A Probabilistic Search Method for Optimal Resource Deployment in a Microgrid

The benefits of distributed energy resources (DERs) can be exploited by developing cost efficient deployment strategies. System planning based on stipulated reliability criteria leads to robust architectures which can meet the consumers' requirements. This paper presents a method for determining siting, sizing and optimal mix of resources from the available types of DER in a microgrid. The method recognizes the impact of combined heat and power (CHP) to meet the thermal load. The paper presents a dynamic programming formulation and demonstrates its application on a six bus test system

[1]  Roy Billinton,et al.  Transmission Planning Using a Reliability Criterion, Part I: A Reliability Criterion , 1970 .

[2]  Chanan Singh,et al.  Generating Capacity Reliability Evaluation in Interconnected Systems using a Frequency and Duration Approach Part I. Mathematical Analysis , 1971 .

[3]  Tao Wang Global Optimization for Constrained Nonlinear Programming , 2000 .

[4]  Jiuping Pan,et al.  Siting distributed generation to defer T&D expansion , 2001, 2001 IEEE/PES Transmission and Distribution Conference and Exposition. Developing New Perspectives (Cat. No.01CH37294).

[5]  Chanan Singh,et al.  Composite system reliability evaluation using state space pruning , 1997 .

[6]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[7]  A. R. Wallace,et al.  Planning for Optimal Accommodation of Dispersed Generation in Distribution Networks , 2003 .

[8]  N. S. Rau,et al.  Optimum location of resources in distributed planning , 1994 .

[9]  J. Mitra,et al.  Distributed Generation Placement for Optimal Microgrid Architecture , 2006, 2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition.

[10]  J. F. Verstege,et al.  Optimal operation of industrial CHP-based power systems in liberalized energy markets , 1999, PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376).

[11]  Fei Zeng,et al.  Adequacy and responsibility of locational generation and transmission-optimization procedures , 2004, IEEE Transactions on Power Systems.

[12]  Chanan Singh,et al.  A new approach to reliability evaluation of interconnected power systems including planned outages and frequency calculations , 1992 .

[13]  Chris Marnay,et al.  Integration of distributed energy resources. The CERTS Microgrid Concept , 2002 .

[14]  J. Mitra,et al.  Microgrid architecture: a reliability constrained approach , 2005, IEEE Power Engineering Society General Meeting, 2005.

[15]  G.E. Haringa,et al.  Application of Monte Carlo simulation to multi-area reliability evaluations , 1991, IEEE Computer Applications in Power.

[16]  Jin-O Kim,et al.  Optimal Capacity and Allocation of Distributed Generation by Minimum Operation Cost in Distribution Systems , 2005 .

[17]  W. El-khattam,et al.  Optimal investment planning for distributed generation in a competitive electricity market , 2004, IEEE Transactions on Power Systems.

[18]  A. Meliopoulos,et al.  Power System Reliability Evaluation Using Stochastic Load Flows , 1984, IEEE Transactions on Power Apparatus and Systems.