Petri Nets for Project Management and Resource Levelling
暂无分享,去创建一个
O. V. Krishnaiah Chetty | V. A. Jeetendra | O. V. Krishnaiah Chetty | J. Prashanth Reddy | V. A. Jeetendra | J. Prashanth Reddy
[1] Gary E. Whitehouse,et al. GENRES: An extension of Brooks Algorithm for project scheduling with resource constraints , 1979 .
[2] O. V. Krishnaiah Chetty,et al. Priority nets for scheduling flexible manufacturing systems , 1993 .
[3] F. F. Boctor,et al. Some efficient multi-heuristic procedures for resource-constrained project scheduling , 1990 .
[4] J. D. Wiest,et al. A management guide to PERT/CPM: With GERT/PDM/DCPM and other networks , 1977 .
[5] Hartmann J. Genrich. Predicate/transition nets , 1987 .
[6] Gerald L. Moeller,et al. Operations Planning with VERT , 1981, Oper. Res..
[7] Srini Ramaswamy,et al. Petri net extensions for the development of MIMO net models of automated manufacturing systems , 1997 .
[8] F. F. Boctor. Heuristics for scheduling projects with resource restrictions and several resource-duration modes , 1993 .
[9] Nabil A. Kartam,et al. Potential of artificial neural networks for resource scheduling , 1997, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.
[10] Fayez F. Boctor,et al. A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes , 1996 .
[11] Tadao Murata,et al. Petri nets: Properties, analysis and applications , 1989, Proc. IEEE.
[12] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .