Continuous flow models for batch manufacturing: a basis for a hierarchical approach
暂无分享,去创建一个
[1] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[2] Roger M. Y. Ho,et al. Goal programming and extensions , 1976 .
[3] Mauro Dell'Amico,et al. Applying tabu search to the job-shop scheduling problem , 1993, Ann. Oper. Res..
[4] David D. Yao,et al. Scheduling semiconductor lines using a fluid network model , 1994, IEEE Trans. Robotics Autom..
[5] Chris N. Potts,et al. Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .
[6] Agostino Villa,et al. DOPP - Dynamically Optimized Production Planning , 1988 .
[7] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[8] Henry C. Co,et al. A methodical approach to the flexible-manufacturing-system batching, loading and tool configuration problems , 1990 .
[9] S. S. Panwalkar,et al. The Lessons of Flowshop Scheduling Research , 1992, Oper. Res..
[10] Jimmie Browne,et al. Production management systems - a CIM perspective , 1988 .
[11] John B. Kidd,et al. Toyota Production System , 1993 .
[12] Robert J. Wittrock,et al. Scheduling Algorithms for Flexible Flow Lines , 1985, IBM J. Res. Dev..
[13] Stanley Gershwin,et al. A control theorist's perspective on recent trends in manufacturing systems , 1984, The 23rd IEEE Conference on Decision and Control.
[14] E. Toczylowski,et al. Multi-level production scheduling for a class of flexible machining and assembly systems , 1989 .
[15] Stanley B. Gershwin,et al. Manufacturing Systems Engineering , 1993 .
[16] Yeong-Dae Kim. A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings , 1990 .
[17] T. Sawik. Modelling and scheduling of a Flexible Manufacturing System , 1990 .
[18] Egon Balas,et al. The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .
[19] Robert C. Leachman,et al. MULTI-PROJECT SCHEDULING WITH EXPLICIT LATENESS COSTS , 1993 .
[20] Jacek Blazewicz,et al. Scheduling under resource constraints - deterministic models , 1986 .
[21] Paolo Brandimarte,et al. Routing and scheduling in a flexible job shop by tabu search , 1993, Ann. Oper. Res..
[22] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[23] Michael C. Caramanis,et al. Near optimal manufacturing flow controller design , 1991 .
[24] J. Hunsucker,et al. BRANCH AND BOUND ALGORITHM FOR THE FLOW SHOP WITH MULTIPLE PROCESSORS , 1991 .
[25] Fu-Shiung Hsieh,et al. Scheduling flexible flow shops of no setup cost by a Lagrangian relaxation and network flow approach , 1991, Proceedings. 1991 IEEE International Conference on Robotics and Automation.
[26] Eugene L. Lawler,et al. Sequencing and scheduling: algorithms and complexity , 1989 .
[27] A. Sharifnia. Performance Of Production Control Methods Based On Flow Control Approach , 1992, Proceedings of the Third International Conference on Computer Integrated Manufacturing,.
[28] Eugene L. Lawler,et al. Chapter 9 Sequencing and scheduling: Algorithms and complexity , 1993, Logistics of Production and Inventory.
[29] Michael Pinedo,et al. Sequencing in an Assembly Line with Blocking to Minimize Cycle Time , 1989, Oper. Res..
[30] Jwm Will Bertrand,et al. Production Control: A Structural and Design Oriented Approach , 1990 .
[31] Jim Browne,et al. Production activity control: A practical approach to scheduling , 1991 .
[32] J. Wesley Barnes,et al. A tabu search experience in production scheduling , 1993, Ann. Oper. Res..
[33] Seok Hwan Moon,et al. Work flow control in the flexible flow line , 1992 .
[34] S. Gershwin,et al. A control perspective on recent trends in manufacturing systems , 1986, IEEE Control Systems Magazine.
[35] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[36] Zvi Drezner,et al. Multi-stage production with variable lot sizes and transportation of partial lots , 1984 .
[37] Stanley B. Gershwin,et al. Performance of hierarchical production scheduling policy , 1984 .
[38] Awi Federgruen,et al. Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques , 1986 .
[39] Pius J. Egbelu. Batch production time in a multi-stage system with material-handling consideration , 1991 .
[40] P. Ow,et al. Filtered beam search in scheduling , 1988 .
[41] T. B. Tate,et al. Machine Scheduling Problems , 1978 .