Scheduling of steel-making and continuous casting system using the surrogate subgradient algorithm for lagrangian relaxation

How to make a good schedule in a computationally efficient manner and be able to assess the quality of schedule to improve the steel production and effectively assist the reschedule during the process of steel-making and continuous casting are the key factors for iron and steel production manufacturing productivity. The surrogate subgradient algorithm for lagrangian relaxation is introduced to solve the problem. The surrogate subgradient method can get a proper direction without solving all the separated charge's schedule to optimize dual functions for separable steel-making and continuous casting schedule problems which are relaxed by lagrangian relaxation method. The results shows that this method can obtain better directions with less efforts and less times to get better schedule results.

[1]  Chengbin Chu,et al.  A more efficient Lagrangian relaxation approach to job-shop scheduling problems , 1995, Proceedings of 1995 IEEE International Conference on Robotics and Automation.

[2]  Marshall L. Fisher,et al.  The Lagrangian Relaxation Method for Solving Integer Programming Problems , 2004, Manag. Sci..

[3]  Peter B. Luh,et al.  Scheduling of manufacturing systems using the Lagrangian relaxation technique , 1991, IEEE Trans. Autom. Control..

[4]  Peter B. Luh,et al.  Near-Optimal Scheduling of Manufacturing Systems with Presence of Batch Machines and Setup Requirements , 1997 .

[5]  Dimitri P. Bertsekas,et al.  Nonlinear Programming , 1997 .

[6]  E. W. Davis,et al.  Multiple Resource–Constrained Scheduling Using Branch and Bound , 1978 .

[7]  Peter B. Luh,et al.  Steel-making process scheduling using Lagrangian relaxation , 2002 .

[8]  Lixin Tang,et al.  A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..

[9]  Krishna R. Pattipati,et al.  A practical approach to job-shop scheduling problems , 1993, IEEE Trans. Robotics Autom..

[10]  Lixin Tang,et al.  A mathematical programming model for scheduling steelmaking-continuous casting production , 2000, Eur. J. Oper. Res..

[11]  P. B. Luh,et al.  A reduced-complexity bundle method for maximizing concave nonsmooth functions , 1996, Proceedings of 35th IEEE Conference on Decision and Control.

[12]  Marshall L. Fisher,et al.  Optimal Solution of Scheduling Problems Using Lagrange Multipliers: Part I , 1973, Oper. Res..

[13]  J. Hiriart-Urruty,et al.  Convex analysis and minimization algorithms , 1993 .