Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
暂无分享,去创建一个
[1] Chandrasekharan Rajendran,et al. Scheduling in resource-constrained multiple projects to minimise the weighted tardiness and weighted earliness of projects , 2010 .
[2] Chee-Chuong Sum,et al. An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment , 1997 .
[3] Rainer Kolisch,et al. PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .
[4] Kum Khiong Yang,et al. A comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment , 1993 .
[5] I. Kurtulus,et al. Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .
[6] James Herbert Patterson,et al. Alternate Methods of Project Scheduling with Limited Resources , 1973 .
[7] Gerald Benjamin Siegel. An investigation of job shop scheduling for jobs with assembly constraints , 1971 .
[8] Erik Demeulemeester,et al. RanGen: A Random Network Generator for Activity-on-the-Node Networks , 2003, J. Sched..
[9] Mitsuo Gen,et al. Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling , 2003, Appl. Soft Comput..
[10] Huan Neng Chiu,et al. Two heuristics for scheduling multiple projects with resource constraints , 1996 .
[11] Douglas B. Bock,et al. A Comparison of Due Date Setting, Resource Assignment, and Job Preemption Heuristics for the Multiproject Scheduling Problem* , 1990 .
[12] Madan Lal Mittal,et al. Two-phase heuristics for scheduling of multiple projects , 2009 .
[13] Pankaj Dutta,et al. Analysis of an EPC project: a solution to the resource constrained project scheduling problem using genetic algorithms , 2011 .
[14] Said Salhi,et al. An investigation into the relationship of heuristic performance with network-resource characteristics , 1997 .
[15] K. Raja,et al. Multi-project scheduling using an heuristic and a genetic algorithm , 2006 .
[16] Ario Ohsato,et al. A genetic algorithm-based method for scheduling repetitive construction projects , 2009 .
[17] Vincent A. Mabert,et al. Evaluating project scheduling and due date assignment procedures: an experimental analysis , 1988 .
[18] Ramón Alvarez-Valdés Olaguíbel,et al. Chapter 5 – HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS , 1989 .
[19] Rema Padman,et al. An integrated survey of deterministic project scheduling , 2001 .
[20] Mauricio G. C. Resende,et al. A genetic algorithm for the resource constrained multi-project scheduling problem , 2008, Eur. J. Oper. Res..
[21] Chandrasekharan Rajendran,et al. Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs , 2005, Comput. Ind. Eng..
[22] Kum Khiong Yang,et al. Scheduling a project to maximize its net present value: An integer programming approach , 1993 .
[23] Chandrasekharan Rajendran,et al. Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs , 2003 .
[24] Arun Kanda,et al. Scheduling of multiple projects with resource transfers , 2009, Int. J. Math. Oper. Res..
[25] Armin Scholl,et al. A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times , 2009 .
[26] Francisco Ballestín,et al. A hybrid genetic algorithm for the resource-constrained project scheduling problem , 2008, Eur. J. Oper. Res..
[27] María Pilar Tormos,et al. Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling , 2001, Ann. Oper. Res..
[28] Armin Scholl,et al. Managing and modelling general resource transfers in (multi-)project scheduling , 2010, OR Spectr..
[29] Sönke Hartmann,et al. A competitive genetic algorithm for resource-constrained project scheduling , 1998 .
[30] Chandrasekharan Rajendran,et al. Performance analysis of scheduling rules in resource–constrained multiple projects , 2009 .
[31] R. Kolisch,et al. Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis , 1999 .