Timber harvest planning—A combined optimization/simulation model

A special cascading fixed charge structure can be used to characterize a forest management planning problem in which the objectives are to identify the optimal shape of forest harvest cutting units and simultaneously to assign facilities for logging those units. We describe a four-part methodology that has been developed to assist forest managers in analyzing areas proposed for harvesting. This methodology performs an analysis of harvesting feasibility, computes the optimal solution to the cascading fixed charge problem, undertakes a GASP IV simulation to provide additional information about the proposed harvesting operation, and permits the forest manager to perform a time-cost analysis that may lead to a more realistic, and thus improved, solution.