Multi-camera surveillance systems for time and motion studies of timber harvesting equipment

A multi-camera security system was tested to conduct a time and motion study.The system was installed on a John Deere 540G cable skidder.Time stamped video footage was inspected to obtain time consumption of work tasks.Accurate calculation of total cycle times and delays as well as productivity metrics.The system can be adopted as a reliable approach to conduct time and motion studies. We evaluated the feasibility of using a multi-camera security system to conduct time and motion studies. It was installed on a John Deere 540G cable skidder and connected to the skidders battery for continuous recording with minimal effort and intervention. After recording the skidders work for eleven experimental skidding cycles, time stamped video footage was visually inspected to obtain time consumption of work tasks, which provided for accurate calculation of total cycle times and delays. Several advantages of the security camera system including quick and non-invasive installation, large memory storage, transferability, resistance to weather elements, and the capacity to capture different views, offer a great potential for this method to be adopted as a reliable approach to accurately conduct time and motion studies. Along with distance and gradient information for skid-trail segments, we also explored the influence of gradient on travel time for loaded and unloaded skidding. There is a need for future studies to formally explore this relationship and develop more detailed cycle time equations that explicitly take into account skid-trail gradient for individual segments.

[1]  Seyed Ataollah Hosseini,et al.  Possibility of global positioning system (GPS) application for time studies in forest machinery , 2013 .

[2]  Chris B. LeDoux,et al.  Cycle-time equations for five small tractors operating in low-volume small-diameter hardwood stands , 1992 .

[3]  Marco A. Contreras,et al.  Designing Skid-Trail Networks to Reduce Skidding Cost and Soil Disturbance for Ground-Based Timber Harvesting Operations , 2016 .

[4]  Jori Uusitalo,et al.  Effect of edge trees on harvester positioning in thinning , 2006 .

[5]  Baris Majnounian,et al.  Time study and skidding capacity of the wheeled skidder Timberjack 450C in Caspian forests , 2018 .

[6]  Loren D. Kellogg,et al.  Comparison of Time-Study Techniques for Evaluating Logging Production , 1983 .

[7]  Natascia Magagnotti,et al.  The role of work studies in forest engineering: status and perspectives , 2015 .

[8]  John P. Fulton,et al.  Automated time study of skidders using global positioning system data , 2005 .

[9]  Jingxin Wang,et al.  Production analysis of an excavator-based harvester: A case study in Finnish forest operations , 2002 .

[10]  Masahiko Nakagawa,et al.  Effect of Tree Size on Productivity and Time Required for Work Elements in Selective Thinning by a Harvester , 2007 .

[11]  Jingxin Wang,et al.  A computer-based time study system for timber harvesting operations , 2003 .

[12]  Sten Gellerstedt Operation of the Single-Grip Harvester: Motor-Sensory and Cognitive Work , 2002 .

[13]  Richard Parker,et al.  WEARABLE VIDEO TO RECORD TREE FELLING WORK METHODS , 2010 .

[14]  Rick Mitchell,et al.  Automated Time Study of Forwarders using GPS and a vibration sensor , 2015 .

[15]  Jori Uusitalo,et al.  Time consumption analysis of the mechanized cut-to-length harvesting system , 2006 .

[16]  Floyd G. Timson Sawlog weights for Appalachian hardwoods , 1972 .

[17]  Akbar Najafi,et al.  Productivity and cost of farm tractor skidding. , 2018 .