Cost–volume–profit analysis under uncertainty: a model with fuzzy estimators based on confidence intervals

In this paper we express the uncertainty existing in cost–volume–profit analysis via a new method that constructs fuzzy estimators for the parameters of a given probability distribution function using statistical data. First we present a fuzzy function for the cost and we search for the optimal solution among alternatives as Finch and Gavirneni [2006, International Journal of Production Research, 44 (20), 4329–4342] do, but here we use fuzzy estimators for the variable costs. As a consequence, we formulate a fuzzy number that represents the difference between the costs of the alternatives. Furthermore, we consider conditions of ‘complete’ uncertainty when a company needs to choose between two products and we express the profits and the risk via fuzzy estimators. Finally, under the same conditions of uncertainty we express the breakeven point when the income equals the total cost.

[1]  R. Norland REFINEMENTS IN THE ISMAIL‐LOUDERBACK STOCHASTIC CVP MODEL* , 1980 .

[2]  James A. Yunker,et al.  Cost-volume-profit analysis under uncertainty: An integration of economic and accounting concepts , 1982 .

[3]  Ramarathnam Ravichandran,et al.  A decision support system for stochastic cost-volume-profit analysis , 1993, Decis. Support Syst..

[4]  M. Shubik Information, Risk, Ignorance and Indeterminacy , 1954 .

[5]  George J. Klir,et al.  Fuzzy sets and fuzzy logic - theory and applications , 1995 .

[6]  Stochastic CVP analysis as a gateway to decision-making under uncertainty , 2003 .

[7]  Multiproduct CVP analysis based on contribution rules , 2001 .

[8]  Y. Chan Incremental cost-volume-profit analysis , 1990 .

[9]  Y. Asiedu,et al.  Simulation-based cost estimation under economic uncertainty using kernel estimators , 2000 .

[10]  Hung T. Nguyen,et al.  A note on the extension principle for fuzzy sets , 1978 .

[11]  Konstantinos A. Chrysafis,et al.  On theoretical pricing of options with fuzzy estimators , 2009 .

[12]  Kee H. Chung COST‐VOLUME‐PROFIT ANALYSIS UNDER UNCERTAINTY WHEN THE FIRM HAS PRODUCTION FLEXIBILITY , 1993 .

[13]  Timothy L. Smunt,et al.  Log-linear and non-log-linear learning curve models for production research and cost estimation , 1999 .

[14]  J. Dickinson,et al.  COST-VOLUME-PROFIT ANALYSIS UNDER UNCERTAINTY , 1974 .

[15]  Byron J. Finch,et al.  The impact of learning rate and constraints on production line performance , 1995 .

[16]  Zone-Ching Lin,et al.  Cost-tolerance analysis model based on a neural networks method , 2002 .

[17]  Lee J. Krajewski,et al.  A decision model for corrective maintenance management , 1994 .

[18]  Jay S. Holmen,et al.  A cash flow cost-volume-profit model , 1990 .

[19]  B. Ismail,et al.  OPTIMIZING AND SATISFICING IN STOCHASTIC COST‐VOLUME‐PROFIT ANALYSIS , 1979 .

[20]  S. Gavirneni,et al.  Confidence intervals for optimal selection among alternatives with stochastic variable costs , 2006 .