Waste in Construction: a Systematic Literature Review on Empirical Studies
暂无分享,去创建一个
[1] Laura H. Ikuma,et al. Effects of Lean Construction on Sustainability of Modular Homebuilding , 2012 .
[2] Jian Zuo,et al. Prediction System for Change Management in Construction Project , 2010 .
[3] Peter E.D. Love,et al. Modelling the dynamics of design error induced rework in construction , 2000 .
[4] Michael A. Mullens,et al. Lean Homebuilding: Lessons Learned from a Precast Concrete Panelizer , 2011 .
[5] Gul Polat,et al. Waste in Turkish Construction: Need for Lean Construction Techniques , 2004 .
[6] W. B. Ledbetter,et al. Causes of Quality Deviations in Design and Construction , 1992 .
[7] W. B. Ledbetter. Quality Performance on Successful Project , 1994 .
[8] E. R. Skoyles,et al. Materials wastage – a misuse of resources , 1976 .
[9] Sepani Senaratne,et al. Engineering , Construction and Architectural Management Emerald Article : Role of knowledge in managing construction project change , 2012 .
[10] Nabil Kartam,et al. Impact of construction materials on project time and cost in Kuwait , 2004 .
[11] Adnan Enshassi,et al. Materials control and waste on building sites : Data in the study was obtained from 86 housing projects on several locations in the Gaza Strip , 1996 .
[12] Hjh Jos Brouwers,et al. Construction Waste: Quantification and Source Evaluation , 1996 .
[13] Mohan M. Kumaraswamy,et al. Industrial management approaches for improving material control in building services works , 2009 .
[14] Bon-Gang Hwang,et al. Measuring the Impact of Rework on Construction Cost Performance , 2009 .
[15] Lauri Koskela,et al. Waste and labor productivity in production planning case Finnish construction industry , 2010 .
[16] Lasse Saukkoriipi,et al. Measurement of waste and productivity in relation to lean thinking , 2007 .
[17] Y. Monden. Toyota Production System: Practical Approach to Production Management , 1983 .
[18] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[19] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[20] Moonseo Park,et al. Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path , 2012 .
[21] Peter E.D. Love,et al. BENCHMARKING, BENCHACTION, AND BENCHLEARNING: REWORK MITIGATION IN PROJECTS , 2003 .
[22] Russell Kenley,et al. Quantifying levels of wasted time in construction with meta-analysis , 2005 .
[23] G. Garas,et al. Materials Waste in the Egyptian Construction Industry , 2001 .
[24] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[25] Peter E.D. Love,et al. Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .
[26] Seokjin Choi,et al. Waste Elimination of Mucking Process of a Petroleum Storage Tunnel Through the Value Stream Analysis , 2008 .
[27] Peter E.D. Love,et al. Determinants of rework in building construction projects , 2004 .
[28] O. O. Faniran,et al. Minimizing waste on construction project sites , 1998 .
[29] Rafael Sacks,et al. LEAPCON: Simulation of Lean Construction of High-Rise Apartment Buildings , 2007 .
[30] Mohamed Al-Hussein,et al. Development of Lean Model for House Construction Using Value Stream Mapping , 2009 .
[31] Leonhard E. Bernold,et al. Source evaluation of solid waste in building construction , 1994 .
[32] David R. Riley,et al. Lean Processes for Sustainable Project Delivery , 2006 .
[33] Peter E.D. Love,et al. Determining the causal structure of rework influences in construction , 1999 .
[34] Taiichi Ohno,et al. The Toyota Production System , 1984 .
[35] Assem Al-Hajj,et al. Material Waste in the UAE Construction Industry: Main Causes and Minimization Practices , 2011 .
[36] Charles Egbu,et al. A LEAN STRATEGY TO PERFORMANCE MEASUREMENT – REDUCING WASTE BY MEASURING ‘ NEXT ’ CUSTOMER NEEDS , 2008 .
[37] Kasun Hewage,et al. Building Information Modeling–Based Analysis to Minimize Waste Rate of Structural Reinforcement , 2012 .
[38] Chi Sun Poon,et al. Management of construction waste in public housing projects in Hong Kong , 2004 .
[39] Xueqing Zhang,et al. Construction Process Reengineering by Integrating Lean Principles and Computer Simulation Techniques , 2008 .
[40] Lucio Soibelman,et al. Material Waste in Building Industry: Main Causes and Prevention , 2002 .
[41] Bo Terje Kalsaas. WORK-TIME WASTE IN CONSTRUCTION , 2010 .
[42] Peter E.D. Love,et al. Quantifying the causes and costs of rework in construction , 2000 .
[43] Gregory A. Howell. New Operating System for Project Management: Consequences and Opportunities , 2011 .
[44] Carlos T. Formoso,et al. Method for Waste Control in the Building Industry , 1999 .
[45] Mark Petticrew,et al. Systematic reviews from astronomy to zoology: myths and misconceptions , 2001, BMJ : British Medical Journal.
[46] Lauri Koskela. Making-Do — the Eighth Category of Waste , 2004 .