Parallel-machine rescheduling with machine disruptions
暂无分享,去创建一个
[1] S. D. Wu,et al. On Scheduling with Ready-Times, Due-Dates and Vacations , 1992 .
[2] Reha Uzsoy,et al. Rescheduling on a single machine with part-type dependent setup times and deadlines , 1997, Ann. Oper. Res..
[3] Reha Uzsoy,et al. Analysis of periodic and event-driven rescheduling policies in dynamic shops , 1992 .
[4] William L. Maxwell,et al. Theory of scheduling , 1967 .
[5] Pei-Chann Chang,et al. One-machine rescheduling heuristics with efficiency and stability as criteria , 1993, Comput. Oper. Res..
[6] James C. Bean,et al. Matchup Scheduling with Multiple Resources, Release Dates and Disruptions , 1991, Oper. Res..
[7] Wade H. Shaw,et al. Simulation modeling of a dynamic job shop rescheduling with machine availability constraints , 1998 .
[8] Bo Guo,et al. Rescheduling and optimization of schedules considering machine failures , 1999 .
[9] Louis A. Martin-Vega,et al. Flow-time performance of modified scheduling heuristics in a dynamic rescheduling environment , 1996 .
[10] Eugene L. Lawler,et al. Sequencing and scheduling: algorithms and complexity , 1989 .
[11] Jeffrey W. Herrmann,et al. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..
[12] M. Selim Akturk,et al. Match-up scheduling under a machine breakdown , 1999, Eur. J. Oper. Res..