Generation Expansion Planning for Systems with a High Share of Hydro Power
暂无分享,去创建一个
D. Sjelvgren | J. A. Bubenko | P. Nordlund | M. V. F. Pereira | M. Pereira | J. Bubenko | D. Sjelvgren | P. Nordlund
[1] Jeremy Bloom,et al. Long Range Generation Planning With Limited Energy and Storage Plants Part I: Production Costing , 1983, IEEE Transactions on Power Apparatus and Systems.
[2] K. Morita,et al. Layered Network Model Approach to Optimal Daily Hydro Scheduling , 1982, IEEE Transactions on Power Apparatus and Systems.
[3] Mario V. F. Pereira,et al. OPERATION PLANNING OF LARGE-SCALE HYDROELECTRICAL SYSTEMS , 1984 .
[4] Jeremy A. Bloom,et al. Solving an Electricity Generating Capacity Expansion Planning Problem by Generalized Benders' Decomposition , 1983, Oper. Res..
[5] L. M. V. G. Pinto,et al. A Decomposition Approach to the Economic Dispatch of Hydrothermal Systems , 1982, IEEE Power Engineering Review.
[6] M. Pereira,et al. Stochastic Optimization of a Multireservoir Hydroelectric System: A Decomposition Approach , 1985 .
[7] Tharam S. Dillon,et al. Optimal Operations Planning in a Large Hydro-Thermal Power System , 1983 .
[8] T. Dillon,et al. Optimal Operations Planning in a Large Hydro-Thermal Power System , 1983, IEEE Transactions on Power Apparatus and Systems.
[9] Richard E. Rosenthal,et al. A Nonlinear Network Flow Algorithm for Maximization of Benefits in a Hydroelectric Power System , 1981, Oper. Res..
[10] M. F. Pereira,et al. A Decomposition Approach to the Economic Dispatch of Hydrothermal Systems , 1982, IEEE Transactions on Power Apparatus and Systems.