Two-Stage Stochastic Planning for Control of Building Thermal Energy Storage Portfolios with Transactive Controls
暂无分享,去创建一个
[1] Robert G. Pratt,et al. Transactive Control of Commercial Buildings for Demand Response , 2017, IEEE Transactions on Power Systems.
[2] Mohammad Shahidehpour,et al. Two-Stage Optimal Scheduling of Electric Vehicle Charging Based on Transactive Control , 2019, IEEE Transactions on Smart Grid.
[3] Amanullah M. T. Oo,et al. A hierarchical transactive energy management system for microgrids , 2016, 2016 IEEE Power and Energy Society General Meeting (PESGM).
[4] Darrell D. Massie,et al. Optimization of a building's cooling plant for operating cost and energy use , 2002 .
[5] Gregor P. Henze,et al. Evaluating synergistic effect of optimally controlling commercial building thermal mass portfolios , 2015 .
[6] Vincent J. Cushing,et al. Optimizing commercial building participation in energy and ancillary service markets , 2014 .
[7] Gregor P. Henze,et al. Evaluation of optimal control for active and passive building thermal storage , 2004 .