Defects and rework in new build: an analysis of the phenomenon and drivers

Purpose – The purpose of this paper is to look at the continued media attention surrounding defects, and the resulting “rework”, in new build projects, especially homes.Design/methodology/approach – This paper evaluates the literature on defects and rework in new build projects, with an emphasis on housing, and identifies a number of issues within the underlying research agenda.Findings – Suggestions are put forward as to how predictor models may be focused to drive impetus for the development of a greater number of analytical tools which industry participants can use to characterize, model, evaluate and inform, decisions about defects and rework.Research limitations/implications – The house‐building segment of the construction industry is important since it is clearly outward facing and monitored by a range of interested stakeholders. The findings of this study will hopefully provide impetus to the search for alternative approaches to be taken to the elimination or reduction in new house defects.Original...

[1]  Raymond T. Aoieong,et al.  A comparison of quality management systems in the construction industries of Hong Kong and the USA , 2005 .

[2]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[3]  L. Koskela Is structural change the primary solution to the problems of construction? , 2003 .

[4]  Lauri Koskela,et al.  Foundations of concurrent engineering , 2006 .

[5]  Peter E.D. Love,et al.  Forensic project management: The underlying causes of rework in construction projects , 2004 .

[6]  Justine Brown,et al.  Re-engineering the construction process in the speculative house-building sector , 2003 .

[7]  H. Abdul-Rahman The cost of non-conformance during a highway project: a case study , 1995 .

[8]  W. B. Ledbetter,et al.  Causes of Quality Deviations in Design and Construction , 1992 .

[9]  Aminah Robinson Fayek,et al.  Developing a Standard Approach for Construction Field Rework Assessment , 2003 .

[10]  D. R. Friedrich,et al.  Revisions, repairs, and rework on large projects , 1987 .

[11]  J. Barlow,et al.  Achieving 'Customer Focus' in Private Housebuilding: Current Practice and Lessons from Other Industries , 2003 .

[12]  M. Ball Housing and construction: A troubled relationship? , 1996 .

[13]  Peter Aspinall,et al.  Preferences, Quality and Choice in New-Build Housing , 2004 .

[14]  Peter E.D. Love,et al.  Using systems dynamics to better understand change and rework in construction project management systems , 2002 .

[15]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[16]  David Gann,et al.  Construction skills training for the next millennium , 1998 .

[17]  Peter E.D. Love,et al.  Determining the causal structure of rework influences in construction , 1999 .

[18]  Andrew R. Atkinson,et al.  The pathology of building defects; a human error approach , 2002 .

[19]  Andrew R. Atkinson Human error in the management of building projects , 1998 .

[20]  A. Sohal,et al.  Capturing rework costs in projects , 2003 .

[21]  M. Talat Birgonul,et al.  Cost-based analysis of quality in developing countries : a case study of building projects , 2005 .

[22]  Andrew R. Atkinson The role of human error in construction defects , 1999 .

[23]  Barrie Dale,et al.  The Management of Quality:: A Top Management View , 1984 .

[24]  James A. Powell,et al.  Defects liability management by design , 2006 .

[25]  Peter E.D. Love,et al.  A seamless supply chain management model for construction , 2004 .

[26]  P.-E Josephson,et al.  The causes and costs of defects in construction. A study of seven building projects , 1999 .

[27]  J. L. Ashford,et al.  The Management of Quality in Construction , 2002 .

[28]  John Bowers,et al.  The role of system dynamics in project management , 1996 .

[29]  J. Barlow,et al.  From Craft Production to Mass Customisation. Innovation Requirements for the UK Housebuilding Industry , 1999 .

[30]  Per-Erik Josephson,et al.  Strategies for error reduction in building: attitudes to continuity and control in seven projects , 1999 .

[31]  J. H. Rogerson,et al.  A quantitative study of post contract award design changes in construction , 1999 .

[32]  Finland,et al.  Fast or concurrent: The art of getting construction improved , 1997 .

[33]  S. Cochrane,et al.  Development of a customer focused strategy in speculative house building , 1999 .

[34]  Peter E.D. Love,et al.  Determinants of rework in building construction projects , 2004 .

[35]  Lam Iso 9000 in Construction , 1994 .

[36]  Per-Erik Josephson,et al.  THE ROLE OF EARLY DETECTION OF HUMAN ERRORS IN BUILDING PROJECTS , 2001 .

[37]  Jennifer Rowley Knowing your customers , 1997 .

[38]  Per-Erik Josephson,et al.  Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry , 2002 .

[39]  Mohan M. Kumaraswamy,et al.  ISO 9000 and beyond: from a Hong Kong construction perspective , 2000 .

[40]  David Craig,et al.  Developing a Customer-focused Culture in the Speculative House-building Industry , 2004 .

[41]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[42]  Low Sui Pheng,et al.  Improving maintenance and reducing building defects through ISO 9000 , 2001 .

[43]  Peter E.D. Love,et al.  A Benchmark Study on Housing Defects in Victoria, Australia , 2004 .

[44]  Luis F. Alarcón,et al.  Improving the Design-Construction Interface , 1998 .

[45]  C. Tomkins,et al.  Quality failure costs in civil engineering projects , 2000 .

[46]  James T. O'Connor,et al.  Industrial Project Constructability Improvement , 1986 .

[47]  Alfredo Serpell,et al.  Quality in construction: The situation of the Chilean construction industry , 2002 .

[48]  Ekambaram Palaneeswaran,et al.  Formulating a framework for relationally integrated construction supply chains , 2003 .

[49]  Sadi Assaf,et al.  The effect of faulty design on building maintenance , 1997 .

[50]  Barry A. Richardson,et al.  Defects and deterioration in buildings , 1998 .

[51]  Peter E.D. Love,et al.  Calculating total rework costs in Australian construction projects , 2005 .

[52]  Peter E.D. Love,et al.  Modelling the dynamics of design error induced rework in construction , 2000 .

[53]  Alan Griffith Quality Assurance in Building , 1990 .

[54]  James Sommerville,et al.  Defects in new homes: an analysis of data on 1,696 new UK houses , 2006 .

[55]  Seow Eng Ong,et al.  Building defects, warranties and project financing from pre‐completion marketing , 1997 .

[56]  James Sommerville,et al.  The standardisation of construction snagging , 2004 .

[57]  Julian Diaz,et al.  The use of information versus asking price in the real property negotiation process , 1996 .

[58]  H. W. Chung Understanding quality assurance in construction : a practical guide to ISO9000 , 1999 .

[59]  Jim. Georgiou Comparison of defects in houses constructed by owners and registered builders in Victoria 1988-1996 , 2000 .

[60]  Peter E.D. Love,et al.  A comparison of defects in houses constructed by owners and registered builders in the Australian State of Victoria , 1999 .