Effect of a lead time-dependent cost on lead time quotation, pricing, and capacity decisions in a stochastic make-to-order system with endogenous demand

Abstract The research on lead time quotation in make-to-order stochastic systems with an endogenous demand generally considers a system modelled as an M/M/1 queue with a linear demand that is sensitive to lead time and price, and always assume a constant unit operating cost. It is known that firms can reduce the operating cost by quoting a longer lead time. The idea of this paper stems from this observation. Indeed, we extend the existing works by modelling the unit operating cost, not as a constant, but as a convex decreasing function of the quoted lead time, which significantly rises the analytical difficulty but offers opportunities for many insights. We study three settings: (i) lead time quotation model, (ii) lead time quotation and pricing model, and (iii) lead time quotation, pricing, and capacity decision model. For each setting, we provide the optimal policy and conduct experiments to derive insights. In particular, we analyze the new trade-offs raised by the consideration of a lead time-sensitive cost. Some of our results are not intuitive.

[1]  Kum Khiong Yang,et al.  Ordering, Pricing, and Lead-Time Quotation under Lead-Time and Demand Uncertainty , 2012 .

[2]  Joseph D. Blackburn,et al.  Time-based competition : the next battleground in American manufacturing , 1991 .

[3]  Shibaji Panda,et al.  Coordinating a manufacturer–retailer chain under time and price dependent demand rate , 2013 .

[4]  Jing-Sheng Song,et al.  Price, delivery time guarantees and capacity selection , 1998, Eur. J. Oper. Res..

[5]  Yannick Frein,et al.  A Capacitated Multi‐echelon Inventory Placement Model under Lead Time Constraints , 2014 .

[6]  Costis Maglaras,et al.  Dynamic Pricing and Lead-Time Quotation for a Multiclass Make-to-Order Queue , 2008, Manag. Sci..

[7]  Elizabeth M. Jewkes,et al.  Customer Lead Time Management When Both Demand and Price are Lead Time Sensitive , 2004, Eur. J. Oper. Res..

[8]  Steven J. Erlebacher,et al.  Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand , 1998 .

[9]  Yannick Frein,et al.  An optimisation model for the design of global multi-echelon supply chains under lead time constraints , 2013 .

[10]  Seçil Savasaneril,et al.  Dynamic lead time quotation under responsive inventory and multiple customer classes , 2017, OR Spectr..

[11]  Sin-Hoon Hum,et al.  Time‐based competition: literature review and implications for modelling , 1996 .

[12]  Paul M. Griffin,et al.  Centralized vs. Decentralized Competition for Price and Lead-Time Sensitive Demand , 2016, Decis. Sci..

[13]  Tamer Boyaci,et al.  Product Differentiation and Capacity Cost Interaction in Time and Price Sensitive Markets , 2003, Manuf. Serv. Oper. Manag..

[14]  P. Griffin,et al.  Coordination of marketing and production for price and leadtime decisions , 2006 .

[15]  S. A. Slotnick Lead-time quotation when customers are sensitive to reputation , 2014 .

[16]  Yannick Frein,et al.  Supply chain design to guarantee quoted lead time and inventory replenishment: model and insights , 2017, Int. J. Prod. Res..

[17]  Paul M. Griffin,et al.  Dynamic Lead-Time Quotation for an M/M/1 Base-Stock Inventory Queue , 2010, Oper. Res..

[18]  Liming Liu,et al.  Pricing and Lead Time Decisions in Decentralized Supply Chains , 2007, Manag. Sci..

[19]  Tamer Boyaci,et al.  The Impact of Capacity Costs on Product Differentiation in Delivery Time, Delivery Reliability, and Price , 2006 .

[20]  L. Qian Market-based supplier selection with price, delivery time, and service level dependent demand , 2014 .

[21]  A. Prasad,et al.  Lead Time and Price Quotation Mode Selection: Uniform or Differentiated? , 2012 .

[22]  Yannick Frein,et al.  An international supplier selection model with inventory and transportation management decisions , 2012 .

[23]  Rajan Suri,et al.  Quick Response Manufacturing , 1998 .

[24]  Awi Federgruen,et al.  Competition in Service Industries , 2005, Oper. Res..

[25]  Stuart X. Zhu,et al.  Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain , 2015 .

[26]  Xiangtong Qi,et al.  A two-stage supply chain with demand sensitive to price, delivery time, and reliability of delivery , 2016, Ann. Oper. Res..

[27]  Achyutha Krishnamoorthy,et al.  A survey on inventory models with positive service time , 2011 .

[28]  R. Hammami,et al.  Carbon emissions in a multi-echelon production-inventory model with lead time constraints , 2015 .

[29]  A. Taleizadeh,et al.  Analyzing pricing, promised delivery lead time, supplier-selection, and ordering decisions of a multi-national supply chain under uncertain environment , 2017, International Journal of Production Economics.