A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty

[1]  James C. Chen,et al.  Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer , 2022, Comput. Ind. Eng..

[2]  Carlos D. Paternina-Arboleda,et al.  A memetic algorithm to address the multi-node resource-constrained project scheduling problem , 2021, Journal of Scheduling.

[3]  Philippe Fortemps,et al.  Reactive heuristics for disrupted multi-mode resource-constrained project scheduling problem , 2020, Expert Syst. Appl..

[4]  Robert Pellerin,et al.  A survey of hybrid metaheuristics for the resource-constrained project scheduling problem , 2020, Eur. J. Oper. Res..

[5]  Izack Cohen,et al.  A robust optimization approach for the multi-mode resource-constrained project scheduling problem , 2019, Eur. J. Oper. Res..

[6]  Hamed Davari-Ardakani,et al.  Multi-mode resource constrained project scheduling and contractor selection: Mathematical formulation and metaheuristic algorithms , 2019, Appl. Soft Comput..

[7]  Ricardo del Olmo Martínez,et al.  A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP) , 2019, Soft Comput..

[8]  Mario Vanhoucke,et al.  A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs , 2019, Eur. J. Oper. Res..

[9]  Sha Tao,et al.  Multi-mode resource-constrained project scheduling problem with alternative project structures , 2018, Comput. Ind. Eng..

[10]  Patrizia Beraldi,et al.  An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations , 2017 .

[11]  Taïcir Loukil,et al.  Multi-objective algorithms to multi-mode resource-constrained projects under mode change disruption , 2017, Comput. Ind. Eng..

[12]  Martin Josef Geiger,et al.  A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem , 2017, Eur. J. Oper. Res..

[13]  Túlio A. M. Toffolo,et al.  An integer programming approach to the multimode resource-constrained multiproject scheduling problem , 2016, J. Sched..

[14]  Pieter Smet,et al.  The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem , 2016, J. Sched..

[15]  Hamidreza Maghsoudlou,et al.  A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem , 2016, Comput. Chem. Eng..

[16]  Ender Özcan,et al.  Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem , 2015, Inf. Sci..

[17]  Walter J. Gutjahr,et al.  Bi-Objective Multi-Mode Project Scheduling Under Risk Aversion , 2015, Eur. J. Oper. Res..

[18]  Sergio Cavalieri,et al.  An improved multi-choice goal programming approach for supplier selection problems , 2015 .

[19]  Gündüz Ulusoy,et al.  Multi-project scheduling with two-stage decomposition , 2014, Ann. Oper. Res..

[20]  Christian Artigues,et al.  Robust optimization for resource-constrained project scheduling with uncertain activity durations , 2011, Flexible Services and Manufacturing Journal.

[21]  Sönke Hartmann,et al.  A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..

[22]  Philippe Fortemps,et al.  A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..

[23]  Po-Han Chen,et al.  Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints , 2009 .

[24]  James H. Patterson,et al.  Scheduling projects with heterogeneous resources to meet time and quality objectives , 2009, Eur. J. Oper. Res..

[25]  Ching-Ter Chang,et al.  Multi-choice goal programming , 2007 .

[26]  Rainer Kolisch,et al.  Experimental investigation of heuristics for resource-constrained project scheduling: An update , 2006, Eur. J. Oper. Res..

[27]  Gang Yu,et al.  A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem , 2006, INFORMS J. Comput..

[28]  Stephen P. Boyd,et al.  Extending Scope of Robust Optimization: Comprehensive Robust Counterparts of Uncertain Problems , 2006, Math. Program..

[29]  Rainer Kolisch,et al.  Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .

[30]  John H Payne,et al.  Management of multiple simultaneous projects: a state-of-the-art review , 1995 .

[31]  F. Brian Talbot,et al.  Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case , 1982 .

[32]  R. Słowiński Multiobjective network scheduling with efficient use of renewable and nonrenewable resources , 1981 .

[33]  Philip M. Wolfe,et al.  Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .

[34]  Erik Demeulemeester,et al.  Time slack-based techniques for robust project scheduling subject to resource uncertainty , 2011, Ann. Oper. Res..

[35]  Stavros A. Zenios,et al.  Robust Optimization , 2009, Princeton Series in Applied Mathematics.

[36]  Andreas S. Schulz,et al.  Sloan School of Management Working Paper 4231-02 April 2002 SOLVING PROJECT SCHEDULING PROBLEMS BY MINIMUM CUT , 2002 .