A CUSUM chart for detecting the intensity ratio of negative events

This paper developed a single cumulative sum (CUSUM) scheme, called the UCUSUM chart, for simultaneously detecting the size N and time interval T of an event. The new chart used the information of size and frequency of the event and the UCUSUM chart is carried out using the only one statistic U, which contains both T and N; on the other hand, the UCUSUM chart could allocate the detection power to the T shifts and the N shifts. The results present that the UCUSUM chart is significantly powerful compared to other charts which are in the current research with either the time interval T or with the size N. The UCUSUM chart could be applied in many areas including industries and non-industries and the performance of the new chart shows it is much effective in example.

[1]  Chin-Yao Low,et al.  Design for an SPRT control scheme based on linguistic data , 2003 .

[2]  N. Balakrishnan,et al.  A generally weighted moving average chart for time between events , 2017 .

[3]  Chong Li An integrated approach to evaluating the production system in closed-loop supply chains , 2013 .

[5]  Thong Ngee Goh,et al.  A control chart for the Gamma distribution as a model of time between events , 2007 .

[6]  Thong Ngee Goh,et al.  Cumulative quantity control charts for monitoring production processes , 2000 .

[7]  Giovanni Celano,et al.  A variable sampling interval Shewhart control chart for monitoring the coefficient of variation in short production runs , 2017, Int. J. Prod. Res..

[8]  Zhang Wu,et al.  Design of the sum-of-conforming-run-length control charts , 2001, Eur. J. Oper. Res..

[9]  Marion R. Reynolds,et al.  Should Observations Be Grouped for Effective Process Monitoring? , 2004 .

[10]  Zhang Wu,et al.  A control scheme integrating the T chart and TCUSUM chart , 2011, Qual. Reliab. Eng. Int..

[11]  William H. Woodall,et al.  The Use of Control Charts in Health-Care and Public-Health Surveillance , 2006 .

[12]  Fred Spiring,et al.  Introduction to Statistical Quality Control , 2007, Technometrics.

[13]  Min Xie,et al.  Monitoring of Time-Between-Events with a Generalized Group Runs Control Chart , 2016, Qual. Reliab. Eng. Int..

[14]  Fugee Tsung,et al.  A new multivariate EWMA scheme for monitoring covariance matrices , 2014 .

[15]  Zhang Wu,et al.  A control scheme for monitoring the frequency and magnitude of an event , 2009 .

[16]  Zhen He,et al.  Statistical computation and analyses for attribute events , 2009, Comput. Stat. Data Anal..

[17]  Amitava Mukherjee,et al.  Design and implementation issues for a class of distribution-free Phase II EWMA exceedance control charts , 2017, Int. J. Prod. Res..

[18]  Stephen B. Vardeman,et al.  Average Run Lengths for CUSUM Schemes When Observations Are Exponentially Distributed , 1985 .

[19]  Thong Ngee Goh,et al.  Economic design of cumulative count of conforming charts under inspection by samples , 2008 .

[20]  Muhammad Aslam,et al.  A new t-chart using process capability index , 2017, Commun. Stat. Simul. Comput..

[21]  Yizhong Ma,et al.  Integration of SPC and performance maintenance for supply chain system , 2016 .

[22]  Thong Ngee Goh,et al.  Some effective control chart procedures for reliability monitoring , 2002, Reliab. Eng. Syst. Saf..

[23]  James M. Lucas,et al.  Counted Data CUSUM's , 1985 .

[24]  Fah Fatt Gan,et al.  Designs of One- and Two-Sided Exponential EWMA Charts , 1998 .

[25]  Min Xie,et al.  Design of exponential control charts based on average time to signal using a sequential sampling scheme , 2015 .

[26]  Giovanni Celano,et al.  The performance of the Shewhart-RZ control chart in the presence of measurement error , 2016 .

[27]  Connie M. Borror,et al.  Robustness of the time between events CUSUM , 2003 .