Evaluation of control system reliability using combined dynamic fault trees and Markov models

In this paper, dynamic simulation methods for reliability evaluation of common industry-based control system architectures are investigated. Control system design often employs complex reliability structures in the forms of several levels of software and hardware redundancies, hot and cold standby systems. This is required in order to achieve certain plant availability and safety functions. Control system maintenance requires expert knowledge due to the complexity of troubleshooting steps involved with a hardware or software failures of a large system. Hence, it is crucial to understand the effect of recovery time on reliability and on overall availability in a critical control system. Dynamic Fault Tree Analysis (DFTA), Markov Chains and Reliability Block Diagrams (RBD) are presented and a block library is introduced for addressing the aforementioned modelling problems. In order to be able to evaluate dynamic fault trees and Markov Chains, Monte Carlo simulation has been used. An industry-based case study is presented, where critical failures of a redundant Programmable Logic Controller (PLC) system are identified by a Failure Mode and Effect Analysis (FMEA). The bottom up process of modelling control system reliability is discussed.

[1]  Diego Dominici The Inverse of the Cumulative Standard Normal Probability Function , 2003 .

[2]  Pavel Praks,et al.  Monte Carlo and fault tree aproaches in reliability applications of gas transmission network , 2014, Proceedings of the 2014 15th International Scientific Conference on Electric Power Engineering (EPE).

[3]  Ajit Srividya,et al.  Dynamic fault tree analysis using Monte Carlo simulation in probabilistic safety assessment , 2009, Reliab. Eng. Syst. Saf..

[4]  Zahir Tari,et al.  A Probabilistic Model to Predict the Survivability of SCADA Systems , 2013, IEEE Transactions on Industrial Informatics.

[5]  Hong-Zhong Huang,et al.  A New Ordering Method of Basic Events in Fault Tree Analysis , 2012, Qual. Reliab. Eng. Int..

[6]  Slobodan Jovanovic,et al.  Reliability and Availability Modeling of Uninterruptible Power Supply (UPS) Systems using Monte-Carlo Simulation , 2013 .

[7]  R. Bell,et al.  IEC 61508: functional safety of electrical/electronic/ programme electronic safety-related systems: overview , 1999 .

[8]  Lars Rosén,et al.  Approximate dynamic fault tree calculations for modelling water supply risks , 2012, Reliab. Eng. Syst. Saf..

[9]  Ferdinando Chiacchio,et al.  Dynamic fault trees resolution: A conscious trade-off between analytical and simulative approaches , 2011, Reliab. Eng. Syst. Saf..

[10]  Yiannis Papadopoulos,et al.  Synthesis and analysis of temporal fault trees with PANDORA : The time of Priority AND gates , 2008 .

[11]  Salvatore J. Bavuso,et al.  Fault trees and Markov models for reliability analysis of fault-tolerant digital systems , 1993 .

[12]  Stefan Kowalewski,et al.  Hardware/Software Design Considerations for Automotive Embedded Systems , 2008, IEEE Transactions on Industrial Informatics.

[13]  R. Virrankoski,et al.  Reliability evaluation and comparison for next-generation substation function based on IEC 61850 using Monte Carlo simulation , 2013, 2013 1st International Conference on Communications, Signal Processing, and their Applications (ICCSPA).