Using numerical modelling to address hydrologic forest management issues in British Columbia

This paper outlines how long-term statistical–deterministic physically based hydrologic modelling utilizing data from experimental watersheds in British Columbia (BC) can be used to fill knowledge gaps related to forest management in the BC Forest Practices Code, and discusses data and modelling issues that need to be considered in this context. Developing hydrologic model applications for these experimental watersheds will further provide insight regarding priorities for future data collection and will also advance our understanding of capabilities and limitations of physically based hydrologic models in addressing watershed management concerns in BC. Experience and expertise obtained in this fashion is a prerequisite for successful use of these hydrologic models in evaluating site-specific forest management issues at catchments with fewer data resources. Copyright © 2001 John Wiley & Sons, Ltd.

[1]  Dennis P. Lettenmaier,et al.  Dynamic modeling of orographically induced precipitation , 1994 .

[2]  M. Wigmosta,et al.  A distributed hydrology-vegetation model for complex terrain , 1994 .

[3]  Barry J. Adams,et al.  Design Storm Pathology , 1986 .

[4]  L. Band,et al.  Simulating the impact of road construction and forest harvesting on hydrologic response , 2001 .

[5]  Keith Beven,et al.  The future of distributed models: model calibration and uncertainty prediction. , 1992 .

[6]  R. Laprise,et al.  Climate and climate change in western canada as simulated by the Canadian regional climate model , 1998 .

[7]  C. Daly,et al.  A Statistical-Topographic Model for Mapping Climatological Precipitation over Mountainous Terrain , 1994 .

[8]  R. M. Rice,et al.  Modeling the Cumulative Watershed Effects of Forest Management Strategies , 1991 .

[9]  Keith Beven,et al.  Changing ideas in hydrology — The case of physically-based models , 1989 .

[10]  Soroosh Sorooshian,et al.  Calibration of rainfall‐runoff models: Application of global optimization to the Sacramento Soil Moisture Accounting Model , 1993 .

[11]  K. Loague,et al.  Hydrologic‐Response simulations for the R‐5 catchment with a comprehensive physics‐based model , 2001 .

[12]  B. Adams,et al.  Urban Stormwater Management Planning with Analytical Probabilistic Models , 2000 .

[13]  Dennis P. Lettenmaier,et al.  Effects of forest roads on flood flows in the Deschutes River, Washington , 2001 .

[14]  S. Running,et al.  Remote Sensing of Coniferous Forest Leaf Area , 1986 .

[15]  N. Smith,et al.  Estimating leaf area index and light extinction coefficients in stands of Douglas-fir (Pseudotsuga menziesii) , 1993 .

[16]  P. Storck Trees, snow and flooding: an investigation of forest canopy effects on snow accumulation and melt at the plot and watershed scales in the Pacific Northwest , 2000 .

[17]  Jennifer L. Dungan,et al.  Forest ecosystem processes at the watershed scale: basis for distributed simulation , 1991 .

[18]  E. Prepas,et al.  Forest harvest impacts on water quality and aquatic biota on the Boreal Plain: introduction to the TROLS lake program , 2001 .

[19]  Thomas A. McMahon,et al.  Physically based hydrologic modeling: 1. A terrain‐based model for investigative purposes , 1992 .

[20]  Ramakrishna R. Nemani,et al.  Extrapolation of synoptic meteorological data in mountainous terrain and its use for simulating forest evapotranspiration and photosynthesis , 1987 .

[21]  K. Beven,et al.  A physically based, variable contributing area model of basin hydrology , 1979 .

[22]  John W. Pomeroy,et al.  Coupled Modelling of Forest Snow Interception and Sublimation , 1998 .

[23]  C. Luce,et al.  INTRODUCTION TO SPECIAL ISSUE ON HYDROLOGIC AND GEOMORPHIC EFFECTS OF FOREST ROADS , 2001 .

[24]  G. Grant,et al.  Peak flow responses to clear-cutting and roads in small and large basins, western Cascades, Oregon , 1996 .

[25]  Dennis P. Lettenmaier,et al.  Application of a GIS-based distributed hydrology model for prediction of forest harvest effects on peak stream flow in the Pacific Northwest , 1998 .

[26]  G. Liston,et al.  Simulations of snow distribution and hydrology in a mountain basin , 1999 .

[27]  J. P. Kimmins,et al.  Modelling forest ecosystem net primary production : the hybrid simulation approach used in FORECAST , 1999 .

[28]  Thomas A. McMahon,et al.  Physically based hydrologic modeling: 2. Is the concept realistic? , 1992 .

[29]  Dennis P. Lettenmaier,et al.  Hydrologic effects of logging in western Washington, United States , 2000 .

[30]  I. Creed,et al.  Advances in Canadian forest hydrology, 1995–1998 , 2000 .

[31]  W. Megahan,et al.  Peak flow responses to clear‐cutting and roads in small and large basins, Western Cascades, Oregon: A second opinion , 1998 .

[32]  P. E. O'connell,et al.  An introduction to the European Hydrological System — Systeme Hydrologique Europeen, “SHE”, 1: History and philosophy of a physically-based, distributed modelling system , 1986 .

[33]  G. Grant,et al.  Comment on “Peak flow responses to clear‐cutting and roads in small and large basins, Western Cascades, Oregon: A second opinion” by R. B. Thomas and W. F. Megahan , 2001 .

[34]  Donald R. Satterlund,et al.  Snow catch by Contier Crowns , 1967 .

[35]  Robert A. Metcalfe,et al.  A statistical model of spatially distributed snowmelt rates in a boreal forest basin , 1998 .

[36]  G. Blöschl,et al.  Distributed Snowmelt Simulations in an Alpine Catchment: 1. Model Evaluation on the Basis of Snow Cover Patterns , 1991 .

[37]  John W. Pomeroy,et al.  WINTER RADIATION EXTINCTION AND REFLECTION IN A BOREAL PINE CANOPY: MEASUREMENTS AND MODELLING , 1996 .

[38]  R. Beschta,et al.  Peakflow responses to forest practices in the western cascades of Oregon, USA , 2000 .

[39]  D. Gluns,et al.  Snowfall interception on branches of three conifer species , 1991 .

[40]  R. Sidle A theoretical model of the effects of timber harvesting on slope stability , 1992 .

[41]  W. Megahan,et al.  Reply [to “Comment on ‘Peak flow responses to clear‐cutting and roads in small and large basins, Western Cascades, Oregon: A Second Opinion’ by R. B. Thomas and W. F. Megahan”] , 2001 .

[42]  R. Schmidt Sublimation of snow intercepted by an artificial conifer , 1991 .

[43]  R. Pike Current Limitations of Hydrologic Modeling In B.C.: An Examination of the HSPF, TOPMODEL, UBCWM and DHSVM Hydrologic Simulation Models, B.C. Data Resources and Hydrologic-Wildfire Impact Modeling , 1998 .

[44]  J. Refsgaard,et al.  Operational Validation and Intercomparison of Different Types of Hydrological Models , 1996 .

[45]  R. Winkler The effects of forest structure on snow accumulation and melt in south-central British Columbia , 2001 .

[46]  S. Running,et al.  8 – Generalization of a Forest Ecosystem Process Model for Other Biomes, BIOME-BGC, and an Application for Global-Scale Models , 1993 .