Assembly System Configuration Design for Reconfigurability Under Uncertain Production Evolution

[1]  Hui Wang,et al.  Assembly Hierarchy Generation for Assembly System Design for a Product Family , 2016 .

[2]  Alexandre Dolgui,et al.  Optimization Approaches for Multi-level Assembly Systems Under Stochastic Lead Times , 2016 .

[3]  Arthur C. Sanderson,et al.  AND/OR graph representation of assembly plans , 1986, IEEE Trans. Robotics Autom..

[4]  Yoram Koren,et al.  Co-Evolution of Product Families and Assembly Systems , 2007 .

[5]  Hector J. Carlo,et al.  Integrating Reconfiguration Cost Into the Design of Multi-Period Scalable Reconfigurable Manufacturing Systems , 2007 .

[6]  Kristin L. Wood,et al.  A Quantitative Similarity Metric for Design-by-Analogy , 2002 .

[7]  Gisele L. Pappa,et al.  Tuning Genetic Programming parameters with factorial designs , 2010, IEEE Congress on Evolutionary Computation.

[8]  Jeonghan Ko,et al.  Manufacturing System Design Considering Stochastic Product Evolution and Task Recurrence , 2009 .

[9]  Andrew Y. C. Nee,et al.  A Cooperative Co-Evolutionary Algorithm for Large-Scale Process Planning With Energy Consideration , 2017 .

[10]  Yoram Koren,et al.  Product variety and manufacturing complexity in assembly systems and supply chains , 2008 .

[11]  Dan Gusfield,et al.  Algorithms on Strings, Trees, and Sequences - Computer Science and Computational Biology , 1997 .

[12]  Zahed Siddique,et al.  Product Platform and Product Family Design , 2006 .

[13]  Zhengqian Jiang Hierarchy generation for designing assembly system for product with complex liaison and sub-assembly branches , 2015 .

[14]  George Chryssolouris,et al.  Assembly system design and operations for product variety , 2011 .

[15]  Alaa Elwany,et al.  Uncertainty Propagation Analysis of Computational Models in Laser Powder Bed Fusion Additive Manufacturing Using Polynomial Chaos Expansions , 2018, Journal of Manufacturing Science and Engineering.

[16]  Tao Jiang,et al.  On the Approximation of Shortest Common Supersequences and Longest Common Subsequences , 1995, SIAM J. Comput..

[17]  Yoram Koren,et al.  Reconfigurable manufacturing systems: Principles, design, and future trends , 2017, Frontiers of Mechanical Engineering.

[18]  Marc H. Meyer,et al.  The Power of Product Platforms , 1997 .

[19]  Javier P. Gonzalez-Zugasti,et al.  Assessing value in platformed product family design , 2001 .

[20]  Derek Yip-Hoi,et al.  An approach to scalability and line balancing for reconfigurable manufacturing systems , 2001 .

[21]  W. Art Chaovalitwongse,et al.  Multi-objective optimal scheduling of reconfigurable assembly line for cloud manufacturing , 2017, Optim. Methods Softw..

[22]  Yoram Koren,et al.  Value creation through design for scalability of reconfigurable manufacturing systems , 2017, Int. J. Prod. Res..

[23]  Ming Liang,et al.  Simultaneous Modular Product Scheduling and Manufacturing Cell Reconfiguration Using a Genetic Algorithm , 2006 .

[24]  Yoram Koren,et al.  Design of reconfigurable manufacturing systems , 2010 .

[25]  Lihui Wang,et al.  Reconfigurable manufacturing systems: the state of the art , 2008 .

[26]  Yong Wang,et al.  Subassembly identification for assembly sequence planning , 2013 .

[27]  Sung-Yong Son,et al.  Design principles and methodologies for reconfigurable machining systems. , 2000 .

[28]  S. Jack Hu,et al.  Assembly System Reconfiguration Planning , 2013 .

[29]  Anne-Lise Huyet,et al.  Reconfigurable assembly system configuration design approaches for product change , 2013, Proceedings of 2013 International Conference on Industrial Engineering and Systems Management (IESM).

[30]  Thomas L. DeFazio,et al.  An integrated computer aid for generating and evaluating assembly sequences for mechanical products , 1991, IEEE Trans. Robotics Autom..

[31]  Yoram Koren,et al.  Convertibility Measures for Manufacturing Systems , 2003 .

[32]  Hoda A. ElMaraghy,et al.  A Co-Evolution Model for Prediction and Synthesis of New Products and Manufacturing Systems , 2012 .

[33]  Roger Jianxin Jiao,et al.  Product family design and platform-based product development: a state-of-the-art review , 2007, J. Intell. Manuf..

[34]  Jeonghan Ko,et al.  Manufacturing System Design Considering Generational Product Evolution and Task Recurrence , 2007 .

[35]  Lionel Amodeo,et al.  Metaheuristics for Production Systems , 2016 .

[36]  Henri J. Thevenot,et al.  Commonality Indices for Assessing Product Families , 2006 .

[37]  John R. Koza,et al.  Genetic programming as a means for programming computers by natural selection , 1994 .

[38]  Madhu Jain,et al.  A comprehensive approach to operation sequence similarity based part family formation in the reconfigurable manufacturing system , 2013 .

[39]  Gun Ho Lee,et al.  Reconfigurability consideration design of components and manufacturing systems , 1997 .

[40]  Hoda A. ElMaraghy,et al.  Assessment of manufacturing systems reconfiguration smoothness , 2006 .

[41]  F. Jovane,et al.  Reconfigurable Manufacturing Systems , 1999 .

[42]  Panos Y. Papalambros,et al.  Platform Selection Under Performance Loss Constraints in Optimal Design of Product Families , 2002, DAC 2002.

[43]  John W. Sutherland,et al.  Component-Oriented Reassembly in Remanufacturing Systems: Managing Uncertainty and Satisfying Customer Needs , 2019, Journal of manufacturing science and engineering.

[44]  Hoda A. ElMaraghy,et al.  Optimal configuration selection for Reconfigurable Manufacturing Systems , 2007 .

[45]  Bin Zhang,et al.  Robust Tool Wear Monitoring Using Systematic Feature Selection in Turning Processes With Consideration of Uncertainties , 2018, Journal of Manufacturing Science and Engineering.

[46]  A. E. Eiben,et al.  Introduction to Evolutionary Computing , 2003, Natural Computing Series.

[47]  Carin Rösiö,et al.  Reconfigurable production system design – theoretical and practical challenges , 2013 .

[48]  Yoram Koren,et al.  Scalability planning for reconfigurable manufacturing systems , 2012 .

[49]  Goran D. Putnik,et al.  Scalability in manufacturing systems design and operation: State-of-the-art and future developments roadmap , 2013 .