Dynamic Simulation on the Installation Process of HGIS in Transformer Substation

Abstract The technological requirements of Hypid Gas Insulated Switchgear (HGIS) installation in transformer substation is high and the control points of quality is excessive. Most of the engineers and technicians in the construction enterprises are not familiar with equipments of HGIS. In order to solve these problem, equipments of HGIS is modeled on the computer by SolidWorks software. Installation process of civil foundation and closed-type equipments is optimized dynamically with virtual assemble technology. Announcements and application work are composited into animation file. Skills of modeling and simulation is tidied classify as well. The result of the visual dynamic simulation can instruct the actual construction process of HGIS to a certain degree and can promote reasonable construction planning and management. It can also improve the method and quality of staff training for electric power construction enterprises.