Evolutionary game and numerical simulation of participants' collaborative behavior in integrated project delivery project

Abstract BIM cost, owner's punishment intensity, liquidated damage, size and allocation ratio of incentive pool, Integrated Project Delivery (IPD) gain, loss caused by BIM data resource sharing and other variable parameters are introduced into tripartite evolutionary game model which is established based on evolutionary game theory. Tripartite behavioral strategies are analyzed by evolutionary game theory. The stability of system equilibrium and influence of variable parameters on the stability of evolutionary games are discussed. The tripartite dynamic evolutionary game law based on collaborative behavior under the premise of limited rationality is studied. Then, the tripartite game pathways are numerically simulated by using MATLAB software. The influence of initial intention and variable parameters on the process and results of system evolution are analyzed. The dynamic mechanism of owner's supervision on contractor's and designer's collaborative behavior strategies is clarified. It shows that key point of driving participants to choose collaborative behavior is on owner side.

[1]  Donghoon Lee,et al.  Automatic Rebar Estimation Algorithms for Integrated Project Delivery , 2016 .

[2]  Reza Akhavian,et al.  Synergistic Effect of Integrated Project Delivery, Lean Construction, and Building Information Modeling on Project Performance Measures: A Quantitative and Qualitative Analysis , 2019, Advances in Civil Engineering.

[3]  Zhiliang Ma,et al.  A dedicated collaboration platform for Integrated Project Delivery , 2018 .

[4]  Keith R. Molenaar,et al.  Exploring performance of the integrated project delivery process on complex building projects , 2016 .

[5]  Burcin Becerik-Gerber,et al.  Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery , 2010 .

[6]  J. J. Smallwood,et al.  THE AWARENESS OF INTEGRATED PROJECT DELIVERY AND BUILDING INFORMATION MODELLING - FACILITATING CONSTRUCTION PROJECTS , 2018 .

[7]  Xujuan Zhou,et al.  Simulation study on passive buildings' demand incentive based on evolutionary game , 2019, J. Intell. Fuzzy Syst..

[8]  Terje I. Vaaland,et al.  Improving project collaboration: start with the conflicts , 2004 .

[9]  Robert Leicht,et al.  Practices for Designing Cross-Functional Teams for Integrated Project Delivery , 2019, Journal of Construction Engineering and Management.

[10]  Pardis Pishdad-Bozorgi,et al.  Symbiotic Relationships between Integrated Project Delivery (IPD) and Trust , 2016 .

[11]  Vernon D. Miller,et al.  Interorganizational Projects: Reexamining Innovation Implementation via IPD Cases , 2017 .

[12]  Lianying Zhang,et al.  Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery , 2013 .