Integrating design planning, schedule and control with Deplan
暂无分享,去创建一个
Iris D. Tommelein | Simon A. Austin | Glenn Ballard | Hyun Jeong Choo | Jamie W. Hammond | G. Ballard | S. Austin | H. Choo | J. Hammond
[1] Steven D. Eppinger,et al. Managing the integration problem in concurrent engineering , 1993 .
[2] Finland,et al. Fast or concurrent: The art of getting construction improved , 1997 .
[3] James L. Rogers. DeMAID: A Design Manager's Aide for Intelligent Decomposition user's guide , 1989 .
[4] Greg Howell,et al. Implementing Lean Construction: Stabilizing Work Flow , 1997 .
[5] Raymond E. Levitt,et al. Process Modeling for Design-Build Project Management , 1996 .
[6] Andrew N. Baldwin,et al. A Data Flow Model to Plan and Manage the Building Design Process , 1996 .
[7] Iris D. Tommelein,et al. WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .
[8] David Gurley,et al. Practical Knowledge Builds Projects: Case for Independent Construction Information Management , 1998 .
[9] Glenn Ballard,et al. LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION CONTROL , 1997 .
[10] James L. Rogers. DeMAID/GA USER'S GUIDE Design Manager's Aid for Intelligent Decomposition with a Genetic Algorithm , 1996 .
[11] Andrew N. Baldwin,et al. ANALYTICAL DESIGN PLANNING TECHNIQUE FOR PROGRAMMING BUILDING DESIGN. , 1999 .
[12] D. V. Steward. Systems Analysis and Management: Structure, Strategy and Design , 1981 .
[13] Gregory A. Howell,et al. SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .
[14] Finland,et al. Use of the design structure matrix in construction , 1997 .
[15] Andrew N. Baldwin,et al. Analytical design planning technique: a model of the detailed building design process , 1999 .
[16] Iris D. Tommelein,et al. Workplan: Database for Work Package Production Scheduling , 1998 .