Methods and Tools for Planning the Future Power System: Issues and Priorities
暂无分享,去创建一个
[1] R. M. Dunnett,et al. Contingency constrained economic dispatch algorithm for transmission planning , 1989 .
[2] Keith Bell,et al. A comparison of design options for offshore HVDC networks through a sequential Monte-Carlo reliability analysis , 2014 .
[3] B. Zecca,et al. Probabilistic model for adequacy evaluation of electric networks with sizeable wind power generation , 2004, IEEE PES Power Systems Conference and Exposition, 2004..
[4] Keith Bell,et al. A flexible and comprehensive approach to the assessment of large-scale power system security under uncertainty , 2004 .
[5] James D. McCalley,et al. Multiobjective evolutionary algorithm for long-term planning of the national energy and transportation systems , 2011 .
[6] Danny Pudjianto,et al. Asymmetric impacts of European transmission network development towards 2050: Stakeholder assessment based on IRENE-40 scenarios , 2016 .
[7] D. P. Nedic,et al. The Need for Interconnection Reserve in a System With Wind Generation , 2012, IEEE Transactions on Sustainable Energy.
[8] Tom Houghton,et al. The economic case for developing HVDC-based networks to maximise renewable energy utilisation across Europe : an advanced stochastic approach to determining the costs and benefits , 2012 .
[9] Keith Bell,et al. Simplified representation of a large transmission network for use in long-term expansion planning , 2014, 2014 Power Systems Computation Conference.
[10] Lingling Fan,et al. Regional transmission planning for large-scale wind power , 2009, 2009 IEEE Power & Energy Society General Meeting.
[11] James D. McCalley,et al. Maximizing Future Flexibility in Electric Generation Portfolios , 2014, IEEE Transactions on Power Systems.
[12] P. Bresesti,et al. The benefits of transmission expansions in the competitive electricity markets , 2009 .
[13] R. Calisti,et al. Offshore grids: The Irish view , 2010, IEEE PES General Meeting.
[14] Keith Bell,et al. Power system analysis: emerging issues for utilities , 2002 .
[15] A. Mansoldo,et al. Optimizing and leveraging future offshore and onshore HV grid — Results from a Long Term Expansion Planning methodology , 2012, 2012 IEEE Power and Energy Society General Meeting.
[16] Nigel Spinks,et al. Educating Engineers for the 21st Century: The Industry View , 2006 .
[17] David M. Greenwood,et al. Investigating the Impact of Real-Time Thermal Ratings on Power Network Reliability , 2014, IEEE Transactions on Power Systems.