Assessment of synchronous interactive devices for BIM project coordination: Prospective ergonomics approach

Abstract In the last years, BIM has gained interest across the construction sector in Europe. 3D coordination, i.e. the task aiming at comparing several 3D models in order to reduce problems and conflicts, is often identified as a new mission. It is associated with the authoring, use and quality control in relation with the management of digital information models produced in so-called BIM projects. 3D coordination is an emergent business involving new practices, contractual standards and associated devices and software, thus requiring appropriate research approaches involving the understanding of Information Technology in human environments to address it. Based on a prospective ergonomics methodology, the authors analyse the synchronous co-located 3D coordination meeting and focus on three research questions: 1) What is the current 3D coordination task?, 2) How are the usual interaction and visualization devices supporting synchronous co-located 3D coordination meeting perceived by users?, and 3) How could a new 3D coordination meeting support system strengthen collaborative decision-making process in synchronous co-located context? A survey, followed by a controlled laboratory experiment, provides results on the conceptualization of the BIM coordination process as well as on the devices that will support the related synchronous co-located meetings. The findings highlight the usefulness of touch-based and multi-users displays for a better engagement of teams. However the study also documents the pain points associated with the use of such devices in collective settings.

[1]  Gregory D. Abowd,et al.  Towards a Better Understanding of Context and Context-Awareness , 1999, HUC.

[2]  Jean-Marc Robert,et al.  What Is Prospective Ergonomics? A Reflection and a Position on the Future of Ergonomics , 2009, HCI.

[3]  Mikkel Rønne Jakobsen,et al.  Negotiating for Space?: Collaborative Work Using a Wall Display with Mouse and Touch Input , 2016, CHI.

[4]  Carrie Sturts Dossick,et al.  Messy talk and clean technology: communication, problem-solving and collaboration using Building Information Modelling , 2011 .

[5]  Pieter Pauwels,et al.  A semantic rule checking environment for building performance checking , 2011 .

[6]  Regan L. Mandryk,et al.  Deconstructing the touch experience , 2013, ITS.

[7]  Baabak Ashuri,et al.  Exploring the approaches in the implementation of BIM-based MEP coordination in the USA , 2015, J. Inf. Technol. Constr..

[8]  Améziane Aoussat,et al.  Anticipating the use of future things: towards a framework for prospective use analysis in innovation design projects. , 2013, Applied ergonomics.

[9]  Pavan Meadati,et al.  Exploring the Impact of Various Interactive Displays on Student Learning in Construction Courses , 2013 .

[10]  Sheryl Staub-French,et al.  3D and 4D modeling for design and construction coordination: issues and lessons learned , 2007, J. Inf. Technol. Constr..

[11]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[12]  L van Berlo,et al.  Collaborative Engineering with IFC: common practice in the Netherlands , 2015 .

[13]  Burcu Akinci,et al.  Evaluation and Comparison of Different Virtual Reality Environments towards Supporting Tasks Done on a Virtual Construction Site , 2016 .

[14]  Charles M. Eastman,et al.  A framework for fully integrated building information models in a federated environment , 2016, Adv. Eng. Informatics.

[15]  Gilles Halin,et al.  Toward a Trust-Based Construction Management , 2010, Comput. Aided Civ. Infrastructure Eng..

[16]  Yacine Rezgui,et al.  Generations of knowledge management in the architecture, engineering and construction industry: An evolutionary perspective , 2010, Adv. Eng. Informatics.

[17]  Michael Hammer,et al.  Reengineering Work: Don’t Automate, Obliterate , 1990 .

[18]  Jonghoon Kim,et al.  Parallel vs. Sequential Cascading MEP Coordination Strategies: A Pharmaceutical Building Case Study , 2014 .

[19]  A. Dupuis,et al.  Validation de la version française de l'échelle de réflexivité en groupe de Carter et West, 1998 , 2006 .

[20]  Tovi Grossman,et al.  An exploratory study of input configuration and group process in a negotiation task using a large display , 2007, CHI.

[21]  Eduardo Toledo Santos,et al.  BUILDING DESIGN COORDINATION: COMPARING 2D AND 3D METHODS , 2008 .

[22]  Jennifer Whyte,et al.  Visualizing Knowledge in Project-Based Work , 2008 .

[23]  Dimitra Anastasiou,et al.  Gesture analysis in a case study with a tangible user interface for collaborative problem solving , 2014, Journal on Multimodal User Interfaces.

[24]  E Papadonikolaki,et al.  Facilitating the BIM coordinator and empowering the suppliers with automated data compliance checking , 2016 .

[25]  Michael A. West,et al.  Reflexivity, Effectiveness, and Mental Health in BBC-TV Production Teams , 1998 .

[26]  Fernanda Leite,et al.  Knowledge Discovery of Spatial Conflict Resolution Philosophies in BIM-Enabled MEP Design Coordination Using Data Mining Techniques: A Proof-of-Concept , 2013 .

[27]  Philip T. Kortum,et al.  Determining what individual SUS scores mean: adding an adjective rating scale , 2009 .

[28]  Mikkel Rønne Jakobsen,et al.  Up close and personal: Collaborative work on a high-resolution multitouch wall display , 2014, TCHI.

[29]  Judith S. Olson,et al.  Analysis of gestures in face-to-face design teams provides guidance for how to use groupware in design , 1995, Symposium on Designing Interactive Systems.

[30]  Burcin Becerik-Gerber,et al.  Immersive virtual environments versus physical built environments: A benchmarking study for building design and user-built environment explorations , 2015 .

[31]  Yacine Rezgui,et al.  Clouds4Coordination: Managing Project Collaboration in Federated Clouds , 2015, 2015 IEEE/ACM 8th International Conference on Utility and Cloud Computing (UCC).

[32]  Jason Underwood,et al.  Delivering BIM to the UK Market , 2009 .

[33]  Martin Fischer,et al.  Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project , 2008, J. Inf. Technol. Constr..

[34]  Kalle Lyytinen,et al.  Wakes of Innovation in Project Networks: The Case of Digital 3-D Representations in Architecture, Engineering, and Construction , 2007, Organ. Sci..

[35]  Eric Brangier,et al.  Prospective ergonomics: origin, goal, and prospects. , 2012, Work.

[36]  Gilles Halin,et al.  Designing adapted visualization for collaborative 4D applications , 2013 .

[37]  Fernanda Leite,et al.  Comparison of Experienced and Novice BIM Coordinators in Performing Mechanical, Electrical and Plumbing (MEP) Coordination Tasks , 2014 .

[38]  Angelo Luigi Camillo Ciribini,et al.  Implementation of an interoperable process to optimise design and construction phases of a residential building: A BIM Pilot Project , 2016 .

[39]  Pedro Lopes,et al.  Combining bimanual manipulation and pen-based input for 3D modelling , 2011, SBIM '11.

[40]  Martin Fischer,et al.  Designing and Evaluating Visualization Techniques for Construction Planning , 2000 .

[41]  Jennifer Whyte,et al.  Managing digital coordination of design: emerging hybrid practices in an institutionalized project setting , 2011 .

[42]  Gilles Halin,et al.  Assistance to building construction coordination - towards a multi-view cooperative platform , 2006, J. Inf. Technol. Constr..

[43]  Mathijs Natrop,et al.  Collaborative engineering with IFC and BCF: managing openings and recesses , 2017 .

[44]  Baabak Ashuri,et al.  A Critical Review of Methods Used to Determine Productivity of Mechanical, Electrical, and Plumbing Systems Coordination , 2014 .

[45]  John E. Taylor,et al.  Exploring BIMs as avatars: using 3D virtual worlds to improve collaboration with models , 2014 .

[46]  Sheryl Staub-French,et al.  Physical and Digital Artifact-Mediated Coordination in Building Design , 2008, Computer Supported Cooperative Work (CSCW).

[47]  Kihong Ku,et al.  Building interactive modeling for construction education in virtual worlds , 2011, J. Inf. Technol. Constr..

[48]  Jakob Beetz,et al.  Model checking on the semantic web: IFC validation using modularized and distributed constraints , 2015 .

[49]  Lonny Simonian,et al.  Using Building Information Modeling to Improve the Mechanical, Electrical, and Plumbing Coordination Process for Buildings , 2008 .

[50]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[51]  M R A Addor,et al.  BIM Design Coordination Room Infrastructure: Assessment of Communication Activities , 2014 .

[52]  Sheryl Staub-French,et al.  Requirements For A Mobile Interactive Workspace To Support Design Development And Coordination , 2006 .