Design of the fast steering secondary mirror assembly for the Giant Magellan Telescope

The Fast-Steering Secondary Mirror (FSM) of Giant Magellan Telescope (GMT) consists of seven 1.1m diameter segments with effective diameter of 3.2m. Each segment is held by three axial supports and a central lateral support with a vacuum system for pressure compensation. Both on-axis and off-axis mirror segments are optimized under various design considerations. Each FSM segment contains a tip-tilt capability for guiding to attenuate telescope wind shake and mount control jitter. The design of the FSM mirror and support system configuration was optimized using finite element analyses and optical performance analyses. The design of the mirror cell assembly will be performed including sub-assembly parts consisting of axial supports, lateral support, breakaway mechanism, seismic restraints, and pressure seal. . In this paper, the mechanical results and optical performance results are addressed for the optimized FSM mirror and mirror cell assembly, the design considerations are addressed, and performance prediction results are discussed in detail with respect to the specifications

[1]  Young-Soo Kim,et al.  Flexure design development for a fast steering mirror , 2013, Optics & Photonics - Optical Engineering + Applications.

[2]  Seong-Do Kim,et al.  Development of the fast steering secondary mirror for the Giant Magellan Telescope , 2013, Optics & Photonics - Optical Engineering + Applications.

[3]  Jeong-Yeol Han,et al.  Development status of the fast-steering secondary mirror of GMT , 2018, Astronomical Telescopes + Instrumentation.

[4]  Sungho Lee,et al.  Detailed design of the G-CLEF flexure control camera subsystem , 2018, Astronomical Telescopes + Instrumentation.

[5]  Jeong-Yeol Han,et al.  Control modeling of the fast-steering secondary mirror for GMT , 2018, Astronomical Telescopes + Instrumentation.

[6]  Ho-Soon Yang,et al.  Development of the fast steering secondary mirror assembly of GMT , 2016, Astronomical Telescopes + Instrumentation.

[7]  Jeong-Yeol Han,et al.  Preliminary AIT plan for the FSM segments of GMT , 2018, Astronomical Telescopes + Instrumentation.

[8]  Young-Soo Kim,et al.  Optomechanical analysis and testing of a fast steering secondary mirror prototype for the Giant Magellan Telescope , 2013, Optics & Photonics - Optical Engineering + Applications.

[9]  Jeong-Yeol Han,et al.  Tip-tilt performance test of FSMP for development of the GMT FSM , 2018, Astronomical Telescopes + Instrumentation.