Success Factors and Barriers of Last Planner System Implementation in the Gaza Strip Construction Industry

RESEARCH ARTICLE Success Factors and Barriers of Last Planner System Implementation in the Gaza Strip Construction Industry Bassam A. Tayeh, Khalid Al Hallaq, Abdulla H. Al Faqawi, Wesam S. Alaloul and Soo Y. Kim Civil Engineering Department, Faculty of Engineering, Islamic University of Gaza, Gaza, Palestine Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, Bandar Seri Iskandar, 32610 Tronoh, Perak, Malaysia Department of Civil Engineering, Pukyong National University, 45 Yongso-ro, Nam-gu, Busan, 48513, South Korea

[1]  Noor Amila Wan Abdullah Zawawi,et al.  Communication, coordination and cooperation in construction projects: business environment and human behaviours , 2017 .

[2]  Bo Terje Kalsaas,et al.  The Last Planner System Style of Planning: Its Basis in Learning Theory , 2012 .

[3]  Othman A. Tayeh,et al.  The Organizational Culture of Gaza Strip Construction Companies , 2018 .

[4]  Bassam A. Tayeh,et al.  Strategic Planning in Construction Companies in Gaza Strip , 2014 .

[5]  Khalid Al Hallaq,et al.  Effects of Faulty Design Phase on School Buildings Maintenance in Gaza Strip , 2016 .

[6]  Vishal Porwal,et al.  Last Planner System – Areas of Application and Implementation Challenges , 2012 .

[7]  Mohd Shahir Liew,et al.  Delays and Cost Overruns Causes During Construction of Palm Oil Refinery Projects , 2018 .

[8]  이영식 Communication 으로서의 영어교육 , 1986 .

[9]  Satish Mohan,et al.  Effectiveness of lean principles in construction , 2005 .

[10]  Lauri Koskela,et al.  Last planner system : experiences from pilot implementation in the middle east , 2009 .

[11]  Wesam Salah Alaloul,et al.  Factors Affecting the Success of Construction Projects in Gaza Strip , 2018, The Open Civil Engineering Journal.

[12]  Mohd Shahir Liew,et al.  The characteristics of coordination process in construction projects , 2015, 2015 International Symposium on Technology Management and Emerging Technologies (ISTMET).

[13]  Noor Amila Wan Abdullah Zawawi,et al.  Identification of coordination factors affecting building projects performance , 2016 .

[14]  Fernando Cerveró-Romero,et al.  Last Planner System and Lean Approach Process Experiences From Implementation in Mexico , 2013 .

[15]  Mohd Shahir Liew,et al.  A Framework for Coordination Process into Construction Projects , 2016 .

[16]  Faisal Manzoor Arain,et al.  Major causes of problems between contractors and subcontractors in the Gaza Strip , 2012 .

[17]  Peter E.D. Love,et al.  Triangulation in construction management research , 2002 .

[18]  Faisal Manzoor Arain,et al.  Subcontractor Prequalification Practices in Palestine , 2010 .

[19]  Noor Amila Wan Abdullah Zawawi,et al.  Coordination process in construction projects management , 2016 .

[20]  John Rooke,et al.  An examination of the barriers to last planner implementation , 2011 .

[21]  Luis F. Alarcón,et al.  ORGANIZING TO INTRODUCE LEAN PRACTICES IN CONSTRUCTION COMPANIES , 2001 .

[22]  Sarel Lavy,et al.  Last Planner System Implementation Challenges , 2010 .

[23]  Kiyoung Son,et al.  Survey of Motivations, Benefits, and Implementation Challenges of Last Planner System Users , 2013 .

[24]  Jin Woo Jang,et al.  IMPORTANCE OF PARTNERS IN A CHALLENGING LEAN JOURNEY , 2007 .

[25]  Noor Amila Wan Abdullah Zawawi,et al.  Delphi Technique Procedures: A New Perspective in Construction Management Research , 2015 .

[26]  Lauri Koskela,et al.  Last Planner and Critical Chain in Construction Management: Comparative Analysis , 2010 .

[27]  Amm Liu,et al.  Research Methods for Construction (3rd ed.) , 2008 .

[28]  Mohd Shahir Liew,et al.  An Artificial neural networks (ANN) model for evaluating construction project performance based on coordination factors , 2018 .

[29]  C. MarioFiallo,et al.  Applying the Last Planner Control System to a Construction Project - A Case Study in Quito, Ecuador , 2002 .

[30]  Roberto Arbulu,et al.  A Design Case Study: Integrated Product and Process Management , 2006 .

[31]  Ali Abed El Fattah Yahia Time Schedule Preparation by Predicting Production Rate Using Simulation , 2004 .

[32]  Iris D. Tommelein,et al.  Is the Last Planner System Applicable to Design? A Case Study , 2009 .

[33]  Ossama Salem,et al.  Site Implementation and Assessment of Lean Construction Techniques , 2005 .

[34]  Min Liu,et al.  Factors Affecting Work Flow Reliability - A Case Study , 2009 .

[35]  Richard L. Tucker,et al.  Automation and robotics in construction X : proceedings of the 10th International Symposium on Automation and Robotics in Construction (ISARC), Houston, Texas, U.S.A., 24-26 May, 1993 , 1993 .

[36]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[37]  Luis F. Alarcón,et al.  Assessing the Impacts of Implementing Lean Construction , 2008 .

[38]  Bassam A. Tayeh,et al.  Importance of Organizational Culture for Gaza Strip Construction Companies , 2018 .

[39]  Jesus M. de la Garza,et al.  Last Planner Technique: A Case Study , 2000 .

[40]  Yong-Woo Kim,et al.  Case Study: An Application of Last Planner to Heavy Civil Construction in Korea , 2005 .

[41]  Lauri Koskela,et al.  Introducing last planner - Finnish experiences , 2005 .

[42]  Lauri Koskela,et al.  Lean Production in Construction , 1993 .

[43]  Soo Yong Kim,et al.  Identifying causes for waste factors in high-rise building projects: A survey in Vietnam , 2014 .

[44]  M. Albhaisi,et al.  Factors Causing Variation Orders in Construction Projects in Gaza Strip (Case Study: Qatar Projects) , 2016 .

[45]  Sven Bertelsen,et al.  Lean Construction: Where Are We and How To Proceed? , 2004, Lean Construction Journal.

[46]  Luis F. Alarcón,et al.  COLLABORATIVE IMPLEMENTATION OF LEAN PLANNING SYSTEMS IN CHILEAN CONSTRUCTION COMPANIES , 2002 .

[47]  Rafael Sacks,et al.  Conceptualization of Interdependency and Coordination Between Construction Tasks , 2011 .

[48]  Sol Skinnarland,et al.  The Last Planner System as a Driver for Knowledge Creation , 2012 .

[49]  Carlos Torres Formoso,et al.  Integrating Strategic Project Supply Chain Members in Production Planning and Control , 2007 .

[50]  Christine Pasquire,et al.  Lean construction trial on a highways maintenance project , 2007 .

[51]  Luis F. Alarcón,et al.  Accelerating Interactions in Project Design Through Extreme Collaboration and Commitment Management – A Case Study , 2009 .

[52]  Bhargav Dave,et al.  Exploring the Recurrent Problems in the Last Planner Implementation on Construction Projects , 2015 .

[53]  Sergio Kemmer,et al.  Medium-Term Planning: Constributions Based on Field Application , 2007 .

[54]  Glenn Ballard,et al.  A Case Study on Rebar Supply Chain Management by GS E&C , 2007 .

[55]  Soo Yong Kim,et al.  A survey on production planning system in construction projects based on Last Planner System , 2016 .