, Oper. Res..
[25] Howard L. Hartman,et al. Mine ventilation and air conditioning , 1961 .
[26] R. V. Ramani,et al. Generalized multiperiod MIP model for production scheduling and processing facilities selection and location , 1986 .
[27] Alexandra M. Newman,et al. Is openpit production scheduling “easier” than its underground counterpart? , 2015 .
[28] LINEAR PROGRAMMING APPROACH TO MINE SCHEDULING OPTIMIZATION. , 1982 .
[29] Erkan Topal,et al. Production scheduling at LKAB's Kiruna Mine using mixed-integer programming , 2003 .
[30] W. Matthew Carlyle,et al. Underground Planning at Stillwater Mining Company , 2001 .
[31] Jacques F. Benders,et al. Partitioning procedures for solving mixed-variables programming problems , 2005, Comput. Manag. Sci..
[32] Alexandra M. Newman,et al. Using aggregation to optimize long-term production planning at an underground mine , 2007, Eur. J. Oper. Res..
[33] Ronald L. Rardin,et al. Optimization in operations research , 1997 .
[34] Howard L. Hartman,et al. Introductory Mining Engineering , 1987 .
[35] A. Belegundu,et al. Optimization Concepts and Applications in Engineering , 2011 .
[36] L. M. Giannini. Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.
[37] J. Higginson,et al. International Agency for Research on Cancer. , 1968, WHO chronicle.
[38] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[39] Kwame Awuah-Offei,et al. Large-scale open pit production scheduling using Mixed Integer Linear Programming , 2010 .
[40] Erkan Topal,et al. Production schedule optimisation in underground hard rock mining using mixed integer programming , 2007 .
[41] Alexandra M. Newman,et al. Extraction and Backfill Scheduling in a Complex Underground Mine , 2014, Interfaces.
[42] Enrique Acuña,et al. A Review of Primary Mine Ventilation System Optimization , 2014, Interfaces.
[43] Alexandra M. Newman,et al. Long- and Short-Term Production Scheduling at Lkab's Kiruna Mine , 2007 .
[44] Francisco Ballestín,et al. When it is worthwhile to work with the stochastic RCPSP? , 2007, J. Sched..
[45] M. Smith,et al. Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa Mines , 2003 .
[46] Erkan Topal,et al. A new mathematical programming model for production schedule optimization in underground mining operations , 2010 .
[47] S. Griffis. EDITOR , 1997, Journal of Navigation.
[48] Controlling And Monitoring Diesel Emissions In Underground Mines In The United States , 2010 .
[49] Richard E. Gertsch,et al. Techniques in underground mining : selections from Underground mining methods handbook , 1998 .