Robust disassembly line balancing with ambiguous task processing times
暂无分享,去创建一个
Ming Liu | Feifeng Zheng | Xin Liu | Chengbin Chu | Feng Chu | Feifeng Zheng | C. Chu | Ming Liu | Xin Liu | F. Chu
[1] Alexandre Dolgui,et al. Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem , 2014 .
[2] W. Y. Szeto,et al. A Distributionally Robust Joint Chance Constrained Optimization Model for the Dynamic Network Design Problem under Demand Uncertainty , 2014, Networks and Spatial Economics.
[3] Ruiwei Jiang,et al. Data-driven chance constrained stochastic program , 2015, Mathematical Programming.
[4] Joaquín Bautista,et al. A robustness information and visualization model for time and space assembly line balancing under uncertain demand , 2013 .
[5] Alexandre Dolgui,et al. Second order conic approximation for disassembly line design with joint probabilistic constraints , 2015, Eur. J. Oper. Res..
[6] Alexandre Dolgui,et al. A sample average approximation method for disassembly line balancing problem under uncertainty , 2014, Comput. Oper. Res..
[7] Joaquín Bautista,et al. A multiobjective model and evolutionary algorithms for robust time and space assembly line balancing under uncertain demand , 2016 .
[8] Levent Kandiller,et al. Profit-oriented disassembly-line balancing , 2008 .
[9] Qiang Feng,et al. Distributionally robust chance-constrained minimum variance beamforming , 2016, 2016 IEEE International Conference on Acoustics, Speech and Signal Processing (ICASSP).
[10] Dong-Ho Lee,et al. Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal , 2011 .
[11] Eren Özceylan,et al. Disassembly line balancing problem: a review of the state of the art and future directions , 2019, Int. J. Prod. Res..
[12] Alexandre Dolgui,et al. A Stochastic Formulation of the Disassembly Line Balancing Problem , 2012, APMS.
[13] Alexandre Dolgui,et al. L-Shaped Algorithm for Stochastic Disassembly Line Balancing Problem , 2013, MIM.
[14] MengChu Zhou,et al. Disassembly Sequence Planning Considering Fuzzy Component Quality and Varying Operational Cost , 2018, IEEE Transactions on Automation Science and Engineering.
[15] Weida Xu,et al. Robust balancing of mixed model assembly line , 2009 .
[16] Alfred J.D. Lambert,et al. Linear programming in disassembly/clustering sequence generation , 1999 .
[17] Zhiwu Li,et al. Operation patterns analysis of automotive components remanufacturing industry development in China , 2017 .
[18] Alexandre Dolgui,et al. A taxonomy of line balancing problems and their solutionapproaches , 2013 .
[19] Michael R. Wagner. Stochastic 0-1 linear programming under limited distributional information , 2008, Oper. Res. Lett..
[20] Alexandre Dolgui,et al. Scenario based robust line balancing: Computational complexity , 2012, Discret. Appl. Math..
[21] Tao Yao,et al. Dynamic Traffic Assignment under Uncertainty: A Distributional Robust Chance-Constrained Approach , 2011 .
[22] Manoj Kumar Tiwari,et al. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .
[23] Alexandre Dolgui,et al. Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty , 2018, Int. J. Prod. Res..
[24] Alexander Shapiro,et al. Sample Average Approximation Method for Chance Constrained Programming: Theory and Applications , 2009, J. Optimization Theory and Applications.
[25] Alexandre Dolgui,et al. Assembly line balancing under uncertainty: Robust optimization models and exact solution method , 2013, Comput. Ind. Eng..
[26] Ruiwei Jiang,et al. Distributionally Robust Chance-Constrained Bin Packing , 2016 .
[27] Alexandre Dolgui,et al. A bibliographic review of production line design and balancing under uncertainty , 2015 .
[28] Yinyu Ye,et al. Distributionally Robust Optimization Under Moment Uncertainty with Application to Data-Driven Problems , 2010, Oper. Res..
[29] Alexandre Dolgui,et al. Dealing with uncertainty in disassembly line design , 2014 .
[30] Surendra M. Gupta,et al. A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..
[31] Eren Özceylan,et al. An optimisation support for the design of hybrid production lines including assembly and disassembly tasks , 2018, Int. J. Prod. Res..
[32] J. Frédéric Bonnans,et al. Perturbation analysis of second-order cone programming problems , 2005, Math. Program..
[33] Surendra M. Gupta,et al. Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships , 2001, Eur. J. Oper. Res..
[34] MengChu Zhou,et al. Modeling and Planning for Dual-Objective Selective Disassembly Using and/or Graph and Discrete Artificial Bee Colony , 2019, IEEE Transactions on Industrial Informatics.
[35] Alexandre Dolgui,et al. An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times , 2015 .
[36] Shabbir Ahmed,et al. Distributionally robust simple integer recourse , 2018, Comput. Manag. Sci..
[37] Daniel Kuhn,et al. Distributionally robust joint chance constraints with second-order moment information , 2011, Mathematical Programming.
[38] Alexander Shapiro,et al. Convex Approximations of Chance Constrained Programs , 2006, SIAM J. Optim..
[39] F. Tevhide Altekin,et al. Remedial actions for disassembly lines with stochastic task times , 2016, Comput. Ind. Eng..
[40] Ruiwei Jiang,et al. Ambiguous Chance-Constrained Binary Programs under Mean-Covariance Information , 2016, SIAM J. Optim..
[41] Siqian Shen,et al. Solving 0–1 semidefinite programs for distributionally robust allocation of surgery blocks , 2018, Optim. Lett..
[42] Ayyuce Aydemir-Karadag,et al. Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..
[43] Melvyn Sim,et al. From CVaR to Uncertainty Set: Implications in Joint Chance-Constrained Optimization , 2010, Oper. Res..
[44] Daniel Kuhn,et al. A distributionally robust perspective on uncertainty quantification and chance constrained programming , 2015, Mathematical Programming.
[45] Alexandre Dolgui,et al. Collection-disassembly problem in reverse supply chain , 2017 .
[46] Chaoyong Zhang,et al. An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem , 2017, Int. J. Prod. Res..
[47] Alexandre Dolgui,et al. Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts , 2013, APMS.
[48] Alysson M. Costa,et al. Robust assembly line balancing with heterogeneous workers , 2015, Comput. Ind. Eng..
[49] Mehmet Ali Ilgin,et al. Disassembly line balancing using linear physical programming , 2017, Int. J. Prod. Res..
[50] F. Tevhide Altekin,et al. A comparison of piecewise linear programming formulations for stochastic disassembly line balancing , 2017, Int. J. Prod. Res..
[51] Amin Saberi,et al. INFORMS doi 10.1287/xxxx.0000.0000 c○0000 INFORMS Price of Correlations in Stochastic Optimization , 2022 .
[52] Donald Goldfarb,et al. Second-order cone programming , 2003, Math. Program..
[53] Duc Truong Pham,et al. Multi-objective evolutionary simulated annealing optimisation for mixed-model multi-robotic disassembly line balancing with interval processing time , 2020, Int. J. Prod. Res..
[54] Ihsan Sabuncuoglu,et al. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .
[55] Askiner Gungor,et al. A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .
[56] Weida Xu,et al. Strategic robust mixed model assembly line balancing based on scenario planning , 2011 .
[57] Surendra M. Gupta,et al. Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line , 2010, Comput. Ind. Eng..
[58] Ibrahim Kucukkoc,et al. A fast branch, bound and remember algorithm for disassembly line balancing problem , 2020, Int. J. Prod. Res..
[59] Feifeng Zheng,et al. A new distribution-free model for disassembly line balancing problem with stochastic task processing times , 2018, Int. J. Prod. Res..
[60] Alexandre Dolgui,et al. An efficient two-phase iterative heuristic for Collection-Disassembly problem , 2017, Comput. Ind. Eng..
[61] Shabbir Ahmed,et al. On Deterministic Reformulations of Distributionally Robust Joint Chance Constrained Optimization Problems , 2018, SIAM J. Optim..
[62] Surendra M. Gupta,et al. Disassembly line in product recovery , 2002 .