Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology

The accumulation of material buffers is commonly perceived within the construction industry as an effective means of shielding a project from the risks associated with uncertainty in the supply network. Much of the uncertainty arises out of a lack of visibility throughout the construction supply network, in which visibility refers to the level of awareness of the overall state of the supply network. The integration of Automated Materials Locating and Tracking Technologies (AMLTT) within the construction supply network presents a viable solution to this problem. This article presents the results of an investigation that examined the potential for AMLTT to increase work opportunities at the site level as a result of increased supply-network visibility and in turn reduce the dependency on material buffers. The investigation was completed by using a modeling and simulation approach grounded on a solid foundation of field data and experience. The results presented here are increasingly important as leaders in other industry sectors are beginning to report tangible benefits as a result of increased supply-network visibility as a result of the integration of AMLTT within their organizations’ supply networks.

[1]  Burcu Akinci,et al.  Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS , 2007 .

[2]  Duncan Young,et al.  Modeling the Impact of Automated Materials Locating and Tracking Technology on the Construction Supply Network , 2009 .

[3]  Carlos H. Caldas,et al.  Locating sensor nodes on construction projects , 2007, Auton. Robots.

[4]  Damodara U. Kini Materials Management: The Key to Successful Project Management , 1999 .

[5]  Joseph H. M. Tah,et al.  Towards an agent-based construction supply network modelling and simulation platform , 2005 .

[6]  Julio C. Martínez,et al.  EZStrobe-general-purpose simulation system based on activity cycle diagrams , 1998, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).

[7]  Burcu Akinci,et al.  Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects , 2006 .

[8]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[9]  Ossama Salem,et al.  Lean Construction: From Theory to Implementation , 2006 .

[10]  Paul M. Goodrum,et al.  Field trial of automated material tracking in construction , 2008 .

[11]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[12]  David R. Riley,et al.  Fundamental principles of site material management , 2005 .

[13]  W. Blanchard GPS–Theory and Practice . B. Hofmann-Wellenhof H. Lichtenegger and J. Collins. 16·5 × 24 cm. Springer-Verlag, Vienna. 326 pp. DM 79. , 1993 .

[14]  Lansford C. Bell,et al.  Measuring Effectiveness of Materials Management Process , 1995 .

[15]  Hau L. Lee,et al.  Mitigating supply chain risk through improved confidence , 2004 .

[16]  Iris D. Tommelein,et al.  Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .

[17]  Paul M. Goodrum,et al.  The application of active radio frequency identification technology for tool tracking on construction job sites , 2006 .

[18]  Andrew R.J. Dainty,et al.  Construction supply chain integration: an elusive goal? , 2005 .

[19]  Carlos H. Caldas,et al.  Tracking the Location of Materials on Construction Job Sites , 2006 .

[20]  Carlos H. Caldas,et al.  Field experiments of an automated materials identification and localization model , 2007 .

[21]  Kerry London,et al.  THEORETICAL SUPPLY CHAIN NETWORK MODELLING IN THE BUILDING INDUSTRY , 1998 .

[22]  W. Hedgepeth RFID Metrics: Decision Making Tools for Today's Supply Chains , 2006 .

[23]  Edward J. Jaselskis,et al.  Implementing Radio Frequency Identification in the Construction Process , 2003 .

[24]  Edward A. Silver Materials management in large-scale construction projects: Some concerns and research issues , 1989 .

[25]  Charles T. Jahren,et al.  RADIO-FREQUENCY IDENTIFICATION APPLICATIONS IN CONSTRUCTION INDUSTRY , 1995 .

[26]  C. Harland Supply Chain Management: Relationships, Chains and Networks , 1996 .

[27]  Anthony D. Songer,et al.  Simulation of Construction Processes: Traditional Practices Versus Lean Principles , 1999 .

[28]  William J. O'Brien,et al.  Construction supply-chains: Case study, integrated cost and performance analysis , 1997 .

[29]  Harvey Lehpamer RFID Design Principles , 2008 .

[30]  D. Delen,et al.  RFID for Better Supply‐Chain Management through Enhanced Information Visibility , 2007 .

[31]  D. J. Allerton,et al.  Book Review: GPS theory and practice. Second Edition, HOFFMANNWELLENHOFF B., LICHTENEGGER H. and COLLINS J., 1993, 326 pp., Springer, £31.00 pb, ISBN 3-211-82477-4 , 1995 .