Current status of reconfigurable assembly systems

Reconfigurable Manufacturing System (RMS) is one of most promising paradigms that provide an effective solution to changes and uncertainties in a competitive manufacturing environment. A Reconfigurable Assembly System (RAS) is a key component of an RMS. In this paper, our survey on the development of RAS has been summarised. The objectives of this literature survey are to: • clarify the needs and drivers in developing reconfigurable assembly systems • identify both academic and practical issues critical to the development of reconfigurable assembly systems • understand the state of the art of R&D related to the studies on the critical issues

[1]  Ahmet S. Yigit,et al.  Optimal selection of module instances for modular products in reconfigurable manufacturing systems , 2003 .

[2]  H. Correa Agile Manufacturing as the 21 st Century Strategy for Improving Manufacturing Competitiveness , 2001 .

[3]  Sang C. Park A methodology for creating a virtual model for a flexible manufacturing system , 2005, Comput. Ind..

[4]  S. Jack Hu,et al.  Selecting manufacturing system configurations based on performance using AHP , 2002 .

[5]  Hubert K. Rampersad Integrated and assembly oriented product design , 1996 .

[6]  Chi Biu Wong,et al.  Virtual engineering : an integrated approach to agile manufacturing machinery design and control , 2003 .

[7]  Andrew A. West,et al.  Reconfigurable modular automation systems for automotive power-train manufacture , 2006 .

[8]  Reuven Katz,et al.  Integration of reconfigurable inspection with stream of variations methodology , 2005 .

[9]  R. Manzini *,et al.  Framework for designing a flexible cellular assembly system , 2004 .

[10]  Albert C.K. Choi,et al.  VDAS: a virtual design and assembly system in a virtual reality environment , 2002 .

[11]  Preston G. Smith,et al.  Developing products in half the time , 1995 .

[12]  Paul G. Ranky,et al.  Object oriented modelling and design of reconfigurable conveyors in flexible assembly systems , 1997 .

[13]  Tamio Arai,et al.  Automated Calibration of Robot Coordinates for Reconfigurable Assembly Systems , 2002 .

[14]  Constantinos Mavroidis,et al.  Rapid fabrication of a non‐assembly robotic hand with embedded components , 2004 .

[15]  Gun Ho Lee,et al.  Reconfigurability consideration design of components and manufacturing systems , 1997 .

[16]  J. K. L. Ho A proposed approach for reconfiguration of flexible assembly line systems by motion genes , 2005 .

[17]  A. H. Redford,et al.  Generic flexible assembly system design , 2002 .

[18]  Elijah Kannatey-Asibu,et al.  Mapping theory: a new approach to design of multi-sensor monitoring of reconfigurable machining systems (RMS) , 2001 .

[19]  T. N. Wong,et al.  Reactive multi-agent system for assembly cell control , 2005 .

[20]  Erik L.J. Bohez,et al.  Integration of JIT flexible manufacturing, assembly and disassembly system using Petri net approach , 2004 .

[21]  B. P. Bandyopadhyay,et al.  Development of a fixture-free machining center for machining block-like components , 1993 .

[22]  Suresh P. Sethi,et al.  Flexibility in manufacturing: A survey , 1990 .

[23]  A. A. Gusev,et al.  Flexible Assembly Systems for Magnetic Tape Recorders , 1986 .

[24]  Z. M. Bi,et al.  Modularity Technology in Manufacturing: Taxonomy and Issues , 2001 .

[25]  W. E. Bodine MAKING AGILE ASSEMBLY PROFITABLE , 1998 .

[26]  Ram L. Kumar,et al.  An options view of investments in expansion-flexible manufacturing systems , 1995 .

[27]  Svetan Ratchev,et al.  Equipment ontology for modular reconfigurable assembly systems , 2005 .

[28]  R. Dreyer All in the family. , 1990, RDH.

[29]  Gerd Hirzinger,et al.  Flexible robot-assembly using a multi-sensory approach , 2000, Proceedings 2000 ICRA. Millennium Conference. IEEE International Conference on Robotics and Automation. Symposia Proceedings (Cat. No.00CH37065).

[30]  A. Gunasekaran,et al.  Agile manufacturing: The drivers, concepts and attributes , 1999 .

[31]  Preston G. Smith,et al.  Developing products in half the time: new rules, new tools 10 [Book Review] , 1997, IEEE Engineering Management Review.

[32]  Andrzej Grzesiak,et al.  Rethink assembly design , 2005 .

[33]  Greg Ahrens,et al.  Trends in the robotic simulation industry , 2002 .

[34]  Mark Pagell,et al.  An analysis of the diffusion of flexible manufacturing systems , 1995 .

[35]  Svetan Ratchev,et al.  Towards Web‐enabled design of modular assembly systems , 2004 .

[36]  Antony R Mileham,et al.  Comparison between fixed- and walking-worker assembly lines , 2005 .

[37]  Hubert K. Rampersad State of the art in robotic assembly , 1995 .

[38]  Xinjun Sheng,et al.  Modelling strategies for reconfigurable assembly systems , 2003 .

[39]  Mauro Onori Assembly Net: precision assembly technologies for mini and micro products , 2001 .

[40]  Kosuke Ishii,et al.  Design for variety: developing standardized and modularized product platform architectures , 2002 .

[41]  Paul G. Ranky Digital, Internet‐enabled assembly line and factory modeling , 2004 .

[42]  Yasumichi Aiyama,et al.  Holonic robot system: a flexible assembly system with high reconfigurability , 2001, Proceedings 2001 ICRA. IEEE International Conference on Robotics and Automation (Cat. No.01CH37164).

[43]  Yasumichi Aiyama,et al.  A holonic architecture for easy reconfiguration of robotic assembly systems , 2003, IEEE Trans. Robotics Autom..

[44]  Henrique Luiz Corrêa,et al.  01 Agile manufacturing as 21 st Century strategy for improving manufacturing competitiveness , 2001 .

[45]  Z. M. Bi,et al.  Analysis and Synthesis of Reconfigurable Robotic Systems , 2004, Concurr. Eng. Res. Appl..

[46]  A. Galip Ulsoy,et al.  Reconfigurable manufacturing systems and their enabling technologies , 2000, Int. J. Manuf. Technol. Manag..

[47]  A O'Dowd Quick-change artists. , 2006, Minnesota medicine.

[48]  S. S. Pande,et al.  WebROBOT: Internet based robotic assembly planning system , 2004, Comput. Ind..

[49]  William Bourn Modular assembly: more a process than an engineering technique , 2001 .

[50]  D. Powell,et al.  A review of gripping and manipulation techniques for micro-assembly applications , 2005 .

[51]  De Xu,et al.  An Agent-Based Holonic Architecture for Reconfigurable Manufacturing Systems , 2005, ICNC.

[52]  Xuehong Du,et al.  Design by Customers for Mass Customization Products , 1998 .

[53]  Ada Yin Suen Fung From Mass Production to Mass Customization , 2009 .

[54]  Anna Kochan,et al.  GM creates flexible assembly line at its Ellesmere Port plant in the UK , 2003 .

[55]  K. S. Rao,et al.  Flexibility-enabled lead-time reduction in flexible systems , 2005 .

[56]  Li Tang,et al.  An AI-Based Computer-Aided Reconfiguration Planning Framework for Reconfigurable Manufacturing Systems , 2004 .

[57]  Juhani Heilala,et al.  Human touch to efficient modular assembly system , 1997 .

[58]  Mauro Onori,et al.  Standardised flexible automatic assembly – evaluating the Mark IV approach , 2000 .

[59]  T. Fukuda,et al.  Design and control of flexible transfer system , 2000, Proceedings of the 3rd World Congress on Intelligent Control and Automation (Cat. No.00EX393).

[60]  Gunnar Erixon Modular function deployment , 1998 .

[61]  Chengyin Yuan,et al.  An integrated rapid prototyping environment for reconfigurable manufacturing systems , 2003 .

[62]  Rinaldo C. Michelini,et al.  Computer-Integrated Assembly for Cost Effective Developments , 2001 .

[63]  Hubert K. Rampersad The DFA House , 1993 .

[64]  Yao Yingxue,et al.  Preliminary investigation of virtual assembly constructing , 2004 .

[65]  D F Walczyk,et al.  Fixtureless assembly of sheet metal parts for the aircraft industry , 2000 .

[66]  Han-Pang Huang,et al.  System Modeling and Real-Time Simulator for Highly Model-Mixed Assembly Systems , 1999 .

[67]  S. Jack Hu,et al.  Automated generation of assembly system-design solutions , 2005, IEEE Transactions on Automation Science and Engineering.

[68]  Lena Mårtensson,et al.  Cooperation of Man and Robot Assembly — an Evaluation of an Industrial Flexible Assembly System , 1997 .

[69]  Preston G. Smith,et al.  Developing Products in Half the Time: New Rules, New Tools, 2nd Edition (Создание новых продуктов за половину времени: новые правила, новые инструменты) , 1997 .

[70]  I-Ming Chen,et al.  Rapid response manufacturing through a rapidly recon"gurable robotic workcell , 2001 .

[71]  K. Feldmann,et al.  Highly flexible Assembly – Scope and Justification , 2001 .

[72]  Tadeusz Sawik,et al.  An LP-based approach for loading and routing in a flexible assembly line , 2000 .

[73]  J. Milberg,et al.  Flexible Assembly Systems — Opportunities and Challenge for Economic Production , 1990 .

[74]  Juhani Heilala,et al.  Modular reconfigurable flexible final assembly systems , 2001 .

[75]  Marco Santochi,et al.  A reconfigurable assembly cell for mechanical products , 1994 .

[76]  M. Reza Abdi,et al.  Grouping and selecting products: the design key of Reconfigurable Manufacturing Systems (RMSs) , 2004 .

[77]  Brian Rooks,et al.  Assembly in aerospace features at IEE seminar , 2005 .

[78]  Th. P. Van Baaren The Flexibility of Myth , 1972 .

[79]  Mauro Onori,et al.  A process-oriented product design based on an assembly module platform , 2002, Proceedings 2002 IEEE International Conference on Robotics and Automation (Cat. No.02CH37292).

[80]  Patrick McDonnell,et al.  An approach to regulating machine sharing in reconfigurable back-end semiconductor manufacturing , 2004, J. Intell. Manuf..

[81]  Hideo Fujimoto,et al.  Assembly Process Design for Managing Manufacturing Complexities Because of Product Varieties , 2003 .

[82]  Monica Bellgran,et al.  A method for the design of flexible assembly systems , 1995 .

[83]  Ashraf Labib,et al.  A design strategy for reconfigurable manufacturing systems (RMSs) using analytical hierarchical process (AHP): A case study , 2003 .

[84]  Ezey M. Dar-El,et al.  Team-oriented assembly system design: A new approach , 1997 .

[85]  Lihui Wang,et al.  Reconfigurable manufacturing systems: the state of the art , 2008 .

[86]  Tarnio Arai Future Assembly System in Automobile Industry - Human Friendly Line , 1993 .

[87]  Weijun Zhang,et al.  Dynamic scheduling in flexible assembly system based on timed Petri nets model , 2005 .