Robust disassembly line balancing with ambiguous task processing times

Disassembly line balancing problem (DLBP), which is to select disassembly process, open workstations and assign selected tasks to opened workstations, plays an important role in the recycling of End Of Life products. In real-world disassembly operations, task processing times are usually stochastic due to various factors. Most related works address the uncertain processing times by assuming that the probability distribution is known and the task processing times are independent of each other. In practice, however, it is difficult to get the complete distributional information and there is always underlying correlation between the uncertain processing times. This paper investigates the DLBP with partial uncertain knowledge, i.e. the mean and covariance matrix of task processing times. A new distributionally robust formulation with a joint chance constraint is proposed. To solve the problem, an approximated mixed integer second-order cone programming (MI-SOCP) model is proposed, and a two-stage parameter-adjusting heuristic is further developed. Numerical experiments are conducted, to evaluate the performance of the proposed method. We also draw some managerial insights and consider an extension problem.

[1]  Alexandre Dolgui,et al.  Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem , 2014 .

[2]  W. Y. Szeto,et al.  A Distributionally Robust Joint Chance Constrained Optimization Model for the Dynamic Network Design Problem under Demand Uncertainty , 2014, Networks and Spatial Economics.

[3]  Ruiwei Jiang,et al.  Data-driven chance constrained stochastic program , 2015, Mathematical Programming.

[4]  Joaquín Bautista,et al.  A robustness information and visualization model for time and space assembly line balancing under uncertain demand , 2013 .

[5]  Alexandre Dolgui,et al.  Second order conic approximation for disassembly line design with joint probabilistic constraints , 2015, Eur. J. Oper. Res..

[6]  Alexandre Dolgui,et al.  A sample average approximation method for disassembly line balancing problem under uncertainty , 2014, Comput. Oper. Res..

[7]  Joaquín Bautista,et al.  A multiobjective model and evolutionary algorithms for robust time and space assembly line balancing under uncertain demand , 2016 .

[8]  Levent Kandiller,et al.  Profit-oriented disassembly-line balancing , 2008 .

[9]  Qiang Feng,et al.  Distributionally robust chance-constrained minimum variance beamforming , 2016, 2016 IEEE International Conference on Acoustics, Speech and Signal Processing (ICASSP).

[10]  Dong-Ho Lee,et al.  Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal , 2011 .

[11]  Eren Özceylan,et al.  Disassembly line balancing problem: a review of the state of the art and future directions , 2019, Int. J. Prod. Res..

[12]  Alexandre Dolgui,et al.  A Stochastic Formulation of the Disassembly Line Balancing Problem , 2012, APMS.

[13]  Alexandre Dolgui,et al.  L-Shaped Algorithm for Stochastic Disassembly Line Balancing Problem , 2013, MIM.

[14]  MengChu Zhou,et al.  Disassembly Sequence Planning Considering Fuzzy Component Quality and Varying Operational Cost , 2018, IEEE Transactions on Automation Science and Engineering.

[15]  Weida Xu,et al.  Robust balancing of mixed model assembly line , 2009 .

[16]  Alfred J.D. Lambert,et al.  Linear programming in disassembly/clustering sequence generation , 1999 .

[17]  Zhiwu Li,et al.  Operation patterns analysis of automotive components remanufacturing industry development in China , 2017 .

[18]  Alexandre Dolgui,et al.  A taxonomy of line balancing problems and their solutionapproaches , 2013 .

[19]  Michael R. Wagner Stochastic 0-1 linear programming under limited distributional information , 2008, Oper. Res. Lett..

[20]  Alexandre Dolgui,et al.  Scenario based robust line balancing: Computational complexity , 2012, Discret. Appl. Math..

[21]  Tao Yao,et al.  Dynamic Traffic Assignment under Uncertainty: A Distributional Robust Chance-Constrained Approach , 2011 .

[22]  Manoj Kumar Tiwari,et al.  A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .

[23]  Alexandre Dolgui,et al.  Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty , 2018, Int. J. Prod. Res..

[24]  Alexander Shapiro,et al.  Sample Average Approximation Method for Chance Constrained Programming: Theory and Applications , 2009, J. Optimization Theory and Applications.

[25]  Alexandre Dolgui,et al.  Assembly line balancing under uncertainty: Robust optimization models and exact solution method , 2013, Comput. Ind. Eng..

[26]  Ruiwei Jiang,et al.  Distributionally Robust Chance-Constrained Bin Packing , 2016 .

[27]  Alexandre Dolgui,et al.  A bibliographic review of production line design and balancing under uncertainty , 2015 .

[28]  Yinyu Ye,et al.  Distributionally Robust Optimization Under Moment Uncertainty with Application to Data-Driven Problems , 2010, Oper. Res..

[29]  Alexandre Dolgui,et al.  Dealing with uncertainty in disassembly line design , 2014 .

[30]  Surendra M. Gupta,et al.  A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..

[31]  Eren Özceylan,et al.  An optimisation support for the design of hybrid production lines including assembly and disassembly tasks , 2018, Int. J. Prod. Res..

[32]  J. Frédéric Bonnans,et al.  Perturbation analysis of second-order cone programming problems , 2005, Math. Program..

[33]  Surendra M. Gupta,et al.  Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships , 2001, Eur. J. Oper. Res..

[34]  MengChu Zhou,et al.  Modeling and Planning for Dual-Objective Selective Disassembly Using and/or Graph and Discrete Artificial Bee Colony , 2019, IEEE Transactions on Industrial Informatics.

[35]  Alexandre Dolgui,et al.  An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times , 2015 .

[36]  Shabbir Ahmed,et al.  Distributionally robust simple integer recourse , 2018, Comput. Manag. Sci..

[37]  Daniel Kuhn,et al.  Distributionally robust joint chance constraints with second-order moment information , 2011, Mathematical Programming.

[38]  Alexander Shapiro,et al.  Convex Approximations of Chance Constrained Programs , 2006, SIAM J. Optim..

[39]  F. Tevhide Altekin,et al.  Remedial actions for disassembly lines with stochastic task times , 2016, Comput. Ind. Eng..

[40]  Ruiwei Jiang,et al.  Ambiguous Chance-Constrained Binary Programs under Mean-Covariance Information , 2016, SIAM J. Optim..

[41]  Siqian Shen,et al.  Solving 0–1 semidefinite programs for distributionally robust allocation of surgery blocks , 2018, Optim. Lett..

[42]  Ayyuce Aydemir-Karadag,et al.  Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..

[43]  Melvyn Sim,et al.  From CVaR to Uncertainty Set: Implications in Joint Chance-Constrained Optimization , 2010, Oper. Res..

[44]  Daniel Kuhn,et al.  A distributionally robust perspective on uncertainty quantification and chance constrained programming , 2015, Mathematical Programming.

[45]  Alexandre Dolgui,et al.  Collection-disassembly problem in reverse supply chain , 2017 .

[46]  Chaoyong Zhang,et al.  An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem , 2017, Int. J. Prod. Res..

[47]  Alexandre Dolgui,et al.  Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts , 2013, APMS.

[48]  Alysson M. Costa,et al.  Robust assembly line balancing with heterogeneous workers , 2015, Comput. Ind. Eng..

[49]  Mehmet Ali Ilgin,et al.  Disassembly line balancing using linear physical programming , 2017, Int. J. Prod. Res..

[50]  F. Tevhide Altekin,et al.  A comparison of piecewise linear programming formulations for stochastic disassembly line balancing , 2017, Int. J. Prod. Res..

[51]  Amin Saberi,et al.  INFORMS doi 10.1287/xxxx.0000.0000 c○0000 INFORMS Price of Correlations in Stochastic Optimization , 2022 .

[52]  Donald Goldfarb,et al.  Second-order cone programming , 2003, Math. Program..

[53]  Duc Truong Pham,et al.  Multi-objective evolutionary simulated annealing optimisation for mixed-model multi-robotic disassembly line balancing with interval processing time , 2020, Int. J. Prod. Res..

[54]  Ihsan Sabuncuoglu,et al.  Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .

[55]  Askiner Gungor,et al.  A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .

[56]  Weida Xu,et al.  Strategic robust mixed model assembly line balancing based on scenario planning , 2011 .

[57]  Surendra M. Gupta,et al.  Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line , 2010, Comput. Ind. Eng..

[58]  Ibrahim Kucukkoc,et al.  A fast branch, bound and remember algorithm for disassembly line balancing problem , 2020, Int. J. Prod. Res..

[59]  Feifeng Zheng,et al.  A new distribution-free model for disassembly line balancing problem with stochastic task processing times , 2018, Int. J. Prod. Res..

[60]  Alexandre Dolgui,et al.  An efficient two-phase iterative heuristic for Collection-Disassembly problem , 2017, Comput. Ind. Eng..

[61]  Shabbir Ahmed,et al.  On Deterministic Reformulations of Distributionally Robust Joint Chance Constrained Optimization Problems , 2018, SIAM J. Optim..

[62]  Surendra M. Gupta,et al.  Disassembly line in product recovery , 2002 .