Setup cost reduction in (Q, r) policy with lot size, setup time and lead-time interactions

It is often assumed in most deterministic and stochastic inventory models that lead-time is a given parameter and the optimal operating policy is determined on the basis of this unrealistic assumption. However, the manufacturing lead-time is made up of several components (moving time, waiting time, setup time, lot size, and rework time) most of which should be treated as controllable variables. In this paper the effect of setup cost reduction is addressed in a stochastic continuous review inventory system with lead-time depending on lot size and setup time. An efficient iterative procedure is developed to determine the near optimal lot size, reorder point and setup time. Furthermore, a sensitivity analysis is carried out to assess the cost savings that can be realised by investing in setup.

[1]  Jack C. Hayya,et al.  Dynamic lot sizing with setup reduction , 1993 .

[2]  Hamid Noori,et al.  Justifying new technology acquisition through its impact on the cost of running an inventory policy , 1988 .

[3]  P. Billington The classic economic production quantity model with setup cost as a function of capital expenditure , 1987 .

[4]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[5]  Evan L. Porteus Investing in Reduced Setups in the EOQ Model , 1985 .

[6]  M. Paknejad,et al.  Setup cost reduction in an inventory model with finite-range stochastic lead times , 1990 .

[7]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[8]  J. S. Kim,et al.  Lot size dependent lead times in a Q,R inventory system , 1995 .

[9]  Gavriel Salvendy,et al.  Handbook of industrial engineering , 2001 .

[10]  Bhaba R. Sarker,et al.  Manufacturing setup cost reduction under variable lead times and finite opportunities for investment , 1997 .

[11]  Mokhtar S. Bazaraa,et al.  Nonlinear Programming: Theory and Algorithms , 1993 .

[12]  I. Moon Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions , 1994 .

[13]  Uday S. Karmarkar,et al.  Lot Sizes, Lead Times and In-Process Inventories , 1987 .

[14]  R. Schonberger Japanese manufacturing techniques : nine hidden lessons simplicity , 1982 .

[15]  Evan L. Porteus Investing in new parameter values in the discounted EOQ model , 1986 .

[16]  G. Gallego,et al.  Strategic investment to reduce setup times in the economic lot scheduling problem , 1995 .

[17]  Ilkyeong Moon,et al.  The Effect of Externalizing Setups in the Economic Lot Scheduling Problem , 1992, Oper. Res..

[18]  M. Hariga A stochastic inventory model with lead time and lot size interaction , 1999 .

[19]  K. Al-Sultan,et al.  A tabu search Hooke and Jeeves algorithm for unconstrained optimization , 1997 .