Production and interplant batch delivery scheduling: Dominance and cooperation
暂无分享,去创建一个
Alessandro Agnetis | Mohamed Ali Aloulou | Liang-Liang Fu | A. Agnetis | M. Aloulou | Liang-Liang Fu
[1] Zhi-Long Chen,et al. Machine scheduling with transportation considerations , 2001 .
[2] Asoo J. Vakharia,et al. Integrated production/distribution planning in supply chains: An invited review , 1999, Eur. J. Oper. Res..
[3] V. Bowman. On the Relationship of the Tchebycheff Norm and the Efficient Frontier of Multiple-Criteria Objectives , 1976 .
[4] Jean-Charles Billaut,et al. Two-machine shop scheduling: Compromise between flexibility and makespan value , 2005, Eur. J. Oper. Res..
[5] Marc Reimann,et al. JOINT OPTIMIZATION OF PRODUCTION PLANNING AND VEHICLE ROUTING PROBLEMS: A REVIEW OF EXISTING STRATEGIES , 2014 .
[6] George Steiner,et al. Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs , 2009, Oper. Res..
[7] Alessandro Agnetis,et al. Supply chain scheduling: Sequence coordination , 2006, Discret. Appl. Math..
[8] George L. Vairaktarakis,et al. Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs , 2012, Oper. Res..
[9] Douglas J. Thomas,et al. Coordinated supply chain management , 1996 .
[10] Appa Iyer Sivakumar,et al. Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation , 2008 .
[11] ChenZhi-Long. Integrated Production and Outbound Distribution Scheduling , 2010 .
[12] Chris N. Potts,et al. Supply chain scheduling: Batching and delivery , 2003, Oper. Res..
[13] Koichiro Tezuka,et al. Rationale for utilizing 3PL in supply chain management: A shippers' economic perspective , 2011 .
[14] Lixin Tang,et al. Steelmaking and refining coordinated scheduling problem with waiting time and transportation consideration , 2010, Comput. Ind. Eng..
[15] Rakesh Nagi,et al. A review of integrated analysis of production-distribution systems , 1999 .
[16] Xiaoqiang Cai,et al. Capacity allocation and coordination issues for the timely processing of outsourced operations , 2014 .
[17] Zhi-Long Chen,et al. Integrated Production and Outbound Distribution Scheduling: Review and Extensions , 2010, Oper. Res..
[18] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[19] Jan Herrmann. Supply-Chain-Scheduling , 2010 .
[20] Chelliah Sriskandarajah,et al. Coordination in a two-stage production system: Complexity, conflict and cooperation , 2007, Comput. Oper. Res..
[21] E. Kalai. Proportional Solutions to Bargaining Situations: Interpersonal Utility Comparisons , 1977 .
[22] Zhi-Long Chen,et al. Supply Chain Scheduling: Conflict and Cooperation in Assembly Systems , 2007, Oper. Res..
[23] Najoua Dridi,et al. A bicriteria two-machine flow-shop serial-batching scheduling problem with bounded batch size , 2014, J. Sched..
[24] Alessandro Agnetis,et al. Coordination of production and interstage batch delivery with outsourced distribution , 2014, Eur. J. Oper. Res..
[25] Christian A. Ullrich. Integrated machine scheduling and vehicle routing with time windows , 2013, Eur. J. Oper. Res..
[26] Zhi-Long Chen,et al. Integrated Charge Batching and Casting Width Selection at Baosteel , 2014, Oper. Res..
[27] Rui Zhang,et al. Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains , 2009, J. Sched..
[28] Lixin Tang,et al. Two-machine flowshop scheduling with intermediate transportation under job physical space consideration , 2011, Comput. Oper. Res..
[29] George L. Vairaktarakis,et al. Sequencing Strategies and Coordination Issues in Outsourcing and Subcontracting Operations , 2011 .
[30] George L. Vairaktarakis,et al. A Cooperative Savings Game Approach to a Time Sensitive Capacity Allocation and Scheduling Problem , 2013, Decis. Sci..
[31] George L. Vairaktarakis,et al. Coordination of Outsourced Operations to Minimize Weighted Flow Time and Capacity Booking Costs , 2009, Manuf. Serv. Oper. Manag..
[32] Andrzej P. Wierzbicki,et al. The Use of Reference Objectives in Multiobjective Optimization , 1979 .
[33] Chung Yee Lee,et al. Two-machine shop scheduling with an uncapacitated interstage transporter , 2005 .
[34] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[35] Chelliah Sriskandarajah,et al. Supply chain scheduling: Just-in-time environment , 2008, Ann. Oper. Res..
[36] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[37] Zhi-Long Chen,et al. Integrated production and distribution scheduling with committed delivery dates , 2010, Oper. Res. Lett..