Management Strategies for 5D-BIM Adoption in Hong Kong

5D-BIM, a well-acknowledged innovation in construction, has been recognized to have positive influence on project performance and organizational effectiveness by both academic scholars and industry practitioners. In spite of such awareness and recognition, its adoption is still in the early stage in Hong Kong quantity surveying due to various challenges. Therefore, this research aims at investigating how 5D-BIM can be fostered by providing an overview of innovation in Hong Kong quantity surveying firstly, then exploring the impacts of various management strategies on 5D-BIM adoption and followed by giving some implementation strategies finally. The results of the questionnaire survey study indicate that innovation (5D-BIM) adoption is positively predicted by innovation climate and learning transfer climate and that 5D-BIM adoption in heterogeneous construction parties are motivated by different factors of innovation and learning transfer climates (e.g., support for innovation, performance self-efficacy, openness to change are essential management strategy factors for innovation in client developers’ organizations; factors of support for innovation and openness to change are important to innovation in contractors’ organizations; and factors of resource supply and performance-outcome expectation are essential to innovation in consultants’ organizations). Then cases of 5D-BIM adoption in Hong Kong are offered to validate the survey findings and to serve as the basis for proposing 5D-BIM implementation strategies for major construction parties.

[1]  S. Siegel,et al.  Measuring the perceived support for innovation in organizations. , 1978 .

[2]  M. Mumford,et al.  Creativity syndrome: Integration, application, and innovation. , 1988 .

[3]  F. Damanpour Organizational Innovation: A Meta-Analysis Of Effects Of Determinants and Moderators , 1991 .

[4]  Mary L. Broad,et al.  Transfer Of Training: Action-packed Strategies To Ensure High Payoff From Training Investments , 1992 .

[5]  S. Scott,et al.  DETERMINANTS OF INNOVATIVE BEHAVIOR: A PATH MODEL OF INDIVIDUAL INNOVATION IN THE WORKPLACE , 1994 .

[6]  Sree Nilakanta,et al.  Organizational innovativeness: Exploring the relationship between organizational determinants of innovation, types of innovations, and measures of organizational performance , 1996, Omega.

[7]  E. Sarah Slaughter,et al.  Models of Construction Innovation , 1998 .

[8]  Elwood F. Holton,et al.  Development of a generalized learning transfer system inventory , 2000 .

[9]  Thiagarajan Ravichandran,et al.  An innovation diffusion model of TQM implementation , 2001, IEEE Trans. Engineering Management.

[10]  Albert G Z Hu R&D organization, monitoring intensity, and innovation performance in chinese industry , 2003 .

[11]  Anona Armstrong,et al.  Foundations for a learning organization: organization learning mechanisms , 2003 .

[12]  E. C. Martins,et al.  Building organisational culture that stimulates creativity and innovation , 2003 .

[13]  J Gao,et al.  Experiences with 3D and 4D CAD on Building Construction Projects: Benefits for Project Success and Controllable Implementation Factors , 2005 .

[14]  Samer Khasawneh,et al.  Organizational Learning Culture, Learning Transfer Climate and Perceived Innovation in Jordanian Organizations , 2005 .

[15]  Moonseo Park,et al.  A hierarchical structural model of assessing innovation and project performance , 2005 .

[16]  Kalle Lyytinen,et al.  Wakes of Innovation in Project Networks: The Case of Digital 3-D Representations in Architecture, Engineering, and Construction , 2007, Organ. Sci..

[17]  L. Gumusluoglu,et al.  Transformational Leadership, Creativity, and Organizational Innovation , 2009 .

[18]  Gregor Cerinsek,et al.  Identifying employees' innovation competency in organisations , 2009 .

[19]  Ricardo Jardim-Goncalves,et al.  Value proposition on interoperability of BIM and collaborative working environments , 2010 .

[20]  John P. Ulhøi,et al.  Employee‐driven innovation: extending the license to foster innovation , 2010 .

[21]  Stuart D. Green Making Sense of Construction Improvement: Green/Making Sense of Construction Improvement , 2011 .

[22]  David Birchall,et al.  Innovation performance measurement: current practices, issues and management challenges , 2011, Int. J. Technol. Manag..

[23]  Luca Mari,et al.  A model for R&D performance measurement , 2011 .

[24]  Stuart D. Green Making Sense of Construction Improvement , 2011 .

[25]  Salman Azhar,et al.  Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry , 2011 .

[26]  Anita M. M. Liu,et al.  Examining middle managers' influence on innovation in construction professional services firms: A tale of three innovations , 2012 .

[27]  Sam Kubba Building Information Modeling , 2012 .