Cost Estimation Model Using Modified Parameters for Construction Projects
暂无分享,去创建一个
Joseph Ahn | Sae-Hyun Ji | Hyun-Soo Lee | Kyeongjin Han | Hyun-soo Lee | Sae-Hyun Ji | Joseph Ahn | Kyeongjin Han
[1] Christopher K. Riesbeck,et al. Inside Case-Based Reasoning , 1989 .
[2] Muhammad T. Hatamleh,et al. Factors affecting the accuracy of cost estimate: case of Jordan , 2018 .
[3] Martin Skitmore,et al. Drivers of the accuracy of developers’ early stage cost estimates in residential construction , 2016 .
[4] J. M. Castelain,et al. Cost Estimation During Design Step: Parametric Method versus Case Based Reasoning Method , 1999 .
[5] Gwang-Hee Kim,et al. Comparing Cost Prediction Methods for Apartment Housing Projects: CBR versus ANN , 2005 .
[6] Kwonsik Song,et al. Covariance effect analysis of similarity measurement methods for early construction cost estimation using case-based reasoning , 2017 .
[7] Robert I. Carr. Cost-Estimating Principles , 1989 .
[8] Sangyong Kim. Interval Estimation of Construction Cost Using Case-Based Reasoning and Genetic Algorithms , 2012 .
[9] Sabah Alkass,et al. Computer-Integrated System for Estimating the Costs of Building Projects , 2007 .
[10] Chang-Taek Hyun,et al. A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects , 2010 .
[11] Kyung In Kang,et al. A case-based reasoning cost estimating model using experience by analytic hierarchy process , 2007 .
[12] Jaeyoul Chun,et al. Cost Estimating Methods for RC Structures by Quantity Takeoff and Quantity Prediction in the Design Development Stage , 2015 .
[13] Adrian J. Smith. Estimating, Tendering and Bidding for Construction , 1995 .
[14] Chang-Taek Hyun,et al. A Study on the Development of a Cost Model Based on the Owner's Decision Making at the Early Stages of a Construction Project , 2010 .
[15] Nie-Jia Yau,et al. Case‐Based Reasoning in Construction Management , 1998 .
[16] Andrew Whyte,et al. Evaluation of non-cost factors affecting the life cycle cost: an exploratory study , 2016 .
[17] Agnar Aamodt,et al. Case-Based Reasoning: Foundational Issues, Methodological Variations, and System Approaches , 1994, AI Commun..
[18] Paul Teicholz. Forecasting Final Cost and Budget of Construction Projects , 1993 .
[19] Hyun-Soo Lee,et al. Cost estimation model for building projects using case-based reasoning , 2011 .
[20] M. Porter. Competitive Advantage: Creating and Sustaining Superior Performance , 1985 .
[21] Samuel Famiyeh,et al. Major causes of construction time and cost overruns , 2017 .
[22] Joseph Ahn,et al. Military Facility Cost Estimation System Using Case-Based Reasoning in Korea , 2011, J. Comput. Civ. Eng..
[23] Brian Everitt,et al. Miscellaneous Clustering Methods , 2011 .
[24] Richard Kirkham. Ferry and Brandon's Cost Planning of Buildings , 2007 .
[25] Sevgi Zeynep Dogan,et al. Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural Systems , 2006 .
[26] Akintola Akintoye,et al. A survey of current cost estimating practices in the UK , 2000 .
[27] Ratnasamy Muniandy,et al. Construction tender price estimation standardization (TPES) in Malaysia , 2018 .