Annual rehabilitation costs estimation for a bridge network

The objective of this paper is to present an integrated multi-year rehabilitation planning model (IMRPM) for a bridge network. A multi-year capital program can provide an explicit, steady vision for financial and expenditure strategies as well as improve the efficiency of the allocation of limited resources. Estimating the precise annual rehabilitation needs for sound bridge management is essential to achieving the goals of a multi-year capital program; however, the current rehabilitation planning techniques tend to underestimate the annual rehabilitation costs by overlooking the potential rehabilitation needs which can arise by delaying of Maintenance/Repair (M/R) projects due to insufficient annual funding. The presented model integrates a multi-year rehabilitation capital program into an M/R program within the same multi-year period. The model engages a genetic algorithm for a project-level analysis process to identify M/R and rehabilitation projects over a defined multi-year analysis period (e.g., three, five, or ten years) for each M/R program and rehabilitation program. As a result of this process, the annual rehabilitation costs during a multi-year period initially can be estimated. Then, the initial annual rehabilitation costs can be finalized by including newly-identified rehabilitation needs, which are developed through the annual reanalysis process resulting from the delay of M/R projects in prior years. The annual reanalysis process considers the concept of time floats for M/R projects. The presented model is expected to be useful to efficiently control delayed M/R projects and to provide more reliable estimation for annual rehabilitation needs.

[1]  Christopher Mackey,et al.  Development of a prioritization methodology for maintaining Virginia's bridge infrastructure systems , 2009, 2009 Systems and Information Engineering Design Symposium.

[2]  Tarek Hegazy,et al.  Bridge Deck Management System with Integrated Life-Cycle Cost Optimization , 2004 .

[3]  R. McNab,et al.  Multi-Year Budgeting: A Review of International Practices and Lessons for Developing and Transitional Economies , 2000 .

[4]  J. K. Lenstra,et al.  Local Search in Combinatorial Optimisation. , 1997 .

[5]  D B Ham,et al.  NATIONAL NEEDS ASSESSMENT FOR ENSURING TRANSPORTATION INFRASTRUCTURE SECURITY , 2002 .

[6]  Feng Wang,et al.  Decision-Making Problem for Managing Pavement Maintenance and Rehabilitation Projects , 2003 .

[7]  Bo Gao,et al.  Multiyear Pavement-Rehabilitation Planning Enabled by Geographic Information System: Network Analyses Linked to Projects , 2004 .

[8]  Dan M. Frangopol,et al.  Condition, safety and cost profiles for deteriorating structures with emphasis on bridges , 2005, Reliab. Eng. Syst. Saf..

[9]  Samuel Labi,et al.  Long-term Benefits of Microsurfacing Applications in Indiana - Methodology and Case Study , 2006 .

[10]  Henry G. Russell CONCRETE BRIDGE DECK PERFORMANCE , 2004 .

[11]  Dan M. Frangopol,et al.  Optimizing Lifetime Condition and Reliability of Deteriorating Structures with Emphasis on Bridges , 2008 .

[12]  Yuanqing Wang,et al.  A Heuristic Approach for Selecting Highway Investment Alternatives , 2010, Comput. Aided Civ. Infrastructure Eng..

[13]  Ayaho Miyamoto,et al.  Fuzzy concrete bridge deck condition rating method for practical bridge management system , 2009, Expert Syst. Appl..

[14]  Magdalene Marinaki,et al.  A hybrid genetic - Particle Swarm Optimization Algorithm for the vehicle routing problem , 2010, Expert Syst. Appl..

[15]  Dan M. Frangopol,et al.  Maintenance Planning of Deteriorating Bridges by Using Multiobjective Optimization , 2005 .

[16]  Gregory Scott Williamson,et al.  SERVICE LIFE MODELING OF VIRGINIA BRIDGE DECKS , 2007 .

[17]  Ralph Haas,et al.  Integer Programming of Maintenance and Rehabilitation Treatments for Pavement Networks , 1998 .

[18]  Yoojung Yoon Planning of optimal rehabilitation strategies for infrastructure using time float and multiyear prioritization approach , 2012 .

[19]  Samuel Labi,et al.  Multi-Objective Optimization for Bridge Management Systems , 2007 .