BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials

In order to achieve the information-based integrated construction management, e.g., time-dependent structures analysis, schedule/resource/cost conflict analysis as well as dynamic collision detection amongst site facilities and main structure elements, an integrated archetypal system named 4D-GCPSU 2009 is developed. Through 3 project examples, it is verified that the integrated solution is able to assist construction managers or owners in the aspects of analysis and management for process conflict and structural safety problems during construction. The application outcome of the system is accepted and praised by users as they considered that the system functions and analysis results provide significant reference support to the approval and revision of construction proposals, increase efficiency and safety concerning building construction. They also point out some difficulties in practice. As for those difficulties mentioned, a series of solutions plus further development orientation are put forth.

[1]  I. Puente,et al.  Shore–slab interaction in multistory reinforced concrete buildings during construction: An experimental approach , 2007 .

[2]  Sathyanarayanan Rajendran,et al.  Development and Initial Validation of Sustainable Construction Safety and Health Rating System , 2009 .

[3]  Danijel Rebolj,et al.  Integrating resource production and construction using BIM , 2010 .

[4]  Jian-Ping Zhang,et al.  Hybrid intelligence utilization for construction site layout , 2002 .

[5]  Ralph Johnson,et al.  design patterns elements of reusable object oriented software , 2019 .

[6]  Patrick X.W. Zou,et al.  Comparative Study on the Perception of Construction Safety Risks in China and Australia , 2009 .

[7]  Ming LuM. Lu,et al.  Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games , 2009 .

[8]  Zhen-Zhong Hu,et al.  BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies , 2011 .

[9]  Jochen Teizer,et al.  Human Factors Analysis Classification System Relating to Human Error Awareness Taxonomy in Construction Safety , 2009 .

[10]  Mark G. Stewart,et al.  Structural Reliability of Multistory Buildings during Construction , 2002 .

[11]  Janne Porkka,et al.  Software development approaches and challenges of 4D product models , 2007 .

[12]  Mahesh Pal,et al.  Generating, Evaluating, and Visualizing Construction Schedule with Geographic Information Systems , 2008 .

[13]  Andrew N. Baldwin,et al.  Integrating design and construction through virtual prototyping , 2008 .