Hybrid MILP/Simulation/Heuristic Algorithms to Complex Hoist Scheduling Problems
暂无分享,去创建一个
[1] Pedro M. Castro,et al. Hybrid time slots sequencing model for a class of scheduling problems , 2012 .
[2] Henry L. W. Nuttle,et al. Hoist Scheduling For A PCB Electroplating Facility , 1988 .
[3] Christopher D. Geiger,et al. A Tabu search approach to scheduling an automated wet etch station , 1997 .
[4] L. W. Phillips,et al. Mathematical Programming Solution of a Hoist Scheduling Program , 1976 .
[5] Christian Bierwirth,et al. A heuristic scheduling procedure for multi-item hoist production lines , 2007 .
[6] Iftekhar A. Karimi,et al. Heuristic algorithms for scheduling an automated wet-etch station , 2004, Comput. Chem. Eng..
[7] Carlos A. Méndez,et al. An improvement-based MILP optimization approach to complex AWS scheduling , 2012, Comput. Chem. Eng..
[8] Neil Yorke-Smith,et al. An Improved Hybrid Model for the Generic Hoist Scheduling Problem , 2002, Ann. Oper. Res..
[9] Yves Crama,et al. Combinatorial optimization models for production scheduling in automated manufacturing systems , 1997 .
[10] César de Prada,et al. MILP-based Approach for the Scheduling of Automated Manufacturing System with Sequence-Dependent transferring times , 2012 .
[11] Carlos A. Méndez,et al. An iterative MILP-based approach to automated multi-product multi-stage manufacturing systems , 2012 .
[12] Iftekhar A. Karimi,et al. An MILP Approach to Automated Wet-Etch Station Scheduling , 2003 .
[13] P. Castro,et al. Integrated Constraint Programming Scheduling Approach for Automated Wet-Etch Stations in Semiconductor Manufacturing , 2011 .