Installation strength analysis of subsea flowline jumpers

Subsea flowline jumper (FJ) is basic connection component for the wet oil tree, the subsea pipeline and the riser base, playing an irreplaceable role in the subsea production system. During the installation of FJ, collisions often happen between FJ and other equipment, which may cause serious damage. Besides, as the operating water depth increases, the demand for the installation equipments like the crane and winch will increase. The research of deepwater FJ installation in China is still in the primary stage, so an installation method for deepwater FJ is proposed in this paper. Finite element models of a typical M-shape FJ installation system were built to simulate the installation procedures. Analysis results showed that the installation steps designed for the FJ are feasible and valid for deepwater FJ. In order to ensure the safety of the installation process, the collision-sensitive analysis for the FJ was conducted, and results show that it is necessary to set the pick up speed at a proper value, in order to avoid collision in installation process. Besides, the mechanical characteristics of FJ during the installation were investigated under a range of environmental conditions and it was found that the maximum stress of the FJ always happens at its central position. The basic requirements for the installation equipment were also obtained through the analysis of the main installation steps.

[1]  Qianjin Yue,et al.  Dynamic loading history and collapse analysis of the pipe during deepwater S-lay operation , 2015 .

[2]  Deli Gao,et al.  Static analysis of deep-water marine riser subjected to both axial and lateral forces in its installation , 2014 .

[3]  Wang,et al.  Subsea rigid jumper design and VIV fatigue evaluation , 2013 .

[4]  Dong Nan Key Issues of Deep Water Hybrid Riser Base Jumper Design , 2012 .

[5]  C. D. Cone,et al.  The Aerodynamic Design of Wings with Cambered Span Having Minimum Induced Drag , 1963 .

[6]  Zhou Hong-jie Nonlinear Static Finite Element Stress Analysis of Pipe-in-Pipe Risers , 2005 .

[7]  Cong Wang,et al.  An Overview of Deepwater Pipeline Laying Technology , 2008 .

[8]  Wei Chen Status and challenges of Chinese deepwater oil and gas development , 2011 .

[9]  Bai Yong INVESTIGATION ON SUBSEA PRODUCTION SYSTEMS , 2009 .

[10]  Hu Xu-yan Failure analysis of some submarine pipeline , 2013 .

[11]  H Yang Parametric study for sensitivity analysis of M shape subsea jumper , 2014 .

[12]  Xuanze Ju,et al.  Stress analysis of the subsea dynamic riser baseprocess piping , 2014 .

[13]  Paul Jukes,et al.  VIV analysis of pipelines under complex span conditions , 2009 .

[14]  Deli Gao,et al.  Study on lateral vibration analysis of marine riser in installation-via variational approach , 2015 .

[15]  André C. Nogueira,et al.  Canyon express flowline system: Design and installation , 2003 .

[16]  Yong Bai,et al.  Quantitative risk assessment & leak detection criteria for a subsea oil export pipeline , 2009 .

[17]  Xue Hongxiang Ultimate strength analysis of a jumper in subsea production facility , 2013 .

[18]  Li Li-wei,et al.  Analysis of Primary Influence Factors for Deep-water Rigid Jumper Design , 2012 .

[19]  Liping Sun,et al.  The effect of functional loads on free spanning pipeline’s VIV response , 2009 .

[20]  Deli Gao,et al.  Axial dynamic analysis of marine riser in installation , 2014 .

[21]  Matthieu Minguez,et al.  Riser Base Jumper Slugging Analysis by CFD Simulations , 2013 .

[22]  Xie Yi Research and development of subsea manifold installation methods , 2011 .