Fast Network Restoration by Partitioning of Parallel Black Start Zones

The restoration of large electrical power systems after a blackout is often a challenging task. A typical restoration process includes the partitioning of the power systems into subsystems and the successive booting of large non-black start (NBS) units by black start (BS) units. A proper partitioning of the starting zone can reduce the restoration time significantly. This paper investigates a novel network partitioning algorithm to improve the restoration time and ratio of generation and load in each subsystem. The proposed algorithm consists of three stages. In the first stage, the number of subsystems is determined by the number of available BS units and their electrical distance. In the second stage, NBS units are assigned to each subsystem in the way that the rebooting time difference among subsystems is minimised. In the third stage, the substations are assigned to one of the subsystems to achieve the optimal ratio of generation and load in each subsystem. With the proposed algorithm, the switching transient and steady-state over-voltages at the receiving end of unload lines are kept within acceptable ranges and the self-excitation phenomenon does not occur in the subsystems. Furthermore, the start-up sequence of NBS units in each subsystem is determined simultaneously. The proposed algorithm is flexible and can be adjusted very easily according to the real status of the power system. The validity and performance of the proposed approach is demonstrated through simulations using a New England 39 Nodes network and a real network from south China.

[1]  Martin Braun,et al.  Optimizing the generator start-up sequence after a power system blackout , 2014, 2014 IEEE PES General Meeting | Conference & Exposition.

[2]  Wei Shen,et al.  Development of an interactive rule-based system for bulk power system restoration , 2000 .

[3]  Masakazu Kato,et al.  The Development of Power System Restoration Method for a Bulk Power System by Applying Knowledge Engineering Techniques , 1989, IEEE Power Engineering Review.

[4]  Yoshikazu Fukuyama,et al.  A parallel genetic algorithm for service restoration in electric power distribution systems , 1995, Proceedings of 1995 IEEE International Conference on Fuzzy Systems..

[5]  R. Kafka,et al.  Power System Restoration - A Task Force Report , 1987, IEEE Transactions on Power Systems.

[6]  Chen-Ching Liu,et al.  From generic restoration actions to specific restoration strategies , 1995 .

[7]  M. M. Adibi,et al.  Power System Restoration - The Second Task Force Report , 1987, IEEE Transactions on Power Systems.

[8]  M. M. Adibi,et al.  System operations challenges , 1988 .

[9]  C. Andrieu,et al.  A New Restoration Process in Power Systems with Large Scale of Dispersed Generation , 2006, 2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition.

[10]  Chong Wang,et al.  OBDD-Based Sectionalizing Strategies for Parallel Power System Restoration , 2011, IEEE Transactions on Power Systems.

[11]  Y.-T. Hsiao,et al.  Enhancement of restoration service in distribution systems using a combination fuzzy-GA method , 2000 .

[12]  C.-C. Liu,et al.  Generation capability dispatch for bulk power system restoration: a knowledge-based approach , 1993 .

[13]  Y. Kojima,et al.  Development of a Guidance Method for Power System Restoration , 1989, IEEE Power Engineering Review.

[14]  J. J. Ancona A framework for power system restoration following a major power failure , 1995 .

[15]  Jiang Ming-lei A Sectionalizing Method in Power System Restoration Based on WAMS , 2013 .

[16]  T. Sakaguchi,et al.  Development of a Knowledge Based System for Power System Restoration , 1983, IEEE Transactions on Power Apparatus and Systems.

[17]  Wang Feng Research on Limiting Switching Overvoltage by Multistage Closing Resistors in 1000 kV Transmission Lines , 2006 .

[18]  Novica Nosovic,et al.  Dijkstra's shortest path algorithm serial and parallel execution performance analysis , 2012, 2012 Proceedings of the 35th International Convention MIPRO.

[19]  Shanshan Liu,et al.  Black start capability assessment in power system restoration , 2011, 2011 IEEE Power and Energy Society General Meeting.

[20]  M. M. Adibi,et al.  Power system restoration planning , 1994 .